Project overview

Shree Enclave is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000020704. Shree Enclave is located at Palghar. This is a New Project being developed by Shree Construction.

Shree Enclave has 1 BHK & 1RK Apartments with carpet areas ranging from 325 to 435 Sq.ft. Carpet. The Project has total 30 of which 30 are currently available for sale.

Shree Enclave is being developed on a total land area of 16146 Sq.ft. out of which 16146 Sq.ft. i.e 100% is reserved for recreational purposes. Shree Enclave has 2 Wings / Towers A Wing,B Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Shree Enclave
  • Location:
  • Palghar
  • Const. Stage:
    New Project
  • Possession:
    30 Mar 2024
Developer Details

  • Developer:
    Shree Construction
  • Phone:
  • Address:
  • Shop No. 7, Sai Jyoti Apartment, Ostwal Nagari, Ostwal Nagari, Nallasopara East, 401209
Project RERA Details
MAHA REARA No: P99000020704
Project Type Residential
RERA Project Status New Project
Funding Bank ALLAHBAD BANK
Proposed Possession 30 Mar 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 02 Jan 2021
Last Retrived 28 Jul 2025
Shree Enclave QR Code
Shree Enclave
MahaRERA - P99000020704
Apartment Details & Configuration
TypeArea
1 BHK37.92 Sq.mts. ( 408 Sq.ft. )
1 BHK40.43 Sq.mts. ( 435 Sq.ft. )
1RK30.2 Sq.mts. ( 325 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shree Enclavelast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electrical Meter Room To Be Provided
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Tree Planting To Be Provided
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)20% completed
20% Complete
Sewerage (Chamber Lines) Wip
Solid Waste Management And Disposal
Na
Storm Water Drains
Yet To Be Provided
Street Lighting
Yet To Be Provided
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting To Be Provided
Water Supply100% completed
95% Complete
Borewell Has Been Completed
Buildings / Wings in Shree Enclave
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shree Enclave by Shree Constructionlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

16146 Sq. ft.

Project Area

16146 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

30 apartments in total
Total
30
Booked
0
Available
30

Saleable Area Statistics (Sq. ft.)

12071 Total
Total
12071
Booked
0
Available
12071
Total 30 apartments in project. 0 apartments booked. 0% apartments booked.
Total 12071 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingMar 2023410100100
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.92 Sq.mts. ( 408 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK40.43 Sq.mts. ( 435 Sq.ft. )6
None Booked0% Booked
0% Booked
1RK30.2 Sq.mts. ( 325 Sq.ft. )3
None Booked0% Booked
0% Booked
15 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building A WingCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingMar 2023410100100
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.92 Sq.mts. ( 408 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK40.43 Sq.mts. ( 435 Sq.ft. )6
None Booked0% Booked
0% Booked
1RK30.2 Sq.mts. ( 325 Sq.ft. )3
None Booked0% Booked
0% Booked
15 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building B WingCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Shree Construction
for Project
Shree Enclave
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation