Project overview

Shree Dattakrupa Height Buidling No 125 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800012504. Shree Dattakrupa Height Buidling No 125 is located at Cts No.2 Pt Of Village Kurla Iii. This is a Ongoing being developed by Ekdanta Constructions Pvt Ltd.

Shree Dattakrupa Height Buidling No 125 has 1 BHK, 2 BHK, 2 BHK A, 3 BHK B & Regugee Fitness Cent Apartments with carpet areas ranging from 0 to 840 Sq.ft. Carpet. The Project has total 91 of which 8 are currently available for sale.

Shree Dattakrupa Height Buidling No 125 is being developed on a total land area of 10625 Sq.ft. Shree Dattakrupa Height Buidling No 125 has 2 Wings / Towers Shree Dattakrupa Tower Wing A,Shree Dattakrupa Tower Wing B

ProjectDeveloperLocationPossession
Shree Siddhi Bldg No 69Hiranimanthan Builders And Developers12 Pt31-03-2020 00:00:00
Venus TowersVenus EnterprisesMumbai Suburban31-12-2020 00:00:00
Sagar C.H.SHiranimanthan Builders And Developers12 Pt31-12-2019 00:00:00
Zia Complex Wing EI. R. ConstructionMumbai Suburban, 40007030-09-2020 00:00:00
East Point.A A Property DevelopersCts No 6P And 7 P Kurla E Mumbai Suburban30-12-2027 00:00:00
Nehru Nagar Sharada Chs Ltd Bldg No. 62Parsn Construction And Developers Private LimitedVillage Kurla Iii30-12-2022 00:00:00
Ratnadeep Chs LtdS D Bhalerao Constructions Pvt Ltd Bldg No 60 JvSambar Galli31-05-2019 00:00:00
Kuber Varshatai TowerAnand Dattatraya Patil267/C.T.S No.2, 22931-12-2019 00:00:00
Nehru Nagar Nishigandha Chs LtdAishwarya Builders & Developers65/ 12 Part/ 229 And 26731-12-2019 00:00:00
MeridiaAccord Builders80 To 132, 112Pt, 111Pt, 111/1 To 7030-10-2021 00:00:00
Kurla Sahayog Chs Ltd., Bldg. No.68Parsn Construction And Developers Private Limited267 Cts No 12, Plot Bearing S N 22930-06-2018 00:00:00
Serene ShelterBuildtech GroupCts 6Pt 7Pt Savera Chs Village Kurla Iiinehru Nahar Sg Barve Marg Kurla East Mum2430-12-2024 00:00:00
Nehru Nagar Panchratna Chs Ltd, Bldg. No.5Parsn Construction And Developers Private LimitedTaluka Kurla 400024., Village Kurla Iii, Survey No. 229 And 26730-06-2021 00:00:00
Veer Siddhanak Chs LtdOm Sai Griha Nirman Pvt Ltd114/1601-01-2023 00:00:00
Nehru Nagar Vishwadham Chs LtdApcon Construction CompanyBuilding No 47 City Survey No 12 Pt Mauje Kurla Nehru Nagar Kurla Dist Bandra Mumbai31-12-2019 00:00:00
Puneet KalpavrikshaPuneet Prateeksha SpacesS No 229 S No 267 Cts 11 Pt30-06-2025 00:00:00
Raghav NovaVaidehi Construction & Developers2 Part And 64031-07-2023 00:00:00
Kings My HomesNilesh Laxmikant KudalkarCts No 295 And 37331-12-2029 00:00:00
Gulraj HeightsM/S Neeta Developer4C And Ac/1 To 4C/2231-03-2018 00:00:00
Galaxy Apartments Cdf WingsHousing Development And Infrastructure Ltd13-Pt, 13/3-Pt, 13/2-Pt31-01-2021 00:00:00
Chishtiya HeightsRajdeep Associates190, 191/1 To 930-11-2018 00:00:00
Ekta Co-Op Hsg SocietySurjit Bhojsingh Ailsinghani7 Pt, 6/140 To 144, 6 Pt30-12-2023 00:00:00
Swanand Bldg No 33Hiranimanthan Builders And Developers11 Pt31-12-2019 00:00:00
Orchid MetropolisBharat Mahan Developers & Builders9A And 10/1A31-07-2018 00:00:00
Rajal GodavariNisar Properties Pvt. Ltd.Mumbai Suburban31-12-2025 00:00:00
Serene ShelterNishat Ansari40002431-12-2025 00:00:00
PrimestoneKherectors Llp13030-06-2025 00:00:00
Ruparel LiviaShree Siddhivinayak Classic Construction Private LimitedCts No 11, Nehru Nagar30-06-2024 00:00:00
Raghav One45Raghav Raj Builders & Developers Llp228-02-2023 00:00:00
Shamim Tower C WingPramod Pisal6 Part31-01-2023 00:00:00
Mantri Business PlazaMantri BrothersPlot No 239 And 239 1 To 3530-12-2021 00:00:00
Shree Swami Samarth KrupaShoreline Builders Pvt LtdC T S No 11 Pt Survey No 229 26715-08-2024 00:00:00
Raghav OneRaghav Raj Builders & Developers Llp230-06-2021 00:00:00
Puneet Prime Phase 2 Floor 3 To Floor 16Puneet Builders12Pt, 267 Cts 11Pt, S No 22930-06-2025 00:00:00
Puneet Prime Phase 3 Floor 17 To Floor 18Puneet BuildersS No 229, 12Pt, 267 Cts 11Pt30-06-2025 00:00:00
Puneet Prime Phase 1 Floor 0 To Floor 2Puneet Builders12 Pt, S.No.229, 267 Cts No 11Pt30-06-2025 00:00:00
Jai Shreeram Prasanna ChslRiyaz Ramzan Shah939 / 1 To 4, Cts 93903-06-2022 00:00:00
Nehru Nagar Ekta Co Op Hsg Soc LtdRachana Homes11 Pt30-09-2018 00:00:00
Surbhi Co-Operative Housing Society LtdStans Buildtech AssociateCts No 11 Part, Survey Nos 229 And 26731-12-2018 00:00:00
Madhukunj Chs LtdUnity Land Consultancy6 Part31-12-2018 00:00:00
ViveAccord Builders108, 107/1 To 930-06-2023 00:00:00
Manraj ResidencyRajan Lilaram Nathani HufCts No.492, 492/1 To 931-12-2027 00:00:00
Highrise HeightsShahnawaz KhanL Ward Of Mcgm Kurla West31-12-2024 00:00:00
Nehru Nagar Shiv Vaibhav Chs Ltd Bldg No 38Parsn Construction And Developers Private LimitedSurvey No 229 And 267, Cts No 12 Part31-12-2025 00:00:00
Gagan 45Gagangiri Developers267 Of Kurla-Iii, Survey No. 229, Cts No. 12 Pt.31-12-2025 00:00:00
Mass MetropolisGrace Urban Development Corporation116, 183530-12-2024 00:00:00
Shree Dattakrupa Height Buidling No 125Ekdanta Constructions Pvt LtdCts No.2 Pt Of Village Kurla Iii01-12-2018 00:00:00
Nehru Nagar Amrapali Chs LtdSamruddhi DevelopersSurvey No.229 267 Cts 2 Part31-12-2018 00:00:00
School View Shreyas Chs LtdMajestic Royale Developers1474/1 To 4, 147430-09-2024 00:00:00
Retiwala HeightsSiraj Ahmed Sohrab Khan580, 580/1 To 1501-01-2025 00:00:00
Elite ResidencyElite Construction Co.94731-12-2025 00:00:00
Rajal - Om Jaishriram Chs LtdNisar Properties Pvt. Ltd.Cts No 977-A31-12-2017 00:00:00
Raghav EnclaveRaghav Raj Builders & Developers Llp12 Part31-12-2027 00:00:00
Sayba TulipStar RaiseCts No.12 (Pt), Survey No 229 (Pt) And 267 (Pt)31-03-2027 00:00:00
Nehru Nagar Nirmal C.H.S. Ltd.Deraiya Realtors Private LimitedCts No 11 Part Survey Nos 229 And 26731-12-2026 00:00:00
Pr HeightsPankhi Reliable Developers Llp336, 336/1To531-03-2025 00:00:00
Sayba ElegantStar Aura12(Pt)31-03-2026 00:00:00
Ratnadeep HeightsKrv RealtyCity Survey No12 (Part)31-10-2026 00:00:00
Sayba SapphireStar EmbassyCts No 187 To 187 / 1 To 931-12-2026 00:00:00
Ruparel Crest Bharat Mahan Developers & BuildersCts 11 Pt 1 To 9 Cts 11 Pt 214 To 21631-12-2025 00:00:00
Project Details
  • Project:
    Shree Dattakrupa Height Buidling No 125
  • Location:
  • Cts No.2 Pt Of Village Kurla Iii
  • Const. Stage:
    Ongoing
  • Possession:
    01 Dec 2018
Developer Details

  • Developer:
    Ekdanta Constructions Pvt Ltd
  • Phone:
  • Address:
  • T.N.Dhanajay C.H.S Ltd
Project RERA Details
MAHA REARA No: P51800012504
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Mrrajendra Karnik
Funding Bank BANK OF MAHARASHTRA
Proposed Possession 01 Dec 2018
Revised Possession 01 Dec 2018
Extended Possession
Litigations No Litigations
Last Modified 01 Sep 2017
Last Retrived 26 Jul 2025
Shree Dattakrupa Height Buidling No 125 QR Code
Shree Dattakrupa Height Buidling No 125
MahaRERA - P51800012504
Apartment Details & Configuration
TypeArea
1 BHK39.72 Sq.mts. ( 428 Sq.ft. )
1 BHK A40.01 Sq.mts. ( 431 Sq.ft. )
1 BHK B40.09 Sq.mts. ( 432 Sq.ft. )
2 BHK41.35 Sq.mts. ( 445 Sq.ft. )
2 BHK B51.8 Sq.mts. ( 558 Sq.ft. )
Refugee0 Sq.mts. ( 0 Sq.ft. )
1 BHK45.33 Sq.mts. ( 488 Sq.ft. )
2 BHK56.82 Sq.mts. ( 612 Sq.ft. )
2 BHK A62.29 Sq.mts. ( 670 Sq.ft. )
3 BHK B78.03 Sq.mts. ( 840 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shree Dattakrupa Height Buidling No 125last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Electrical Meter Room
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Applied For Fire Noc
Landscaping & Tree Planting95% completed
95% Complete
Noc From Garden Deparment Is Awaited
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Sewerage Connection Noc Obtained From Mcgm
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Storm Water Completion Obtained From Consultant
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting95% completed
95% Complete
Rain Water Harvesting Completion Remark Awaited
Water Supply95% completed
95% Complete
Permanent Conectn From Mcgm 2 B Conectd Post O.C.
Buildings / Wings in Shree Dattakrupa Height Buidling No 125
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shree Dattakrupa Height Buidling No 125 by Ekdanta Constructions Pvt Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

10625 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

91 apartments in total
Total
91
Booked
83
Available
8

Saleable Area Statistics (Sq. ft.)

44416 Total
Total
44416
Booked
41303
Available
3113
Total 91 apartments in project. 83 apartments booked. 91% apartments booked.
Total 44416 Sq.ft. saleable area. 41303 saleable area booked.
93% area booked.

Shree Dattakrupa Tower Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shree Dattakrupa Tower Wing AJan 190014101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.72 Sq.mts. ( 428 Sq.ft. )13
13 Booked100% Booked
100% Booked
1 BHK A40.01 Sq.mts. ( 431 Sq.ft. )12
12 Booked100% Booked
100% Booked
1 BHK B40.09 Sq.mts. ( 432 Sq.ft. )13
13 Booked100% Booked
100% Booked
2 BHK41.35 Sq.mts. ( 445 Sq.ft. )10
10 Booked100% Booked
100% Booked
2 BHK B51.8 Sq.mts. ( 558 Sq.ft. )3
1 Booked33% Booked
33% Booked
Refugee0 Sq.mts. ( 0 Sq.ft. )1
None Booked0% Booked
0% Booked
52 total apartments / 49 apartments booked. 94% apartments booked.
Work Description in Building Shree Dattakrupa Tower Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress90% done
90% Booked
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Shree Dattakrupa Tower Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shree Dattakrupa Tower Wing BJan 190014101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK45.33 Sq.mts. ( 488 Sq.ft. )13
12 Booked92% Booked
92% Booked
2 BHK56.82 Sq.mts. ( 612 Sq.ft. )11
11 Booked100% Booked
100% Booked
2 BHK A62.29 Sq.mts. ( 670 Sq.ft. )12
11 Booked91% Booked
91% Booked
3 BHK B78.03 Sq.mts. ( 840 Sq.ft. )1
None Booked0% Booked
0% Booked
Regugee Fitness Cent0 Sq.mts. ( 0 Sq.ft. )2
None Booked0% Booked
0% Booked
39 total apartments / 34 apartments booked. 87% apartments booked.
Work Description in Building Shree Dattakrupa Tower Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress90% done
90% Booked
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Ekdanta Constructions Pvt Ltd
for Project
Shree Dattakrupa Height Buidling No 125
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation