Project overview

Shree Ashtavinayak Vastu Prakalpa is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700016873. Shree Ashtavinayak Vastu Prakalpa is located at 561 And 57. This is a New being developed by Balkrishna Kashinath Bhoir.

Shree Ashtavinayak Vastu Prakalpa has RESIDENTIAL Apartments with carpet areas ranging from 6025 to 6025 Sq.ft. Carpet. The Project has total 56 of which 56 are currently available for sale.

Shree Ashtavinayak Vastu Prakalpa is being developed on a total land area of 12050 Sq.ft. out of which 9741 Sq.ft. i.e 81% is reserved for recreational purposes. Shree Ashtavinayak Vastu Prakalpa has 2 Wings / Towers 10,11

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Shree Ashtavinayak Vastu Prakalpa
  • Location:
  • 561 And 57
  • Const. Stage:
    New
  • Possession:
    30 Mar 2021
Developer Details

  • Developer:
    Balkrishna Kashinath Bhoir
  • Phone:
  • Address:
  • Shree Ashtavinayak Vastu Prakalpa
Project RERA Details
MAHA REARA No: P51700016873
Project Type Residential / Group Housing
RERA Project Status New
Architect Sunil M Bhirud
Funding Bank STATE BANK OF INDIA
Proposed Possession 30 Mar 2021
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 20 Jun 2018
Last Retrived 26 Jul 2025
Shree Ashtavinayak Vastu Prakalpa QR Code
Shree Ashtavinayak Vastu Prakalpa
MahaRERA - P51700016873
Apartment Details & Configuration
TypeArea
RESIDENTIAL559.75 Sq.mts. ( 6025 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shree Ashtavinayak Vastu Prakalpalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Meter Room Only
Energy management
Solar Water
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Not Ready
Open Parking
Not Ready
Sewerage (Chamber, Lines, Septic Tank , STP)50% completed
50% Complete
In Progress
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Septic Tank
Water Conservation, Rain water Harvesting10% completed
10% Complete
10% Ready
Water Supply60% completed
60% Complete
In Progress
Buildings / Wings in Shree Ashtavinayak Vastu Prakalpa
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shree Ashtavinayak Vastu Prakalpa by Balkrishna Kashinath Bhoirlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

12050 Sq. ft.

Project Area

9741 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

56 apartments in total
Total
56
Booked
0
Available
56

Saleable Area Statistics (Sq. ft.)

337408 Total
Total
337408
Booked
0
Available
337408
Total 56 apartments in project. 0 apartments booked. 0% apartments booked.
Total 337408 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

10

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
10Sep 20208101041
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL559.75 Sq.mts. ( 6025 Sq.ft. )28
None Booked0% Booked
0% Booked
28 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building 10Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress35% done
35% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress50% done
50% Booked

11

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
11Sep 20208101041
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL559.75 Sq.mts. ( 6025 Sq.ft. )28
None Booked0% Booked
0% Booked
28 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building 11Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress35% done
35% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress50% done
50% Booked
Channel Partners
Channel Partners Registered by Developer
Balkrishna Kashinath Bhoir
for Project
Shree Ashtavinayak Vastu Prakalpa
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation