Project overview

Shivam Complex Phase - 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000015165. Shivam Complex Phase - 1 is located at Survey Number - 112/1. This is a Ongoing being developed by Manoj Ramanand Prajapati.

Shivam Complex Phase - 1 has 1 BHK & 2 BHK Apartments with carpet areas ranging from 294 to 467 Sq.ft. Carpet. The Project has total 104 of which 19 are currently available for sale.

Shivam Complex Phase - 1 is being developed on a total land area of 39571 Sq.ft. out of which 4881 Sq.ft. i.e 12% is reserved for recreational purposes. Shivam Complex Phase - 1 has 2 Wings / Towers Building Number - 1,Building Number - 2

ProjectDeveloperLocationPossession
Yashdeep ResidencyUs Infra Housing Private Limited410203, Raigarh07-12-2018 00:00:00
Prathmesh HeightsSubhash Ramachandra SuryavanshiCts No 285231-01-2019 00:00:00
KohinoorSaleji Construction Private LimitedPlot No 44A, Cts No. 1660/1662/1663/1780/44/131-12-2018 00:00:00
Rapid JewelPark View DevelopersCts No 31231-03-2019 00:00:00
NandviharBhagwati Developers263 Plot No 931-12-2018 00:00:00
Neelkanth Co.Op.Soc.Swapnil Mohan KalyankarGut No.13525-12-2022 00:00:00
Shivam Complex Phase - 1Manoj Ramanand PrajapatiSurvey Number - 112/130-12-2020 00:00:00
Aarti PrideRamesh Bandu Retarekar4515 451624-12-2018 00:00:00
Balaji OrchidsBalaji Homes177/3/130-12-2021 00:00:00
Rivera EstatesOmega ConstructionsC.T.S No 1452 Survey No 8/131-12-2018 00:00:00
Shree Sadguru Complex - Phase IvEarth Home410220, Raigarh, Washivali31-03-2018 00:00:00
Sukhkarta 1Image BuildersPlot No 1 Survey No 57/3B31-12-2018 00:00:00
Link Infra PropertiesLink Infra Properties410210, Raigarh31-07-2019 00:00:00
Shree Sadguru Complex - Phase IiiEarth Home410220, Raigarh, Washivali31-03-2018 00:00:00
Sukhkarta 2Image BuildersPlot No 3 Survey No 57/3B31-12-2018 00:00:00
Dream Home EnterprisesDream Home Enterprises410202, Raigarh31-12-2021 00:00:00
KashihomesKashi Homes Pvt LtdRaigarh, 41020301-07-2025 00:00:00
Yashoda ShrushtiJitesh Natwarlal ThakkarCts No 4886/1 And 4886/227-08-2019 00:00:00
Gagangiri Vihar ComplexCrescent Infrastructure & Developing Company4275, 7292, 4293/231-12-2019 00:00:00
Jai GaneshAtharv Construction And DevelopersPlot No 8 Out Of Survey No 29 Hissa No. 1B Cts No 555621-07-2022 00:00:00
Gouri VaradvinayakShankar Sadu MhatrePlot No 631-10-2018 00:00:00
V M Heritage 2Dilawar Sujatkhan PathanCts 1048 Survey42/431-07-2019 00:00:00
NadmohanBhagwati DevelopersCts 1079 Out Of It Plot No0 131-12-2018 00:00:00
Town CentreFannan Builders And DevelopersKhopoli15-09-2021 00:00:00
Express City /Khopoli Woods/New Lonavala - Ph 2Xrbia Developers Ltd91/1, 91/2, 91/3, 91/5, 91/6, 91/7A/1, 91/830-03-2023 00:00:00
Madhav GangaDolphin DevelopersPlot No - 4,512-12-2022 00:00:00
Magic Hill EnclaveGarnet Construction Ltd.17/2, 17/3 Part , 17/4, 17/5, 17/6, 17/8, 17/930-12-2022 00:00:00
Malav VallenciaMalav Promoters & Developers1147 1145 114830-06-2018 00:00:00
BellavueBhakti DevelopersSurvey No 252A 252B Cts No 4290 429130-12-2025 00:00:00
Varadvinayak AasthaJ P VentureCts No 1678/2 S No 33A H No 4C30-04-2022 00:00:00
Royal PlazaRoyal EnterpriseCts 2116 S No 27 A529-12-2018 00:00:00
Vrindavan Flora-Rasayani Garden-Phase IThalia Labha Home Private LimitedGat No.-15/1630-12-2021 00:00:00
White House Life StyleWhite House Resorts Limited410201, Raigarh30-11-2020 00:00:00
PyramidMounthill Realty Pvt LtdSurvey No 25, Hissa No 730-12-2024 00:00:00
Bay View Residency Phase 3 Bldg 4Jm Developers26 2A 262B 262C 28 3030-12-2023 00:00:00
Krishna Valley- Phase 1Prishti Venture Private LimitedPlot No 20/29 ,271930-12-2020 00:00:00
Choice Ambe SmrutiChoice Buildcon LlpSr No 22/2, 2 24-131-12-2019 00:00:00
Omkar PrideChintamani Developers410203, Raigarh31-12-2022 00:00:00
Smart HeightsMubin Mohammed Iqbal JumaniCts 569530-06-2018 00:00:00
Swayambhu Shri Siddhivinayak ResidencyDream Homes RealtorsRaigarh31-01-2019 00:00:00
Park TownParktown Housing Developers LlpRaigarh, 41022228-08-2023 00:00:00
Garib Nawaz ManzilMujaffar Patel410203, Raigarh01-07-2021 00:00:00
Westened MeadowsWave Buildcon Private LimitedRaigarh, 41020231-12-2022 00:00:00
Nathsagar ResidensySopan Radhakisan Andhale166031-12-2018 00:00:00
Ramji ResidencyVitthal Ramji More33/531-03-2019 00:00:00
Bay View Residency Phase 2 Bldg 3Jm Developers26 2A 262B 26 2C 28 3030-12-2021 00:00:00
Deccan ResidencyPraveen Premkumar Nair23/1 Survey No 219631-03-2019 00:00:00
Logde ApartmentDeependra Singh Surendra Singh BhadoriaS No 5A 2/0 5A/1A1/2B/2 Cts No 5985,370209-02-2024 00:00:00
Madhav AshirwadDolphin DevelopersS No 52 H No 3A Cts No 406312-01-2021 00:00:00
Chishti ApartmentDolphin DevelopersS. No 21/5D Cts No 492731-12-2019 00:00:00
Raviraj Garden Phase IRaju WhabiSurvey No 39/112-01-2020 00:00:00
Bajaj SahilBajaj Habitat Private Limited410206, Raigarh31-12-2022 00:00:00
Express City/Khopoli Woods/New Lonavala-Ph-1Xrbia Developers LtdSurvey No 91/1 , 91/2 , 91/3, 91/5, 91/6, 91/7A/1, 91/830-03-2023 00:00:00
Dattatray ChsNivrutti Ramrao PanchalSurvey No 25 Hissa No 2B, Cts No 126830-09-2018 00:00:00
Express City/Khopoli Woods/New Lonavala-Ph-3Xrbia Developers LtdSurvey No 91/1 , 91/2, 91/3, 91/5, 91/6, 91/7A/1, 91/831-12-2019 00:00:00
Ashiyana Village Phase 3Ajaz Yusuf Khot3489 3490 3493 3494 3495 S No 1/1 2/230-12-2025 00:00:00
Express City/Khopoli Woods/New Lonavala - Ph -4Xrbia Developers LtdSurvey No 91/1, 91/2, 91/3, 91/5, 91/6, 91/7A/1, 91/830-03-2023 00:00:00
Laxmichhaya ResidencyThe CraftsmanCts No - 876, S. No.- 21, Plot No.- 0305-12-2018 00:00:00
Riddhi ApartmentM/S. Shree Siddhivinayak Corporation175B430-09-2020 00:00:00
Leena HeritageLeena Developers & InfrastructuresSurvey No 55 Hissa No 3B City Survey No 1655130-03-2022 00:00:00
Project Details
  • Project:
    Shivam Complex Phase - 1
  • Location:
  • Survey Number - 112/1
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2020
Developer Details

  • Developer:
    Manoj Ramanand Prajapati
  • Phone:
  • Address:
  • Prajapati Cascade
Project RERA Details
MAHA REARA No: P52000015165
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Shiv Kumar Chauhan
Funding Bank INDUSIND BANK
Proposed Possession 30 Dec 2020
Revised Possession 30 Dec 2020
Extended Possession 30 Jun 2023
Litigations No Litigations
Last Modified 21 Oct 2022
Last Retrived 28 Jul 2025
Shivam Complex Phase - 1 QR Code
Shivam Complex Phase - 1
MahaRERA - P52000015165
Apartment Details & Configuration
TypeArea
1 BHK28.48 Sq.mts. ( 307 Sq.ft. )
1 BHK29.21 Sq.mts. ( 314 Sq.ft. )
1 BHK29.49 Sq.mts. ( 317 Sq.ft. )
1 BHK29.59 Sq.mts. ( 319 Sq.ft. )
1 BHK29.82 Sq.mts. ( 321 Sq.ft. )
1 BHK30.09 Sq.mts. ( 324 Sq.ft. )
1 BHK30.17 Sq.mts. ( 325 Sq.ft. )
1 BHK30.21 Sq.mts. ( 325 Sq.ft. )
1 BHK30.47 Sq.mts. ( 328 Sq.ft. )
1 BHK30.71 Sq.mts. ( 331 Sq.ft. )
1 BHK30.77 Sq.mts. ( 331 Sq.ft. )
1 BHK30.81 Sq.mts. ( 332 Sq.ft. )
1 BHK30.94 Sq.mts. ( 333 Sq.ft. )
1 BHK31.34 Sq.mts. ( 337 Sq.ft. )
1 BHK31.54 Sq.mts. ( 339 Sq.ft. )
1 BHK32.3 Sq.mts. ( 348 Sq.ft. )
1 BHK32.37 Sq.mts. ( 348 Sq.ft. )
1 BHK32.57 Sq.mts. ( 351 Sq.ft. )
1 BHK32.66 Sq.mts. ( 352 Sq.ft. )
1 BHK33.01 Sq.mts. ( 355 Sq.ft. )
1 BHK33.16 Sq.mts. ( 357 Sq.ft. )
1 BHK33.17 Sq.mts. ( 357 Sq.ft. )
1 BHK33.38 Sq.mts. ( 359 Sq.ft. )
1 BHK34.19 Sq.mts. ( 368 Sq.ft. )
1 BHK34.28 Sq.mts. ( 369 Sq.ft. )
1 BHK34.41 Sq.mts. ( 370 Sq.ft. )
1 BHK34.5 Sq.mts. ( 371 Sq.ft. )
1 BHK27.31 Sq.mts. ( 294 Sq.ft. )
1 BHK27.98 Sq.mts. ( 301 Sq.ft. )
1 BHK28.2 Sq.mts. ( 304 Sq.ft. )
1 BHK28.22 Sq.mts. ( 304 Sq.ft. )
1 BHK28.27 Sq.mts. ( 304 Sq.ft. )
1 BHK28.86 Sq.mts. ( 311 Sq.ft. )
1 BHK30.39 Sq.mts. ( 327 Sq.ft. )
1 BHK30.66 Sq.mts. ( 330 Sq.ft. )
1 BHK31.05 Sq.mts. ( 334 Sq.ft. )
1 BHK31.41 Sq.mts. ( 338 Sq.ft. )
1 BHK32.51 Sq.mts. ( 350 Sq.ft. )
1 BHK32.6 Sq.mts. ( 351 Sq.ft. )
1 BHK32.62 Sq.mts. ( 351 Sq.ft. )
1 BHK32.71 Sq.mts. ( 352 Sq.ft. )
2 BHK40.2 Sq.mts. ( 433 Sq.ft. )
2 BHK41.01 Sq.mts. ( 441 Sq.ft. )
2 BHK41.17 Sq.mts. ( 443 Sq.ft. )
2 BHK41.41 Sq.mts. ( 446 Sq.ft. )
2 BHK42.93 Sq.mts. ( 462 Sq.ft. )
2 BHK43.28 Sq.mts. ( 466 Sq.ft. )
2 BHK43.34 Sq.mts. ( 467 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shivam Complex Phase - 1last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space50% completed
50% Complete
To Be Provided By Promoter
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
To Be Provided By Promoter
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting100% completed
95% Complete
To Be Provided By Promoter
Open Parking50% completed
50% Complete
To Be Provided By Promoter
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
To Be Provided By Promoter
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
To Be Provided By Promoter
Water Supply100% completed
95% Complete
To Be Provided By Promoter
Buildings / Wings in Shivam Complex Phase - 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shivam Complex Phase - 1 by Manoj Ramanand Prajapatilast updated on 28 Jul 2025 as per information obtained from MARA RERA.

39571 Sq. ft.

Project Area

4881 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

104 apartments in total
Total
104
Booked
85
Available
19

Saleable Area Statistics (Sq. ft.)

36708 Total
Total
36708
Booked
30437
Available
6271
Total 104 apartments in project. 85 apartments booked. 81% apartments booked.
Total 36708 Sq.ft. saleable area. 30437 saleable area booked.
83% area booked.

Building Number - 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building Number - 1Jun 20205101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.48 Sq.mts. ( 307 Sq.ft. )4
2 Booked50% Booked
50% Booked
1 BHK29.21 Sq.mts. ( 314 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK29.49 Sq.mts. ( 317 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK29.59 Sq.mts. ( 319 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK29.82 Sq.mts. ( 321 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK30.09 Sq.mts. ( 324 Sq.ft. )4
3 Booked75% Booked
75% Booked
1 BHK30.17 Sq.mts. ( 325 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK30.21 Sq.mts. ( 325 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK30.47 Sq.mts. ( 328 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK30.71 Sq.mts. ( 331 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK30.77 Sq.mts. ( 331 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK30.81 Sq.mts. ( 332 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK30.94 Sq.mts. ( 333 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK31.34 Sq.mts. ( 337 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK31.54 Sq.mts. ( 339 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK32.3 Sq.mts. ( 348 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK32.37 Sq.mts. ( 348 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK32.57 Sq.mts. ( 351 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK32.66 Sq.mts. ( 352 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK33.01 Sq.mts. ( 355 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK33.16 Sq.mts. ( 357 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK33.17 Sq.mts. ( 357 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK33.38 Sq.mts. ( 359 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK34.19 Sq.mts. ( 368 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK34.28 Sq.mts. ( 369 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK34.41 Sq.mts. ( 370 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK34.5 Sq.mts. ( 371 Sq.ft. )2
2 Booked100% Booked
100% Booked
60 total apartments / 49 apartments booked. 81% apartments booked.
Work Description in Building Building Number - 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building Number - 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building Number - 2Jun 20205101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.31 Sq.mts. ( 294 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK27.98 Sq.mts. ( 301 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK28.2 Sq.mts. ( 304 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK28.22 Sq.mts. ( 304 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK28.27 Sq.mts. ( 304 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK28.86 Sq.mts. ( 311 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK30.39 Sq.mts. ( 327 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK30.66 Sq.mts. ( 330 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK31.05 Sq.mts. ( 334 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK31.41 Sq.mts. ( 338 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK32.51 Sq.mts. ( 350 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK32.6 Sq.mts. ( 351 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK32.62 Sq.mts. ( 351 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK32.71 Sq.mts. ( 352 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK40.2 Sq.mts. ( 433 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK41.01 Sq.mts. ( 441 Sq.ft. )2
1 Booked50% Booked
50% Booked
2 BHK41.17 Sq.mts. ( 443 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK41.41 Sq.mts. ( 446 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK42.93 Sq.mts. ( 462 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK43.28 Sq.mts. ( 466 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK43.34 Sq.mts. ( 467 Sq.ft. )2
2 Booked100% Booked
100% Booked
44 total apartments / 36 apartments booked. 81% apartments booked.
Work Description in Building Building Number - 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Manoj Ramanand Prajapati
for Project
Shivam Complex Phase - 1
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation