Project overview

Shivaalik Park is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700023966. Shivaalik Park is located at S.No 7417718016U8016. This is a New being developed by Sun Realtors.

Shivaalik Park has 1 BHK Apartments with carpet areas ranging from 322 to 322 Sq.ft. Carpet. The Project has total 806 of which 150 are currently available for sale.

Shivaalik Park is being developed on a total land area of 138748 Sq.ft. out of which 34693 Sq.ft. i.e 25% is reserved for recreational purposes. Shivaalik Park has 14 Wings / Towers Shivaalik Park Bldg 1,Shivaalik Park Bldg 10,Shivaalik Park Bldg 11,Shivaalik Park Bldg 12,Shivaalik Park Bldg 13,Shivaalik Park Bldg 14,Shivaalik Park Bldg 2,Shivaalik Park Bldg 3,Shivaalik Park Bldg 4,Shivaalik Park Bldg 5,Shivaalik Park Bldg 6,Shivaalik Park Bldg 7,Shivaalik Park Bldg 8,Shivaalik Park Bldg 9

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Shivaalik Park
  • Location:
  • S.No 7417718016U8016
  • Const. Stage:
    New
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Sun Realtors
  • Phone:
  • Address:
  • Village Bhadwad
Project RERA Details
MAHA REARA No: P51700023966
Project Type Residential / Group Housing
RERA Project Status New
Architect Shamim Ahmed Khan
Funding Bank AXIS BANK
Proposed Possession 30 Dec 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 14 Jul 2025
Last Retrived 26 Jul 2025
Shivaalik Park QR Code
Shivaalik Park
MahaRERA - P51700023966
Apartment Details & Configuration
TypeArea
1 BHK29.91 Sq.mts. ( 322 Sq.ft. )
1 BHK30 Sq.mts. ( 323 Sq.ft. )
1 BHK33.9 Sq.mts. ( 365 Sq.ft. )
1 BHK33.91 Sq.mts. ( 365 Sq.ft. )
2 BHK34.82 Sq.mts. ( 375 Sq.ft. )
2 BHK34.84 Sq.mts. ( 375 Sq.ft. )
Shop16.3 Sq.mts. ( 175 Sq.ft. )
Shop17.55 Sq.mts. ( 189 Sq.ft. )
Shop19.11 Sq.mts. ( 206 Sq.ft. )
Shop16.26 Sq.mts. ( 175 Sq.ft. )
Shop17.56 Sq.mts. ( 189 Sq.ft. )
Shop19.14 Sq.mts. ( 206 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shivaalik Parklast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Work Not Started Yet
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station20% completed
20% Complete
Work Not Started Yet
Energy management30% completed
30% Complete
Wip
Fire Protection And Fire Safety Requirements10% completed
10% Complete
Work Not Started Yet
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)40% completed
40% Complete
Wip
Solid Waste Management And Disposal
Na
Storm Water Drains25% completed
25% Complete
Wip
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting15% completed
15% Complete
Wip
Water Supply20% completed
20% Complete
By Bncmc
Buildings / Wings in Shivaalik Park
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shivaalik Park by Sun Realtorslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

138748 Sq. ft.

Project Area

34693 Sq. ft.

Recreational Open Space

Total 14

Wings / Towers in Project

Apartments Statistics

806 apartments in total
Total
806
Booked
656
Available
150

Saleable Area Statistics (Sq. ft.)

275669 Total
Total
275669
Booked
222388
Available
53281
Total 806 apartments in project. 656 apartments booked. 81% apartments booked.
Total 275669 Sq.ft. saleable area. 222388 saleable area booked.
81% area booked.

Shivaalik Park Bldg 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shivaalik Park Bldg 1Dec 20225100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.91 Sq.mts. ( 322 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK30 Sq.mts. ( 323 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK33.9 Sq.mts. ( 365 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK33.91 Sq.mts. ( 365 Sq.ft. )13
7 Booked53% Booked
53% Booked
2 BHK34.82 Sq.mts. ( 375 Sq.ft. )3
1 Booked33% Booked
33% Booked
2 BHK34.84 Sq.mts. ( 375 Sq.ft. )16
Shop16.3 Sq.mts. ( 175 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop17.55 Sq.mts. ( 189 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop19.11 Sq.mts. ( 206 Sq.ft. )1
None Booked0% Booked
0% Booked
42 total apartments / 12 apartments booked. 28% apartments booked.
Work Description in Building Shivaalik Park Bldg 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress85% done
85% Booked
Stilt Floor

Shivaalik Park Bldg 10

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shivaalik Park Bldg 10Dec 20225100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.91 Sq.mts. ( 365 Sq.ft. )20
9 Booked45% Booked
45% Booked
2 BHK34.84 Sq.mts. ( 375 Sq.ft. )20
9 Booked45% Booked
45% Booked
40 total apartments / 18 apartments booked. 45% apartments booked.
Work Description in Building Shivaalik Park Bldg 10Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress85% done
85% Booked
Stilt Floor

Shivaalik Park Bldg 11

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shivaalik Park Bldg 11Dec 20225100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.91 Sq.mts. ( 322 Sq.ft. )60
58 Booked96% Booked
96% Booked
60 total apartments / 58 apartments booked. 96% apartments booked.
Work Description in Building Shivaalik Park Bldg 11Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress85% done
85% Booked
Stilt Floor

Shivaalik Park Bldg 12

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shivaalik Park Bldg 12Dec 20225100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.91 Sq.mts. ( 322 Sq.ft. )60
59 Booked98% Booked
98% Booked
60 total apartments / 59 apartments booked. 98% apartments booked.
Work Description in Building Shivaalik Park Bldg 12Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress85% done
85% Booked
Stilt Floor

Shivaalik Park Bldg 13

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shivaalik Park Bldg 13Dec 20225100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.91 Sq.mts. ( 322 Sq.ft. )60
60 Booked100% Booked
100% Booked
60 total apartments / 60 apartments booked. 100% apartments booked.
Work Description in Building Shivaalik Park Bldg 13Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress85% done
85% Booked
Stilt Floor

Shivaalik Park Bldg 14

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shivaalik Park Bldg 14Dec 20225100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.91 Sq.mts. ( 322 Sq.ft. )60
60 Booked100% Booked
100% Booked
60 total apartments / 60 apartments booked. 100% apartments booked.
Work Description in Building Shivaalik Park Bldg 14Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress85% done
85% Booked
Stilt Floor

Shivaalik Park Bldg 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shivaalik Park Bldg 2Dec 20225100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.91 Sq.mts. ( 365 Sq.ft. )30
8 Booked26% Booked
26% Booked
2 BHK34.84 Sq.mts. ( 375 Sq.ft. )30
7 Booked23% Booked
23% Booked
60 total apartments / 15 apartments booked. 25% apartments booked.
Work Description in Building Shivaalik Park Bldg 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress85% done
85% Booked
Stilt Floor

Shivaalik Park Bldg 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shivaalik Park Bldg 3Dec 20225100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.91 Sq.mts. ( 365 Sq.ft. )29
28 Booked96% Booked
96% Booked
2 BHK34.84 Sq.mts. ( 375 Sq.ft. )29
28 Booked96% Booked
96% Booked
Shop16.26 Sq.mts. ( 175 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop17.56 Sq.mts. ( 189 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop19.14 Sq.mts. ( 206 Sq.ft. )1
None Booked0% Booked
0% Booked
62 total apartments / 56 apartments booked. 90% apartments booked.
Work Description in Building Shivaalik Park Bldg 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor

Shivaalik Park Bldg 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shivaalik Park Bldg 4Dec 20225100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.91 Sq.mts. ( 365 Sq.ft. )30
23 Booked76% Booked
76% Booked
2 BHK34.84 Sq.mts. ( 375 Sq.ft. )30
26 Booked86% Booked
86% Booked
60 total apartments / 49 apartments booked. 81% apartments booked.
Work Description in Building Shivaalik Park Bldg 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress85% done
85% Booked
Stilt Floor

Shivaalik Park Bldg 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shivaalik Park Bldg 5Dec 20225100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.91 Sq.mts. ( 365 Sq.ft. )29
22 Booked75% Booked
75% Booked
2 BHK34.84 Sq.mts. ( 375 Sq.ft. )29
25 Booked86% Booked
86% Booked
Shop16.26 Sq.mts. ( 175 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop17.56 Sq.mts. ( 189 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop19.14 Sq.mts. ( 206 Sq.ft. )1
None Booked0% Booked
0% Booked
62 total apartments / 49 apartments booked. 79% apartments booked.
Work Description in Building Shivaalik Park Bldg 5Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress70% done
70% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress85% done
85% Booked
Stilt Floor

Shivaalik Park Bldg 6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shivaalik Park Bldg 6Dec 20225100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.91 Sq.mts. ( 365 Sq.ft. )30
18 Booked60% Booked
60% Booked
2 BHK34.84 Sq.mts. ( 375 Sq.ft. )30
23 Booked76% Booked
76% Booked
60 total apartments / 41 apartments booked. 68% apartments booked.
Work Description in Building Shivaalik Park Bldg 6Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress85% done
85% Booked
Stilt Floor

Shivaalik Park Bldg 7

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shivaalik Park Bldg 7Dec 20225100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.91 Sq.mts. ( 322 Sq.ft. )60
60 Booked100% Booked
100% Booked
60 total apartments / 60 apartments booked. 100% apartments booked.
Work Description in Building Shivaalik Park Bldg 7Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress85% done
85% Booked
Stilt Floor

Shivaalik Park Bldg 8

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shivaalik Park Bldg 8Dec 20225100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.91 Sq.mts. ( 322 Sq.ft. )60
59 Booked98% Booked
98% Booked
60 total apartments / 59 apartments booked. 98% apartments booked.
Work Description in Building Shivaalik Park Bldg 8Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress85% done
85% Booked
Stilt Floor

Shivaalik Park Bldg 9

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shivaalik Park Bldg 9Dec 20225100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.91 Sq.mts. ( 322 Sq.ft. )60
60 Booked100% Booked
100% Booked
60 total apartments / 60 apartments booked. 100% apartments booked.
Work Description in Building Shivaalik Park Bldg 9Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress85% done
85% Booked
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
Sun Realtors
for Project
Shivaalik Park
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation