Project overview

Shiv Shahi Complex Phase Ii is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700017015. Shiv Shahi Complex Phase Ii is located at 234/4/1 And 237. This is a New being developed by Shalini Shivaji Pawar.

Shiv Shahi Complex Phase Ii has 1 BHK & 2 BHK Apartments with carpet areas ranging from 365 to 505 Sq.ft. Carpet. The Project has total 144 of which 144 are currently available for sale.

Shiv Shahi Complex Phase Ii is being developed on a total land area of 57372 Sq.ft. out of which 10034 Sq.ft. i.e 17% is reserved for recreational purposes. Shiv Shahi Complex Phase Ii has 2 Wings / Towers Building A,Building B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Shiv Shahi Complex Phase Ii
  • Location:
  • 234/4/1 And 237
  • Const. Stage:
    New
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    Shalini Shivaji Pawar
  • Phone:
  • Address:
  • Gurukripa Building
Project RERA Details
MAHA REARA No: P51700017015
Project Type Residential / Group Housing
RERA Project Status New
Architect Shailaja Vaidya
Funding Bank
Proposed Possession 30 Dec 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 11 Apr 2025
Last Retrived 26 Jul 2025
Shiv Shahi Complex Phase Ii QR Code
Shiv Shahi Complex Phase Ii
MahaRERA - P51700017015
Apartment Details & Configuration
TypeArea
1 BHK33.94 Sq.mts. ( 365 Sq.ft. )
1 BHK33.95 Sq.mts. ( 365 Sq.ft. )
1 BHK34.65 Sq.mts. ( 373 Sq.ft. )
1 BHK34.83 Sq.mts. ( 375 Sq.ft. )
2 BHK46.87 Sq.mts. ( 505 Sq.ft. )
1 BHK34.12 Sq.mts. ( 367 Sq.ft. )
1 BHK34.66 Sq.mts. ( 373 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shiv Shahi Complex Phase Iilast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Work Yet Not Started
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Work Yet Not Started
Energy management
Work Yet Not Started
Fire Protection And Fire Safety Requirements
Work Yet Not Started
Landscaping & Tree Planting
Work Yet Not Started
Open Parking
Work Yet Not Started
Sewerage (Chamber, Lines, Septic Tank , STP)
Work Yet Not Started
Solid Waste Management And Disposal
Work Yet Not Started
Storm Water Drains
Work Yet Not Started
Street Lighting
Work Yet Not Started
Treatment And Disposal Of Sewage And Sullage Water
Work Yet Not Started
Water Conservation, Rain water Harvesting
Work Yet Not Started
Water Supply
Work Yet Not Started
Buildings / Wings in Shiv Shahi Complex Phase Ii
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shiv Shahi Complex Phase Ii by Shalini Shivaji Pawarlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

57372 Sq. ft.

Project Area

10034 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

144 apartments in total
Total
144
Booked
0
Available
144

Saleable Area Statistics (Sq. ft.)

55283 Total
Total
55283
Booked
0
Available
55283
Total 144 apartments in project. 0 apartments booked. 0% apartments booked.
Total 55283 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Building A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building ADec 20219101012361
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.94 Sq.mts. ( 365 Sq.ft. )24
None Booked0% Booked
0% Booked
1 BHK33.95 Sq.mts. ( 365 Sq.ft. )16
None Booked0% Booked
0% Booked
1 BHK34.65 Sq.mts. ( 373 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK34.83 Sq.mts. ( 375 Sq.ft. )16
None Booked0% Booked
0% Booked
2 BHK46.87 Sq.mts. ( 505 Sq.ft. )8
None Booked0% Booked
0% Booked
72 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building ACompletion
Basement (if any)
Excavation
work-in-progress50% done
50% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building BDec 20219101012262
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.94 Sq.mts. ( 365 Sq.ft. )16
None Booked0% Booked
0% Booked
1 BHK33.95 Sq.mts. ( 365 Sq.ft. )16
None Booked0% Booked
0% Booked
1 BHK34.12 Sq.mts. ( 367 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK34.66 Sq.mts. ( 373 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK34.83 Sq.mts. ( 375 Sq.ft. )16
None Booked0% Booked
0% Booked
2 BHK46.87 Sq.mts. ( 505 Sq.ft. )8
None Booked0% Booked
0% Booked
72 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building BCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Shalini Shivaji Pawar
for Project
Shiv Shahi Complex Phase Ii
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation