Project overview

Shiv Sai Complex is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000015737. Shiv Sai Complex is located at Survey No 07 Hissa No 7B. This is a New being developed by Shiv Sai Developers.

Shiv Sai Complex has RESIDENTIALLANDOWNER Apartments with carpet areas ranging from 296 to 708 Sq.ft. Carpet. The Project has total 130 of which 129 are currently available for sale.

Shiv Sai Complex is being developed on a total land area of 49514 Sq.ft. out of which 4951 Sq.ft. i.e 10% is reserved for recreational purposes. Shiv Sai Complex has 7 Wings / Towers Building No 1-B Wing,Building No 2 - C Wing,Building No 2 - D Wing,Building No 2 - E Wing,Building No 3 - F Wing,Building No 3 - G Wing,Building No 4 - H Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Shiv Sai Complex
  • Location:
  • Survey No 07 Hissa No 7B
  • Const. Stage:
    New
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Shiv Sai Developers
  • Phone:
  • Address:
  • Agarwal Trade Centre
Project RERA Details
MAHA REARA No: P52000015737
Project Type Others
RERA Project Status New
Architect P K Madhav
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 21 Apr 2025
Last Retrived 28 Jul 2025
Shiv Sai Complex QR Code
Shiv Sai Complex
MahaRERA - P52000015737
Apartment Details & Configuration
TypeArea
RESIDENTIALLANDOWNER20.27 Sq.mts. ( 218 Sq.ft. )
RESIDENTIALlandowner20.7 Sq.mts. ( 223 Sq.ft. )
RESIDENTIALLANDOWNER29.49 Sq.mts. ( 317 Sq.ft. )
RESIDENTIALLANDOWNER30.12 Sq.mts. ( 324 Sq.ft. )
SHOP Landowner7.9 Sq.mts. ( 85 Sq.ft. )
SHOP LANDOWNER11.13 Sq.mts. ( 120 Sq.ft. )
SHOP LANDOWNER15.53 Sq.mts. ( 167 Sq.ft. )
RESIDENTIAL22.03 Sq.mts. ( 237 Sq.ft. )
RESIDENTIAL22.54 Sq.mts. ( 243 Sq.ft. )
RESIDENTIAL28.47 Sq.mts. ( 306 Sq.ft. )
RESIDENTIAL29.06 Sq.mts. ( 313 Sq.ft. )
SHOP6.88 Sq.mts. ( 74 Sq.ft. )
SHOP10.25 Sq.mts. ( 110 Sq.ft. )
SHOP11.27 Sq.mts. ( 121 Sq.ft. )
SHOP11.55 Sq.mts. ( 124 Sq.ft. )
SHOP14.43 Sq.mts. ( 155 Sq.ft. )
RESIDENTIAL22.47 Sq.mts. ( 242 Sq.ft. )
RESIDENTIAL22.7 Sq.mts. ( 244 Sq.ft. )
RESIDENTIAL22.97 Sq.mts. ( 247 Sq.ft. )
RESIDENTIAL27.7 Sq.mts. ( 298 Sq.ft. )
RESIDENTIAL28.25 Sq.mts. ( 304 Sq.ft. )
RESIDENTIAL29.61 Sq.mts. ( 319 Sq.ft. )
RESIDENTIAL30.16 Sq.mts. ( 325 Sq.ft. )
RESIDENTIAL35.32 Sq.mts. ( 380 Sq.ft. )
RESIDENTIAL35.88 Sq.mts. ( 386 Sq.ft. )
SHOP29.27 Sq.mts. ( 315 Sq.ft. )
SHOP9.67 Sq.mts. ( 104 Sq.ft. )
SHOP9.9 Sq.mts. ( 107 Sq.ft. )
SHOP12.14 Sq.mts. ( 131 Sq.ft. )
SHOP12.43 Sq.mts. ( 134 Sq.ft. )
SHOP12.99 Sq.mts. ( 140 Sq.ft. )
SHOP14.99 Sq.mts. ( 161 Sq.ft. )
RESIDENTIAL28.24 Sq.mts. ( 304 Sq.ft. )
RESIDENTIAL35.34 Sq.mts. ( 380 Sq.ft. )
SHOP19.57 Sq.mts. ( 211 Sq.ft. )
SHOP19.79 Sq.mts. ( 213 Sq.ft. )
SHOP22.31 Sq.mts. ( 240 Sq.ft. )
RESIDENTIALLANDOWNER27.52 Sq.mts. ( 296 Sq.ft. )
RESIDENTIALLANDOWNER28.59 Sq.mts. ( 308 Sq.ft. )
RESIDENTIALLANDOWNER31.62 Sq.mts. ( 340 Sq.ft. )
RESIDENTIALLANDOWNER63.61 Sq.mts. ( 685 Sq.ft. )
RESIDENTIALLANDOWNER65.77 Sq.mts. ( 708 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shiv Sai Complexlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
0
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
0
Open Parking
0
Sewerage (Chamber, Lines, Septic Tank , STP)
0
Solid Waste Management And Disposal
Na
Storm Water Drains
Gram Panchayat Storm Water Drtains
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
0
Water Supply
Grampanchayat Water Supply
Buildings / Wings in Shiv Sai Complex
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shiv Sai Complex by Shiv Sai Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

49514 Sq. ft.

Project Area

4951 Sq. ft.

Recreational Open Space

Total 7

Wings / Towers in Project

Apartments Statistics

130 apartments in total
Total
130
Booked
1
Available
129

Saleable Area Statistics (Sq. ft.)

33085 Total
Total
33085
Booked
380
Available
32704
Total 130 apartments in project. 1 apartments booked. 0% apartments booked.
Total 33085 Sq.ft. saleable area. 380 saleable area booked.
1% area booked.

Building No 1-B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 1-B WingDec 202251010201
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIALLANDOWNER20.27 Sq.mts. ( 218 Sq.ft. )2
None Booked0% Booked
0% Booked
RESIDENTIALlandowner20.7 Sq.mts. ( 223 Sq.ft. )2
None Booked0% Booked
0% Booked
RESIDENTIALLANDOWNER29.49 Sq.mts. ( 317 Sq.ft. )3
None Booked0% Booked
0% Booked
RESIDENTIALLANDOWNER30.12 Sq.mts. ( 324 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP Landowner7.9 Sq.mts. ( 85 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP LANDOWNER11.13 Sq.mts. ( 120 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP LANDOWNER15.53 Sq.mts. ( 167 Sq.ft. )1
None Booked0% Booked
0% Booked
11 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 1-B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 2 - C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2 - C WingDec 202251020201
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL20.27 Sq.mts. ( 218 Sq.ft. )4
None Booked0% Booked
0% Booked
RESIDENTIAL20.7 Sq.mts. ( 223 Sq.ft. )4
None Booked0% Booked
0% Booked
RESIDENTIAL22.03 Sq.mts. ( 237 Sq.ft. )3
None Booked0% Booked
0% Booked
RESIDENTIAL22.54 Sq.mts. ( 243 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL28.47 Sq.mts. ( 306 Sq.ft. )3
None Booked0% Booked
0% Booked
RESIDENTIAL29.06 Sq.mts. ( 313 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP6.88 Sq.mts. ( 74 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP10.25 Sq.mts. ( 110 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP11.27 Sq.mts. ( 121 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP11.55 Sq.mts. ( 124 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP14.43 Sq.mts. ( 155 Sq.ft. )2
None Booked0% Booked
0% Booked
23 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 2 - C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress75% done
75% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 2 - D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2 - D WingDec 202251010201
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL20.27 Sq.mts. ( 218 Sq.ft. )5
None Booked0% Booked
0% Booked
RESIDENTIAL20.7 Sq.mts. ( 223 Sq.ft. )4
None Booked0% Booked
0% Booked
RESIDENTIAL22.03 Sq.mts. ( 237 Sq.ft. )2
None Booked0% Booked
0% Booked
RESIDENTIAL22.54 Sq.mts. ( 243 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL28.47 Sq.mts. ( 306 Sq.ft. )3
None Booked0% Booked
0% Booked
RESIDENTIAL29.06 Sq.mts. ( 313 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP6.88 Sq.mts. ( 74 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP11.27 Sq.mts. ( 121 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP11.55 Sq.mts. ( 124 Sq.ft. )2
None Booked0% Booked
0% Booked
20 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 2 - D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress75% done
75% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 2 - E Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2 - E WingDec 202051010201
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL20.27 Sq.mts. ( 218 Sq.ft. )2
None Booked0% Booked
0% Booked
RESIDENTIAL22.03 Sq.mts. ( 237 Sq.ft. )3
None Booked0% Booked
0% Booked
RESIDENTIAL22.47 Sq.mts. ( 242 Sq.ft. )4
None Booked0% Booked
0% Booked
RESIDENTIAL22.54 Sq.mts. ( 243 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL22.7 Sq.mts. ( 244 Sq.ft. )2
None Booked0% Booked
0% Booked
RESIDENTIAL22.97 Sq.mts. ( 247 Sq.ft. )2
None Booked0% Booked
0% Booked
RESIDENTIAL28.47 Sq.mts. ( 306 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL29.06 Sq.mts. ( 313 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP6.88 Sq.mts. ( 74 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP10.25 Sq.mts. ( 110 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP14.43 Sq.mts. ( 155 Sq.ft. )1
None Booked0% Booked
0% Booked
19 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 2 - E WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 3 - F Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 3 - F WingDec 202051030201
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL27.7 Sq.mts. ( 298 Sq.ft. )6
None Booked0% Booked
0% Booked
RESIDENTIAL28.25 Sq.mts. ( 304 Sq.ft. )2
None Booked0% Booked
0% Booked
RESIDENTIAL29.61 Sq.mts. ( 319 Sq.ft. )2
None Booked0% Booked
0% Booked
RESIDENTIAL30.16 Sq.mts. ( 325 Sq.ft. )2
None Booked0% Booked
0% Booked
RESIDENTIAL35.32 Sq.mts. ( 380 Sq.ft. )2
None Booked0% Booked
0% Booked
RESIDENTIAL35.88 Sq.mts. ( 386 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP29.27 Sq.mts. ( 315 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP9.67 Sq.mts. ( 104 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP9.9 Sq.mts. ( 107 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP12.14 Sq.mts. ( 131 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP12.43 Sq.mts. ( 134 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP12.99 Sq.mts. ( 140 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP14.99 Sq.mts. ( 161 Sq.ft. )1
None Booked0% Booked
0% Booked
24 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 3 - F WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress20% done
20% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress73% done
73% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 3 - G Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 3 - G WingDec 202251000201
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL27.7 Sq.mts. ( 298 Sq.ft. )8
None Booked0% Booked
0% Booked
RESIDENTIAL28.24 Sq.mts. ( 304 Sq.ft. )2
None Booked0% Booked
0% Booked
RESIDENTIAL28.25 Sq.mts. ( 304 Sq.ft. )2
None Booked0% Booked
0% Booked
RESIDENTIAL35.34 Sq.mts. ( 380 Sq.ft. )2
1 Booked50% Booked
50% Booked
RESIDENTIAL35.88 Sq.mts. ( 386 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP7.9 Sq.mts. ( 85 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP19.57 Sq.mts. ( 211 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP19.79 Sq.mts. ( 213 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP22.31 Sq.mts. ( 240 Sq.ft. )1
None Booked0% Booked
0% Booked
21 total apartments / 1 apartments booked. 4% apartments booked.
Work Description in Building Building No 3 - G WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress67% done
67% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress20% done
20% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress73% done
73% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 4 - H Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 4 - H WingDec 202251010201
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIALLANDOWNER27.52 Sq.mts. ( 296 Sq.ft. )4
None Booked0% Booked
0% Booked
RESIDENTIALLANDOWNER28.59 Sq.mts. ( 308 Sq.ft. )3
None Booked0% Booked
0% Booked
RESIDENTIALLANDOWNER31.62 Sq.mts. ( 340 Sq.ft. )3
None Booked0% Booked
0% Booked
RESIDENTIALLANDOWNER63.61 Sq.mts. ( 685 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIALLANDOWNER65.77 Sq.mts. ( 708 Sq.ft. )1
None Booked0% Booked
0% Booked
12 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 4 - H WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Shiv Sai Developers
for Project
Shiv Sai Complex
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation