Project overview

Shiv Parbat is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800045822. Shiv Parbat is located at 1732/11. This is a New being developed by V3 Partners.

Shiv Parbat has Office space & Shop Apartments with carpet areas ranging from 141 to 430 Sq.ft. Carpet. The Project has total 64 of which 62 are currently available for sale.

Shiv Parbat is being developed on a total land area of 12120 Sq.ft. out of which 1549 Sq.ft. i.e 13% is reserved for recreational purposes. Shiv Parbat has 2 Wings / Towers Shiv Parbat,Shiv Parbat Wing A

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Shiv Parbat
  • Location:
  • 1732/11
  • Const. Stage:
    New
  • Possession:
    15 Mar 2027
Developer Details

  • Developer:
    V3 Partners
  • Phone:
  • Address:
  • Siddhi Vinayak Tower Chsl
Project RERA Details
MAHA REARA No: P51800045822
Project Type Others
RERA Project Status New
Architect Pawar Ameet G
Funding Bank ICICI BANK LIMITED
Proposed Possession 15 Mar 2027
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 15 Jun 2022
Last Retrived 26 Jul 2025
Shiv Parbat QR Code
Shiv Parbat
MahaRERA - P51800045822
Apartment Details & Configuration
TypeArea
1 BHK36.56 Sq.mts. ( 394 Sq.ft. )
2 BHK44.12 Sq.mts. ( 475 Sq.ft. )
2 BHK46.71 Sq.mts. ( 503 Sq.ft. )
2 BHK47.6 Sq.mts. ( 512 Sq.ft. )
2 BHK47.93 Sq.mts. ( 516 Sq.ft. )
2 BHK51.51 Sq.mts. ( 554 Sq.ft. )
2 BHK53.87 Sq.mts. ( 580 Sq.ft. )
Office space39.92 Sq.mts. ( 430 Sq.ft. )
Office space177.92 Sq.mts. ( 1915 Sq.ft. )
Shop13.09 Sq.mts. ( 141 Sq.ft. )
Shop17.98 Sq.mts. ( 194 Sq.ft. )
Shop30.45 Sq.mts. ( 328 Sq.ft. )
Shop38.58 Sq.mts. ( 415 Sq.ft. )
Shop39.62 Sq.mts. ( 426 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shiv Parbatlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Drawing
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Drawing
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Drawing
Landscaping & Tree Planting
As Per Drawing
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Drawing
Solid Waste Management And Disposal
As Per Drawing
Storm Water Drains
As Per Drawing
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
As Per Drawing
Water Supply
As Per Drawing
Buildings / Wings in Shiv Parbat
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shiv Parbat by V3 Partnerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

12120 Sq. ft.

Project Area

1549 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

64 apartments in total
Total
64
Booked
2
Available
62

Saleable Area Statistics (Sq. ft.)

31466 Total
Total
31466
Booked
787
Available
30679
Total 64 apartments in project. 2 apartments booked. 3% apartments booked.
Total 31466 Sq.ft. saleable area. 787 saleable area booked.
3% area booked.

Shiv Parbat

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shiv ParbatMar 2027161020036
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.56 Sq.mts. ( 394 Sq.ft. )30
2 BHK44.12 Sq.mts. ( 475 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK46.71 Sq.mts. ( 503 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK47.6 Sq.mts. ( 512 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK47.93 Sq.mts. ( 516 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK51.51 Sq.mts. ( 554 Sq.ft. )7
None Booked0% Booked
0% Booked
2 BHK53.87 Sq.mts. ( 580 Sq.ft. )6
None Booked0% Booked
0% Booked
56 total apartments / 2 apartments booked. 3% apartments booked.
Work Description in Building Shiv ParbatCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress80% done
80% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress25% done
25% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress70% done
70% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress40% done
40% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Shiv Parbat Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shiv Parbat Wing AMar 20274100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Office space39.92 Sq.mts. ( 430 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space177.92 Sq.mts. ( 1915 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop13.09 Sq.mts. ( 141 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop17.98 Sq.mts. ( 194 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop30.45 Sq.mts. ( 328 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop38.58 Sq.mts. ( 415 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop39.62 Sq.mts. ( 426 Sq.ft. )1
None Booked0% Booked
0% Booked
8 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Shiv Parbat Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress80% done
80% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress25% done
25% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress70% done
70% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress40% done
40% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
V3 Partners
for Project
Shiv Parbat
last updated on 26 Jul 2025 as per information obtained from MARA RERA.