Project overview

Shiv Jivdani Sadan is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700021173. Shiv Jivdani Sadan is located at Survey No 29 Old S No 164 Hissa No 5. This is a New being developed by Shubham Builders & Developers.

Shiv Jivdani Sadan has 4 BHK Apartments with carpet areas ranging from 1858 to 1858 Sq.ft. Carpet. The Project has total 83 of which 21 are currently available for sale.

Shiv Jivdani Sadan is being developed on a total land area of 17438 Sq.ft. out of which 2616 Sq.ft. i.e 15% is reserved for recreational purposes. Shiv Jivdani Sadan has 2 Wings / Towers Building No 2, C Wing,Building No 3,E Wing

ProjectDeveloperLocationPossession
Deep Laxmi HeightDeeplaxmi HeightsBhiwandi30-12-2024 00:00:00
Lodha Bellavista - Wing B1Macrotech Developers LimitedGat No.61/1/1,2,3,4 30-12-2025 00:00:00
Fennelia CommercialAcme Housing India Private LimitedGat No 61/1/1,2,330-12-2025 00:00:00
Nasheman-E-ZohraM M Builders &Amp; Developers421302, Thane, Bhiwandi01-03-2026 00:00:00
Sun City Phase ISunrise DevelopersThane15-03-2026 00:00:00
Shree Ganesha EnterprisesShree Ganesha EnterprisesThane, Kopar30-12-2022 00:00:00
Sai Vaibhav ParadiseShree Sai DevelopersOld Survey No. 165, New Survey No. 26 Hissa No.330-06-2022 00:00:00
Salasar Exotica - ISalasar AssociatesSurvey No 7630-06-2025 00:00:00
Pushkar Co Op Hsg Society PraposedAmeya DevelopersCts No 823 824 S No 93A Plot No 88 8912-02-2024 00:00:00
Centrum Business Square Phase 1Squarefeet ConstructionD 130-06-2027 00:00:00
Shruti ApartmentVikrant V Raikar Huf - -Plot No 9 Sector 23 Ghansoli30-11-2023 00:00:00
Jasmine ResidencyA.A.Corp.Survey No 5/9 5/10 6/6A 6/724-11-2025 00:00:00
Sai Aashiyana - IiSai Sakshi DevelopersSurvey No 81 5 A 81 5 B30-06-2026 00:00:00
Aashray Aanand Phase-IiDream CorprationS.No-140/2A,141/1B And 141/1/E/5/B/130-11-2022 00:00:00
Maatr WatersMaatr Enterprises24/1 12/430-09-2023 00:00:00
Bhagwat And Jay VyankateshChaturthi Vastu Developers804 A B30-06-2027 00:00:00
Khushi ApartmentPavan Hastimal JainPlot No 113 22-05-2023 00:00:00
Shree Mangalmurti Builders And DevelopersVasanti Kashinath ChaudhariS No 65/4/1 Part Plot No 1130-09-2022 00:00:00
Larkins 315 Fio-AM/S Pushpak Developers31531-12-2024 00:00:00
Siddhakala HeightsRushabh Developers40060430-06-2024 00:00:00
Samruddhi ResidencyShree Sai Ganesh Developers16630-06-2025 00:00:00
Satyam Seven SkiesJai Jalaram EnterprisesPlot No.7A, Sector 17, Kharghar30-06-2024 00:00:00
Sai Kripa ResidencyGokuldham Builders &Amp; DevelopersThane, 42100310-04-2024 00:00:00
Indra NeelSonam Spark Infra Private Limited444/2B30-06-2026 00:00:00
Mahalaxmi ResidencySanjay Vasant ThakkarTika No 12 Cts No 59A30-06-2023 00:00:00
L M TowerL M Realty110/8, 110/1228-08-2023 00:00:00
Wisteria Square 1Rajdeep Realtors & Developers Pvt LtdS No 105 1 Pt And 2 Pt30-06-2024 00:00:00
Srushti Residency Building EPappu Developers & GroupS. No 69-21 And 28-3130-06-2024 00:00:00
Panvelkar PrestigeEshan DevelopersGut No 11 Plot No 13 14 15 16 17 18 19 20 21 Pt Cts No 928830-06-2024 00:00:00
Gulmohar Pink CityAmi Buildcon935330-06-2023 00:00:00
Kings CourtAmi Sai Construction35230-06-2023 00:00:00
Sector 2A - Wing BEversmile Properties Private LimitedNew Survey No 66Pt And 68Pt Of Village Penkarpada30-12-2027 00:00:00
Al Amin TowerS V BuildersBhiwandi30-06-2023 00:00:00
Hema KunjBhadrankar Enterprises LlpCts No 1618, New Survey No 359, H. Nos 2/1D And 1F28-08-2023 00:00:00
Maatr SkyeMaatr Ventures78/2/130-09-2025 00:00:00
Chadha ResidencyChadha Developers And PromotersG.No 21, 1361,2 G.No. 1386, 1410 At Karav G.No 262,3,4 G.No 281B,1C,1D,1E,2A,2B,2C,2D,4 And G.No 324,343,371,230-09-2026 00:00:00
Rai S NisargRai Residency Private LimitedKalyan E31-12-2025 00:00:00
The Icon Phase 3Leading Frontier Private Limited61/2F, 61/2G31-12-2026 00:00:00
The Icon Phase 4Leading Frontier Private Limited6021, 602231-12-2026 00:00:00
Jadhav GadhShree Samarth DevelopersSr No 13 H No 1031-12-2022 00:00:00
Sector 2A - Wing AEversmile Properties Private LimitedNew Survey No.68 Pt Of Village Penkarpada30-06-2027 00:00:00
Arihant City Phase-Ii - A BuildingArihant Enterprises49/1,49/2,49/3P,50/1P,52/1P,52/1P,53/1P,53/1P,53/1P,53/2P,55/P,55/P,55/P,56/P,56/P,56/P,57/3,57/4P,57/4P,85/1P31-12-2026 00:00:00
Arihant City Phase-Ii - B BuildingArihant Enterprises49/1,49/2,49/3P,50/1P,52/1P,52/1P,53/1P,53/1P,53/1P,53/2P,55/P,55/P,55/P,56/P,56/P,56/P,57/3,57/4P,57/4P,85/1P31-12-2026 00:00:00
Arihant City Phase-Ii - C BuildingArihant Enterprises49/1,49/2,49/3P,50/1P,52/1P,52/1P,53/1P,53/1P,53/1P,53/2P,55/P,55/P,55/P,56/P,56/P,56/P,57/3,57/4P,57/4P,85/1P31-12-2026 00:00:00
Shree Mauli PrabhaShree Prabha ConstructionCts No 8872 8873 Plot No 2031-07-2024 00:00:00
Project Details
  • Project:
    Shiv Jivdani Sadan
  • Location:
  • Survey No 29 Old S No 164 Hissa No 5
  • Const. Stage:
    New
  • Possession:
    30 May 2022
Developer Details

  • Developer:
    Shubham Builders & Developers
  • Phone:
  • Address:
  • Tulsi Pooja Building
Project RERA Details
MAHA REARA No: P51700021173
Project Type Residential / Group Housing
RERA Project Status New
Architect Tibin Tonson Thomas
Funding Bank IDBI BANK
Proposed Possession 30 May 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 16 Sep 2022
Last Retrived 26 Jul 2025
Shiv Jivdani Sadan QR Code
Shiv Jivdani Sadan
MahaRERA - P51700021173
Apartment Details & Configuration
TypeArea
1 BHK29.25 Sq.mts. ( 315 Sq.ft. )
1 BHK31.33 Sq.mts. ( 337 Sq.ft. )
1 BHK31.51 Sq.mts. ( 339 Sq.ft. )
1 BHK31.88 Sq.mts. ( 343 Sq.ft. )
1 BHK32.29 Sq.mts. ( 348 Sq.ft. )
1 BHK35 Sq.mts. ( 377 Sq.ft. )
1 BHK36.15 Sq.mts. ( 389 Sq.ft. )
1 BHK38 Sq.mts. ( 409 Sq.ft. )
1 BHK40 Sq.mts. ( 431 Sq.ft. )
1RK22.02 Sq.mts. ( 237 Sq.ft. )
1RK22.14 Sq.mts. ( 238 Sq.ft. )
1RK22.62 Sq.mts. ( 243 Sq.ft. )
1RK23.42 Sq.mts. ( 252 Sq.ft. )
1RK23.47 Sq.mts. ( 253 Sq.ft. )
1RK25 Sq.mts. ( 269 Sq.ft. )
1RK26.33 Sq.mts. ( 283 Sq.ft. )
2 BHK47.52 Sq.mts. ( 512 Sq.ft. )
3 BHK70.32 Sq.mts. ( 757 Sq.ft. )
4 BHK172.61 Sq.mts. ( 1858 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shiv Jivdani Sadanlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
1 Electric Meter Room/Space For Each Building
Energy management
Solar System
Fire Protection And Fire Safety Requirements
Fire Safety Measures Will Be Installed
Landscaping & Tree Planting
Minimum 10 Trees
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Sewerage Will Be Connected With Kdmc Sewerage Line
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting
Water Supply
Water Supply Will Be Provided By Kdmc
Buildings / Wings in Shiv Jivdani Sadan
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shiv Jivdani Sadan by Shubham Builders & Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

17438 Sq. ft.

Project Area

2616 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

83 apartments in total
Total
83
Booked
62
Available
21

Saleable Area Statistics (Sq. ft.)

28769 Total
Total
28769
Booked
20011
Available
8758
Total 83 apartments in project. 62 apartments booked. 74% apartments booked.
Total 28769 Sq.ft. saleable area. 20011 saleable area booked.
70% area booked.

Building No 2, C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2, C WingMay 20219109009
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.25 Sq.mts. ( 315 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK31.33 Sq.mts. ( 337 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK31.51 Sq.mts. ( 339 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK31.88 Sq.mts. ( 343 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK32.29 Sq.mts. ( 348 Sq.ft. )7
4 Booked57% Booked
57% Booked
1 BHK35 Sq.mts. ( 377 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK36.15 Sq.mts. ( 389 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK38 Sq.mts. ( 409 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK40 Sq.mts. ( 431 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK22.02 Sq.mts. ( 237 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK22.14 Sq.mts. ( 238 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK22.62 Sq.mts. ( 243 Sq.ft. )14
13 Booked92% Booked
92% Booked
1RK23.42 Sq.mts. ( 252 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK23.47 Sq.mts. ( 253 Sq.ft. )7
7 Booked100% Booked
100% Booked
1RK25 Sq.mts. ( 269 Sq.ft. )13
4 Booked30% Booked
30% Booked
1RK26.33 Sq.mts. ( 283 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK47.52 Sq.mts. ( 512 Sq.ft. )7
5 Booked71% Booked
71% Booked
3 BHK70.32 Sq.mts. ( 757 Sq.ft. )2
1 Booked50% Booked
50% Booked
82 total apartments / 62 apartments booked. 75% apartments booked.
Work Description in Building Building No 2, C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress32% done
32% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress20% done
20% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress20% done
20% Booked

Building No 3,E Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 3,E WingMay 20213102002
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
4 BHK172.61 Sq.mts. ( 1858 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 3,E WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Shubham Builders & Developers
for Project
Shiv Jivdani Sadan
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation