Project overview

Sheth Cnergy Malad is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800027269. Sheth Cnergy Malad is located at Part Of Cts No 104/B Of Village Dindoshi. This is a New being developed by Sheth Developers Private Limited.

Sheth Cnergy Malad has Shop Apartments with carpet areas ranging from 431 to 504 Sq.ft. Carpet. The Project has total 45 of which 4 are currently available for sale.

Sheth Cnergy Malad is being developed on a total land area of 7320 Sq.ft. Sheth Cnergy Malad has 1 Wings / Towers Sheth Cnergy

ProjectDeveloperLocationPossession
Mauli OmkarMauli Sai Developers Pvt Ltd701B/1/A To 701B/8/A, 701B/1A/1/1 And 701B/1A/1/1/9 To 3008-07-2023 00:00:00
Sheth Blue IvySheth Developers Private LimitedCts 104-A Of Village Dindoshi At Malad East Mumbai 40009730-06-2023 00:00:00
Project Details
  • Project:
    Sheth Cnergy Malad
  • Location:
  • Part Of Cts No 104/B Of Village Dindoshi
  • Const. Stage:
    New
  • Possession:
    30 Jun 2023
Developer Details

  • Developer:
    Sheth Developers Private Limited
  • Phone:
  • Address:
  • Prius Infinity
Project RERA Details
MAHA REARA No: P51800027269
Project Type Commercial
RERA Project Status New
Architect K.R. Lotlikar & Asso.
Funding Bank INDUSIND BANK
Proposed Possession 30 Jun 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 07 Apr 2025
Last Retrived 26 Jul 2025
Sheth Cnergy Malad QR Code
Sheth Cnergy Malad
MahaRERA - P51800027269
Apartment Details & Configuration
TypeArea
Shop40.04 Sq.mts. ( 431 Sq.ft. )
Shop41.37 Sq.mts. ( 445 Sq.ft. )
Shop42.82 Sq.mts. ( 461 Sq.ft. )
Shop45.5 Sq.mts. ( 490 Sq.ft. )
Shop46.83 Sq.mts. ( 504 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sheth Cnergy Maladlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
-
Community Buildings
Na
Covered parking50% completed
50% Complete
Na
Electrical Meter Room, Sub-Station, Receiving Station
Only Electrical Meter Room
Energy management
-
Fire Protection And Fire Safety Requirements
-
Landscaping & Tree Planting100% completed
95% Complete
-
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
-
Solid Waste Management And Disposal
Na
Storm Water Drains
-
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
-
Water Supply
-
Buildings / Wings in Sheth Cnergy Malad
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sheth Cnergy Malad by Sheth Developers Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

7320 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

45 apartments in total
Total
45
Booked
41
Available
4

Saleable Area Statistics (Sq. ft.)

20979 Total
Total
20979
Booked
19138
Available
1842
Total 45 apartments in project. 41 apartments booked. 91% apartments booked.
Total 20979 Sq.ft. saleable area. 19138 saleable area booked.
91% area booked.

Sheth Cnergy

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sheth CnergyDec 202291010037
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Shop40.04 Sq.mts. ( 431 Sq.ft. )9
7 Booked77% Booked
77% Booked
Shop41.37 Sq.mts. ( 445 Sq.ft. )9
9 Booked100% Booked
100% Booked
Shop42.82 Sq.mts. ( 461 Sq.ft. )9
9 Booked100% Booked
100% Booked
Shop45.5 Sq.mts. ( 490 Sq.ft. )9
7 Booked77% Booked
77% Booked
Shop46.83 Sq.mts. ( 504 Sq.ft. )9
9 Booked100% Booked
100% Booked
45 total apartments / 41 apartments booked. 91% apartments booked.
Work Description in Building Sheth CnergyCompletion
Basement (if any)
work-in-progress95% done
95% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
work-in-progress95% done
95% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress95% done
95% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Sheth Developers Private Limited
for Project
Sheth Cnergy Malad
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation