Project overview

Sheltrex Smart Phone City Project 1 - Phase Iv is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000007063. Sheltrex Smart Phone City Project 1 - Phase Iv is located at Survey No. 7B/1 To 7B/14. This is a Ongoing being developed by Sheltrex Karjat Pvt. Ltd..

Sheltrex Smart Phone City Project 1 - Phase Iv has Residential Apartments with carpet areas ranging from 10764 to 10764 Sq.ft. Carpet. The Project has total 4199 of which 3459 are currently available for sale.

Sheltrex Smart Phone City Project 1 - Phase Iv is being developed on a total land area of 505908 Sq.ft. out of which 528825 Sq.ft. i.e 105% is reserved for recreational purposes. Sheltrex Smart Phone City Project 1 - Phase Iv has 63 Wings / Towers C1,C2,C3,C4,C5,Club House,Commercial/Amenity Building Proposed But Not Sanc,D1,D2,D3,D6,G1,G4,G5,G6,H1,H14,H2,H3,H4,H5,H6,H7,I1,Ii Proposed But Not Sanctioned,Pns-1 Proposed But Not Sanctioned,Pns-10 Proposed But Not Sanctioned,Pns-11 Proposed But Not Sanctioned,Pns-12 Proposed But Not Sanctioned,Pns-13 Proposed But Not Sanctioned,Pns-14 Proposed But Not Sanctioned,Pns-15 Proposed But Not Sanctioned,Pns-16 Proposed But Not Sanctioned,Pns-17 Proposed But Not Sanctioned,Pns-18 Proposed But Not Sanctioned,Pns-19 Proposed But Not Sanctioned,Pns-2 Proposed But Not Sanctioned,Pns-20 Proposed But Not Sanctioned,Pns-21 Proposed But Not Sanctioned,Pns-22 Proposed But Not Sanctioned,Pns-23 Proposed But Not Sanctioned,Pns-24 Proposed But Not Sanctioned,Pns-25 Proposed But Not Sanctioned,Pns-3 Proposed But Not Sanctioned,Pns-4 Proposed But Not Sanctioned,Pns-5 Proposed But Not Sanctioned,Pns-6 Proposed But Not Sanctioned,Pns-7 Proposed But Not Sanctioned,Pns-8 Proposed But Not Sanctioned,Pns-9 Proposed But Not Sanctioned,Pr1,Pr10,Pr2,Pr3,Pr4,Pr5,Pr6,Pr7,Pr8,Pr9,School,Shopping Mall,Tt Building Proposed But Not Sanctioned

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Sheltrex Smart Phone City Project 1 - Phase Iv
  • Location:
  • Survey No. 7B/1 To 7B/14
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2021
Developer Details

  • Developer:
    Sheltrex Karjat Pvt. Ltd.
  • Phone:
  • Address:
  • Na
Project RERA Details
MAHA REARA No: P52000007063
Project Type Others
RERA Project Status Ongoing
Architect Rahul Shivaji Agaj
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2021
Revised Possession 30 Dec 2021
Extended Possession
Litigations No Litigations
Last Modified 17 Aug 2017
Last Retrived 28 Jul 2025
Sheltrex Smart Phone City Project 1 - Phase Iv QR Code
Sheltrex Smart Phone City Project 1 - Phase Iv
MahaRERA - P52000007063
Apartment Details & Configuration
TypeArea
1HK18.35 Sq.mts. ( 198 Sq.ft. )
1HK18.64 Sq.mts. ( 201 Sq.ft. )
1HKR28.04 Sq.mts. ( 302 Sq.ft. )
Club House528.6 Sq.mts. ( 5690 Sq.ft. )
Mix Use4645 Sq.mts. ( 49999 Sq.ft. )
1 BHK26.26 Sq.mts. ( 283 Sq.ft. )
1 BHKR35.23 Sq.mts. ( 379 Sq.ft. )
1RK13.52 Sq.mts. ( 146 Sq.ft. )
Resi Apt8000 Sq.mts. ( 86112 Sq.ft. )
Residential4480 Sq.mts. ( 48223 Sq.ft. )
SHOP13.85 Sq.mts. ( 149 Sq.ft. )
SHOP15 Sq.mts. ( 161 Sq.ft. )
SHOP18.5 Sq.mts. ( 199 Sq.ft. )
SHOP47.7 Sq.mts. ( 513 Sq.ft. )
SHOP80.57 Sq.mts. ( 867 Sq.ft. )
SHOP14.36 Sq.mts. ( 155 Sq.ft. )
SHOP14.49 Sq.mts. ( 156 Sq.ft. )
SHOP14.95 Sq.mts. ( 161 Sq.ft. )
SHOP15.51 Sq.mts. ( 167 Sq.ft. )
SHOP15.69 Sq.mts. ( 169 Sq.ft. )
SHOP16.3 Sq.mts. ( 175 Sq.ft. )
SHOP18.55 Sq.mts. ( 200 Sq.ft. )
SHOP39.49 Sq.mts. ( 425 Sq.ft. )
SHOP140.15 Sq.mts. ( 1509 Sq.ft. )
SHOP13.18 Sq.mts. ( 142 Sq.ft. )
SHOP14.5 Sq.mts. ( 156 Sq.ft. )
SHOP18.47 Sq.mts. ( 199 Sq.ft. )
SHOP32.04 Sq.mts. ( 345 Sq.ft. )
SHOP18.46 Sq.mts. ( 199 Sq.ft. )
SHOP14.35 Sq.mts. ( 154 Sq.ft. )
SHOP18.99 Sq.mts. ( 204 Sq.ft. )
SHOP21.67 Sq.mts. ( 233 Sq.ft. )
SHOP47.5 Sq.mts. ( 511 Sq.ft. )
SHOP14.13 Sq.mts. ( 152 Sq.ft. )
SHOP15.3 Sq.mts. ( 165 Sq.ft. )
SHOP16.97 Sq.mts. ( 183 Sq.ft. )
SHOP17.39 Sq.mts. ( 187 Sq.ft. )
SHOP25.96 Sq.mts. ( 279 Sq.ft. )
SHOP29.79 Sq.mts. ( 321 Sq.ft. )
SHOP53.32 Sq.mts. ( 574 Sq.ft. )
SHOP20 Sq.mts. ( 215 Sq.ft. )
SHOP28 Sq.mts. ( 301 Sq.ft. )
SHOP17.89 Sq.mts. ( 193 Sq.ft. )
SHOP18.53 Sq.mts. ( 199 Sq.ft. )
SHOP32.03 Sq.mts. ( 345 Sq.ft. )
SHOP13.77 Sq.mts. ( 148 Sq.ft. )
SHOP17.01 Sq.mts. ( 183 Sq.ft. )
SHOP56.51 Sq.mts. ( 608 Sq.ft. )
SHOP80.15 Sq.mts. ( 863 Sq.ft. )
Educational Bldg1224.77 Sq.mts. ( 13183 Sq.ft. )
MULTIPLEX2511.34 Sq.mts. ( 27032 Sq.ft. )
SHOP14.82 Sq.mts. ( 160 Sq.ft. )
SHOP19.01 Sq.mts. ( 205 Sq.ft. )
SHOP30.51 Sq.mts. ( 328 Sq.ft. )
SHOP30.8 Sq.mts. ( 332 Sq.ft. )
SHOP38.4 Sq.mts. ( 413 Sq.ft. )
SHOP40.57 Sq.mts. ( 437 Sq.ft. )
SHOP48 Sq.mts. ( 517 Sq.ft. )
SHOP51.48 Sq.mts. ( 554 Sq.ft. )
SHOP51.52 Sq.mts. ( 555 Sq.ft. )
SHOP55.55 Sq.mts. ( 598 Sq.ft. )
SHOP56.57 Sq.mts. ( 609 Sq.ft. )
SHOP65.76 Sq.mts. ( 708 Sq.ft. )
SHOP82.59 Sq.mts. ( 889 Sq.ft. )
SHOP88.03 Sq.mts. ( 948 Sq.ft. )
SHOP99.42 Sq.mts. ( 1070 Sq.ft. )
SHOP104.85 Sq.mts. ( 1129 Sq.ft. )
SHOP121.68 Sq.mts. ( 1310 Sq.ft. )
SHOP124.42 Sq.mts. ( 1339 Sq.ft. )
SHOP124.52 Sq.mts. ( 1340 Sq.ft. )
SHOP218.01 Sq.mts. ( 2347 Sq.ft. )
SHOP883.19 Sq.mts. ( 9507 Sq.ft. )
Residential1000 Sq.mts. ( 10764 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sheltrex Smart Phone City Project 1 - Phase Ivlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Approved Layout
Club house and Swimming Pool
Private And Payable Facility
Community Buildings
Common Club House &Amp; Swimming Pool For Project-1&Amp;2
Electrical Meter Room, Sub-Station, Receiving Station
As Per Power Suppliers Specification
Energy management
Solar Panel To Take Partial Load In Common Areas
Fire Protection And Fire Safety Requirements
As Per Fire Noc
Landscaping & Tree Planting
As Per Design
Open Parking
As Per Approved Layout
School
For All
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Design
Shopping Mall
For All
Solid Waste Management And Disposal
As Per Design
Storm Water Drains
As Per Design
Street Lighting
As Per Design
Treatment And Disposal Of Sewage And Sullage Water
As Per Design
Water Conservation, Rain water Harvesting
As Per Design
Water Supply
Bore Well
Buildings / Wings in Sheltrex Smart Phone City Project 1 - Phase Iv
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sheltrex Smart Phone City Project 1 - Phase Iv by Sheltrex Karjat Pvt. Ltd.last updated on 28 Jul 2025 as per information obtained from MARA RERA.

505908 Sq. ft.

Project Area

528825 Sq. ft.

Recreational Open Space

Total 63

Wings / Towers in Project

Apartments Statistics

4199 apartments in total
Total
4199
Booked
740
Available
3459

Saleable Area Statistics (Sq. ft.)

157709273 Total
Total
157709273
Booked
175515
Available
157533756
Total 4199 apartments in project. 740 apartments booked. 17% apartments booked.
Total 157709273 Sq.ft. saleable area. 175515 saleable area booked.
0% area booked.

C1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C1Jan 19003100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1HK18.35 Sq.mts. ( 198 Sq.ft. )6
4 Booked66% Booked
66% Booked
1HK18.64 Sq.mts. ( 201 Sq.ft. )27
27 Booked100% Booked
100% Booked
1HKR28.04 Sq.mts. ( 302 Sq.ft. )3
2 Booked66% Booked
66% Booked
36 total apartments / 33 apartments booked. 91% apartments booked.
Work Description in Building C1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress33% done
33% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor

C2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C2Jan 19003100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1HK18.35 Sq.mts. ( 198 Sq.ft. )6
6 Booked100% Booked
100% Booked
1HK18.64 Sq.mts. ( 201 Sq.ft. )27
25 Booked92% Booked
92% Booked
1HKR28.04 Sq.mts. ( 302 Sq.ft. )3
None Booked0% Booked
0% Booked
36 total apartments / 31 apartments booked. 86% apartments booked.
Work Description in Building C2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress33% done
33% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor

C3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C3Jan 19003100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1HK18.35 Sq.mts. ( 198 Sq.ft. )6
4 Booked66% Booked
66% Booked
1HK18.64 Sq.mts. ( 201 Sq.ft. )27
26 Booked96% Booked
96% Booked
1HKR28.04 Sq.mts. ( 302 Sq.ft. )3
3 Booked100% Booked
100% Booked
36 total apartments / 33 apartments booked. 91% apartments booked.
Work Description in Building C3Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

C4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C4Jan 19003100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1HK18.35 Sq.mts. ( 198 Sq.ft. )6
5 Booked83% Booked
83% Booked
1HK18.64 Sq.mts. ( 201 Sq.ft. )27
25 Booked92% Booked
92% Booked
1HKR28.04 Sq.mts. ( 302 Sq.ft. )3
2 Booked66% Booked
66% Booked
36 total apartments / 32 apartments booked. 88% apartments booked.
Work Description in Building C4Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

C5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C5Jan 19003100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1HK18.35 Sq.mts. ( 198 Sq.ft. )6
5 Booked83% Booked
83% Booked
1HKR28.04 Sq.mts. ( 302 Sq.ft. )3
2 Booked66% Booked
66% Booked
IHK18.64 Sq.mts. ( 201 Sq.ft. )27
27 Booked100% Booked
100% Booked
36 total apartments / 34 apartments booked. 94% apartments booked.
Work Description in Building C5Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Club House

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Club HouseJan 19001100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Club House528.6 Sq.mts. ( 5690 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Club HouseCompletion

Commercial/Amenity Building Proposed But Not Sanc

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Commercial/Amenity Building Proposed But Not SancJan 19004100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Mix Use4645 Sq.mts. ( 49999 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Commercial/Amenity Building Proposed But Not SancCompletion

D1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D1Jan 19003100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1HK18.35 Sq.mts. ( 198 Sq.ft. )6
6 Booked100% Booked
100% Booked
1HK18.64 Sq.mts. ( 201 Sq.ft. )51
46 Booked90% Booked
90% Booked
1HKR28.04 Sq.mts. ( 302 Sq.ft. )3
1 Booked33% Booked
33% Booked
60 total apartments / 53 apartments booked. 88% apartments booked.
Work Description in Building D1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress33% done
33% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor

D2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D2Jan 19003100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1HK18.35 Sq.mts. ( 198 Sq.ft. )6
6 Booked100% Booked
100% Booked
1HK18.64 Sq.mts. ( 201 Sq.ft. )51
46 Booked90% Booked
90% Booked
1HKR28.04 Sq.mts. ( 302 Sq.ft. )3
3 Booked100% Booked
100% Booked
60 total apartments / 55 apartments booked. 91% apartments booked.
Work Description in Building D2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress33% done
33% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor

D3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D3Jan 19003100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1HK18.35 Sq.mts. ( 198 Sq.ft. )6
6 Booked100% Booked
100% Booked
1HK18.64 Sq.mts. ( 201 Sq.ft. )51
48 Booked94% Booked
94% Booked
1HKR28.04 Sq.mts. ( 302 Sq.ft. )3
2 Booked66% Booked
66% Booked
60 total apartments / 56 apartments booked. 93% apartments booked.
Work Description in Building D3Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

D6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D6Jan 19003100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1HK18.35 Sq.mts. ( 198 Sq.ft. )6
6 Booked100% Booked
100% Booked
1HK18.64 Sq.mts. ( 201 Sq.ft. )51
45 Booked88% Booked
88% Booked
1HKR28.04 Sq.mts. ( 302 Sq.ft. )3
3 Booked100% Booked
100% Booked
60 total apartments / 54 apartments booked. 90% apartments booked.
Work Description in Building D6Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress33% done
33% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor

G1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
G1Jan 190031000600
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.26 Sq.mts. ( 283 Sq.ft. )21
14 Booked66% Booked
66% Booked
1 BHKR35.23 Sq.mts. ( 379 Sq.ft. )3
2 Booked66% Booked
66% Booked
24 total apartments / 16 apartments booked. 66% apartments booked.
Work Description in Building G1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress67% done
67% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor

G4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
G4Jan 190031000600
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.26 Sq.mts. ( 283 Sq.ft. )21
19 Booked90% Booked
90% Booked
1 BHKR35.23 Sq.mts. ( 379 Sq.ft. )3
3 Booked100% Booked
100% Booked
24 total apartments / 22 apartments booked. 91% apartments booked.
Work Description in Building G4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress67% done
67% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor

G5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
G5Jan 190031000600
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.26 Sq.mts. ( 283 Sq.ft. )21
16 Booked76% Booked
76% Booked
1 BHKR35.23 Sq.mts. ( 379 Sq.ft. )3
3 Booked100% Booked
100% Booked
24 total apartments / 19 apartments booked. 79% apartments booked.
Work Description in Building G5Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress67% done
67% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor

G6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
G6Jan 190031000600
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.26 Sq.mts. ( 283 Sq.ft. )21
18 Booked85% Booked
85% Booked
1 BHKR35.23 Sq.mts. ( 379 Sq.ft. )3
3 Booked100% Booked
100% Booked
24 total apartments / 21 apartments booked. 87% apartments booked.
Work Description in Building G6Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

H1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
H1Jan 190031000900
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.26 Sq.mts. ( 283 Sq.ft. )33
28 Booked84% Booked
84% Booked
1 BHKR35.23 Sq.mts. ( 379 Sq.ft. )3
1 Booked33% Booked
33% Booked
36 total apartments / 29 apartments booked. 80% apartments booked.
Work Description in Building H1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress33% done
33% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor

H14

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
H14Jan 19003100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK13.52 Sq.mts. ( 146 Sq.ft. )51
47 Booked92% Booked
92% Booked
51 total apartments / 47 apartments booked. 92% apartments booked.
Work Description in Building H14Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

H2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
H2Jan 190031000900
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.26 Sq.mts. ( 283 Sq.ft. )33
23 Booked69% Booked
69% Booked
1 BHKR35.23 Sq.mts. ( 379 Sq.ft. )3
3 Booked100% Booked
100% Booked
36 total apartments / 26 apartments booked. 72% apartments booked.
Work Description in Building H2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress33% done
33% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor

H3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
H3Jan 190031000900
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.26 Sq.mts. ( 283 Sq.ft. )33
28 Booked84% Booked
84% Booked
1 BHKR35.23 Sq.mts. ( 379 Sq.ft. )3
3 Booked100% Booked
100% Booked
36 total apartments / 31 apartments booked. 86% apartments booked.
Work Description in Building H3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress33% done
33% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor

H4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
H4Jan 190031000900
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.26 Sq.mts. ( 283 Sq.ft. )33
30 Booked90% Booked
90% Booked
1 BHKR35.23 Sq.mts. ( 379 Sq.ft. )3
3 Booked100% Booked
100% Booked
36 total apartments / 33 apartments booked. 91% apartments booked.
Work Description in Building H4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor

H5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
H5Jan 190031000900
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.26 Sq.mts. ( 283 Sq.ft. )33
25 Booked75% Booked
75% Booked
1 BHKR35.23 Sq.mts. ( 379 Sq.ft. )3
2 Booked66% Booked
66% Booked
36 total apartments / 27 apartments booked. 75% apartments booked.
Work Description in Building H5Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress33% done
33% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor

H6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
H6Jan 19003100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.26 Sq.mts. ( 283 Sq.ft. )33
25 Booked75% Booked
75% Booked
1 BHKR35.23 Sq.mts. ( 379 Sq.ft. )3
2 Booked66% Booked
66% Booked
36 total apartments / 27 apartments booked. 75% apartments booked.
Work Description in Building H6Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress33% done
33% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor

H7

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
H7Jan 190031000900
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.26 Sq.mts. ( 283 Sq.ft. )33
22 Booked66% Booked
66% Booked
1 BHKR35.23 Sq.mts. ( 379 Sq.ft. )3
3 Booked100% Booked
100% Booked
36 total apartments / 25 apartments booked. 69% apartments booked.
Work Description in Building H7Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress33% done
33% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor

I1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
I1Jan 190031000900
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.26 Sq.mts. ( 283 Sq.ft. )33
29 Booked87% Booked
87% Booked
1 BHKR35.23 Sq.mts. ( 379 Sq.ft. )3
2 Booked66% Booked
66% Booked
36 total apartments / 31 apartments booked. 86% apartments booked.
Work Description in Building I1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress33% done
33% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor

Ii Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ii Proposed But Not SanctionedJan 190012100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Resi Apt8000 Sq.mts. ( 86112 Sq.ft. )144
None Booked0% Booked
0% Booked
144 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Ii Proposed But Not SanctionedCompletion

Pns-1 Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pns-1 Proposed But Not SanctionedJan 190018100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential4480 Sq.mts. ( 48223 Sq.ft. )120
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pns-1 Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pns-10 Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pns-10 Proposed But Not SanctionedJan 190018100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential4480 Sq.mts. ( 48223 Sq.ft. )120
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pns-10 Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pns-11 Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pns-11 Proposed But Not SanctionedJan 190018100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential4480 Sq.mts. ( 48223 Sq.ft. )120
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pns-11 Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pns-12 Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pns-12 Proposed But Not SanctionedJan 190018100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential4480 Sq.mts. ( 48223 Sq.ft. )120
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pns-12 Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pns-13 Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pns-13 Proposed But Not SanctionedJan 190018100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential4480 Sq.mts. ( 48223 Sq.ft. )120
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pns-13 Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pns-14 Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pns-14 Proposed But Not SanctionedJan 190018100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential4480 Sq.mts. ( 48223 Sq.ft. )120
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pns-14 Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pns-15 Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pns-15 Proposed But Not SanctionedJan 190018100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential4480 Sq.mts. ( 48223 Sq.ft. )120
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pns-15 Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pns-16 Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pns-16 Proposed But Not SanctionedJan 190018100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential4480 Sq.mts. ( 48223 Sq.ft. )120
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pns-16 Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pns-17 Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pns-17 Proposed But Not SanctionedJan 190018100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential4480 Sq.mts. ( 48223 Sq.ft. )120
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pns-17 Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pns-18 Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pns-18 Proposed But Not SanctionedJan 190018100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential4480 Sq.mts. ( 48223 Sq.ft. )120
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pns-18 Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pns-19 Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pns-19 Proposed But Not SanctionedJan 190018100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential4480 Sq.mts. ( 48223 Sq.ft. )120
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pns-19 Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pns-2 Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pns-2 Proposed But Not SanctionedJan 190018100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential4480 Sq.mts. ( 48223 Sq.ft. )120
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pns-2 Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pns-20 Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pns-20 Proposed But Not SanctionedJan 190018100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential4480 Sq.mts. ( 48223 Sq.ft. )120
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pns-20 Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pns-21 Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pns-21 Proposed But Not SanctionedJan 190018100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential4480 Sq.mts. ( 48223 Sq.ft. )120
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pns-21 Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pns-22 Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pns-22 Proposed But Not SanctionedJan 190018100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential4480 Sq.mts. ( 48223 Sq.ft. )120
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pns-22 Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pns-23 Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pns-23 Proposed But Not SanctionedJan 190018100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential4480 Sq.mts. ( 48223 Sq.ft. )120
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pns-23 Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pns-24 Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pns-24 Proposed But Not SanctionedJan 190018100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential4480 Sq.mts. ( 48223 Sq.ft. )120
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pns-24 Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pns-25 Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pns-25 Proposed But Not SanctionedJan 190018100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential4480 Sq.mts. ( 48223 Sq.ft. )120
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pns-25 Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pns-3 Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pns-3 Proposed But Not SanctionedJan 190018100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential4480 Sq.mts. ( 48223 Sq.ft. )120
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pns-3 Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pns-4 Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pns-4 Proposed But Not SanctionedJan 190018100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential4480 Sq.mts. ( 48223 Sq.ft. )120
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pns-4 Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pns-5 Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pns-5 Proposed But Not SanctionedJan 190018100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential4480 Sq.mts. ( 48223 Sq.ft. )120
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pns-5 Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pns-6 Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pns-6 Proposed But Not SanctionedJan 190018100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential4480 Sq.mts. ( 48223 Sq.ft. )120
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pns-6 Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pns-7 Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pns-7 Proposed But Not SanctionedJan 190018100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential4480 Sq.mts. ( 48223 Sq.ft. )120
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pns-7 Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pns-8 Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pns-8 Proposed But Not SanctionedJan 190018100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential4480 Sq.mts. ( 48223 Sq.ft. )120
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pns-8 Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pns-9 Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pns-9 Proposed But Not SanctionedJan 190018100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential4480 Sq.mts. ( 48223 Sq.ft. )120
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pns-9 Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pr1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pr1Jan 19001100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
SHOP13.85 Sq.mts. ( 149 Sq.ft. )10
None Booked0% Booked
0% Booked
SHOP15 Sq.mts. ( 161 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP18.5 Sq.mts. ( 199 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP47.7 Sq.mts. ( 513 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP80.57 Sq.mts. ( 867 Sq.ft. )1
None Booked0% Booked
0% Booked
14 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pr1Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pr10

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pr10Jan 19001100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
SHOP13.85 Sq.mts. ( 149 Sq.ft. )5
None Booked0% Booked
0% Booked
SHOP14.36 Sq.mts. ( 155 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP14.49 Sq.mts. ( 156 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP14.95 Sq.mts. ( 161 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP15.51 Sq.mts. ( 167 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP15.69 Sq.mts. ( 169 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP16.3 Sq.mts. ( 175 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP18.55 Sq.mts. ( 200 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP39.49 Sq.mts. ( 425 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP140.15 Sq.mts. ( 1509 Sq.ft. )1
None Booked0% Booked
0% Booked
14 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pr10Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pr2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pr2Jan 19001100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
SHOP13.18 Sq.mts. ( 142 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP13.85 Sq.mts. ( 149 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP14.5 Sq.mts. ( 156 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP15 Sq.mts. ( 161 Sq.ft. )3
None Booked0% Booked
0% Booked
SHOP18.47 Sq.mts. ( 199 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP32.04 Sq.mts. ( 345 Sq.ft. )1
None Booked0% Booked
0% Booked
9 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pr2Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pr3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pr3Jan 19001100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
SHOP13.18 Sq.mts. ( 142 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP13.85 Sq.mts. ( 149 Sq.ft. )2
1 Booked50% Booked
50% Booked
SHOP14.5 Sq.mts. ( 156 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP15 Sq.mts. ( 161 Sq.ft. )3
None Booked0% Booked
0% Booked
SHOP18.46 Sq.mts. ( 199 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP32.04 Sq.mts. ( 345 Sq.ft. )1
None Booked0% Booked
0% Booked
9 total apartments / 1 apartments booked. 11% apartments booked.
Work Description in Building Pr3Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pr4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pr4Jan 19001100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
SHOP14.35 Sq.mts. ( 154 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP14.5 Sq.mts. ( 156 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP15 Sq.mts. ( 161 Sq.ft. )8
None Booked0% Booked
0% Booked
SHOP18.99 Sq.mts. ( 204 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP21.67 Sq.mts. ( 233 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP47.5 Sq.mts. ( 511 Sq.ft. )1
None Booked0% Booked
0% Booked
13 total apartments / 2 apartments booked. 15% apartments booked.
Work Description in Building Pr4Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pr5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pr5Jan 19001100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
SHOP14.13 Sq.mts. ( 152 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP15 Sq.mts. ( 161 Sq.ft. )4
None Booked0% Booked
0% Booked
SHOP15.3 Sq.mts. ( 165 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP16.97 Sq.mts. ( 183 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP17.39 Sq.mts. ( 187 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP18.99 Sq.mts. ( 204 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP25.96 Sq.mts. ( 279 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP29.79 Sq.mts. ( 321 Sq.ft. )1
None Booked0% Booked
0% Booked
11 total apartments / 2 apartments booked. 18% apartments booked.
Work Description in Building Pr5Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pr6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pr6Jan 19001100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
SHOP53.32 Sq.mts. ( 574 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pr6Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pr7

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pr7Jan 19001100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
SHOP13.85 Sq.mts. ( 149 Sq.ft. )3
None Booked0% Booked
0% Booked
SHOP18.55 Sq.mts. ( 200 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP20 Sq.mts. ( 215 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP28 Sq.mts. ( 301 Sq.ft. )1
None Booked0% Booked
0% Booked
6 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pr7Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pr8

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pr8Jan 19001100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
SHOP13.85 Sq.mts. ( 149 Sq.ft. )9
None Booked0% Booked
0% Booked
SHOP17.89 Sq.mts. ( 193 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP18.53 Sq.mts. ( 199 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP32.03 Sq.mts. ( 345 Sq.ft. )1
None Booked0% Booked
0% Booked
12 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pr8Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Pr9

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pr9Jan 19001100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
SHOP13.77 Sq.mts. ( 148 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP14.13 Sq.mts. ( 152 Sq.ft. )7
None Booked0% Booked
0% Booked
SHOP15.3 Sq.mts. ( 165 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP17.01 Sq.mts. ( 183 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP56.51 Sq.mts. ( 608 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP80.15 Sq.mts. ( 863 Sq.ft. )1
None Booked0% Booked
0% Booked
12 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pr9Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

School

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
SchoolJan 190021000600
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Educational Bldg1224.77 Sq.mts. ( 13183 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building SchoolCompletion

Shopping Mall

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shopping MallJan 19003100011410
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
MULTIPLEX2511.34 Sq.mts. ( 27032 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP14.82 Sq.mts. ( 160 Sq.ft. )6
None Booked0% Booked
0% Booked
SHOP19.01 Sq.mts. ( 205 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP30.51 Sq.mts. ( 328 Sq.ft. )16
None Booked0% Booked
0% Booked
SHOP30.8 Sq.mts. ( 332 Sq.ft. )12
None Booked0% Booked
0% Booked
SHOP38.4 Sq.mts. ( 413 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP40.57 Sq.mts. ( 437 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP48 Sq.mts. ( 517 Sq.ft. )7
None Booked0% Booked
0% Booked
SHOP51.48 Sq.mts. ( 554 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP51.52 Sq.mts. ( 555 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP55.55 Sq.mts. ( 598 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP56.57 Sq.mts. ( 609 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP65.76 Sq.mts. ( 708 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP82.59 Sq.mts. ( 889 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP88.03 Sq.mts. ( 948 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP99.42 Sq.mts. ( 1070 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP104.85 Sq.mts. ( 1129 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP121.68 Sq.mts. ( 1310 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP124.42 Sq.mts. ( 1339 Sq.ft. )3
None Booked0% Booked
0% Booked
SHOP124.52 Sq.mts. ( 1340 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP218.01 Sq.mts. ( 2347 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP883.19 Sq.mts. ( 9507 Sq.ft. )2
None Booked0% Booked
0% Booked
72 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Shopping MallCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Tt Building Proposed But Not Sanctioned

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tt Building Proposed But Not SanctionedJan 19003100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential1000 Sq.mts. ( 10764 Sq.ft. )24
None Booked0% Booked
0% Booked
24 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Tt Building Proposed But Not SanctionedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
Sheltrex Karjat Pvt. Ltd.
for Project
Sheltrex Smart Phone City Project 1 - Phase Iv
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation