Project overview

Shelter Dream is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000049410. Shelter Dream is located at Survey No 109/12. This is a New being developed by Rabbani Shamsuddin Khan.

Shelter Dream has 1 BHK, 2 BHK & Shop Apartments with carpet areas ranging from 130 to 100 Sq.ft. Carpet. The Project has total 136 of which 92 are currently available for sale.

Shelter Dream is being developed on a total land area of 21528 Sq.ft. Shelter Dream has 4 Wings / Towers Shelter Dream A Wing,Shelter Dream B Wing,Shelter Dream C Wing,Shelter Dream D Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Shelter Dream
  • Location:
  • Survey No 109/12
  • Const. Stage:
    New
  • Possession:
    31 Dec 2027
Developer Details

  • Developer:
    Rabbani Shamsuddin Khan
  • Phone:
  • Address:
  • Shivam Apartment
Project RERA Details
MAHA REARA No: P52000049410
Project Type Others
RERA Project Status New
Architect Abrar Khan Architects
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2027
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 08 Feb 2023
Last Retrived 28 Jul 2025
Shelter Dream QR Code
Shelter Dream
MahaRERA - P52000049410
Apartment Details & Configuration
TypeArea
1 BHK31 Sq.mts. ( 334 Sq.ft. )
2 BHK41.8 Sq.mts. ( 450 Sq.ft. )
Shop9.29 Sq.mts. ( 100 Sq.ft. )
Shop12.1 Sq.mts. ( 130 Sq.ft. )
Shop13.48 Sq.mts. ( 145 Sq.ft. )
Shop13.93 Sq.mts. ( 150 Sq.ft. )
2 BHK41 Sq.mts. ( 441 Sq.ft. )
Shop12.08 Sq.mts. ( 130 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shelter Dreamlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Na
Buildings / Wings in Shelter Dream
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shelter Dream by Rabbani Shamsuddin Khanlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

21528 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

136 apartments in total
Total
136
Booked
44
Available
92

Saleable Area Statistics (Sq. ft.)

42379 Total
Total
42379
Booked
11447
Available
30932
Total 136 apartments in project. 44 apartments booked. 32% apartments booked.
Total 42379 Sq.ft. saleable area. 11447 saleable area booked.
27% area booked.

Shelter Dream A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shelter Dream A WingDec 20277000073
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31 Sq.mts. ( 334 Sq.ft. )20
5 Booked25% Booked
25% Booked
2 BHK41.8 Sq.mts. ( 450 Sq.ft. )7
5 Booked71% Booked
71% Booked
Shop9.29 Sq.mts. ( 100 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop12.1 Sq.mts. ( 130 Sq.ft. )4
4 Booked100% Booked
100% Booked
Shop13.48 Sq.mts. ( 145 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop13.93 Sq.mts. ( 150 Sq.ft. )1
1 Booked100% Booked
100% Booked
35 total apartments / 17 apartments booked. 48% apartments booked.
Work Description in Building Shelter Dream A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked

Shelter Dream B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shelter Dream B WingDec 20277000033
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31 Sq.mts. ( 334 Sq.ft. )19
2 BHK41 Sq.mts. ( 441 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK41.8 Sq.mts. ( 450 Sq.ft. )6
Shop9.29 Sq.mts. ( 100 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop12.1 Sq.mts. ( 130 Sq.ft. )4
4 Booked100% Booked
100% Booked
Shop13.48 Sq.mts. ( 145 Sq.ft. )1
None Booked0% Booked
0% Booked
33 total apartments / 9 apartments booked. 27% apartments booked.
Work Description in Building Shelter Dream B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked

Shelter Dream C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shelter Dream C WingDec 20277000003
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31 Sq.mts. ( 334 Sq.ft. )19
2 BHK41.8 Sq.mts. ( 450 Sq.ft. )7
Shop9.29 Sq.mts. ( 100 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop12.08 Sq.mts. ( 130 Sq.ft. )4
3 Booked75% Booked
75% Booked
Shop13.48 Sq.mts. ( 145 Sq.ft. )1
1 Booked100% Booked
100% Booked
33 total apartments / 7 apartments booked. 21% apartments booked.
Work Description in Building Shelter Dream C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked

Shelter Dream D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shelter Dream D WingDec 20277000031
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31 Sq.mts. ( 334 Sq.ft. )20
2 BHK41.8 Sq.mts. ( 450 Sq.ft. )7
4 Booked57% Booked
57% Booked
Shop9.29 Sq.mts. ( 100 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop12.08 Sq.mts. ( 130 Sq.ft. )4
2 Booked50% Booked
50% Booked
Shop13.48 Sq.mts. ( 145 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop13.93 Sq.mts. ( 150 Sq.ft. )1
1 Booked100% Booked
100% Booked
35 total apartments / 11 apartments booked. 31% apartments booked.
Work Description in Building Shelter Dream D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Rabbani Shamsuddin Khan
for Project
Shelter Dream
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation