Project overview

Sheetal Trimurti is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800028316. Sheetal Trimurti is located at 385. This is a New being developed by D.G.Land Developers Private Limited.

Sheetal Trimurti has 1 BHK & 2 BHK Apartments with carpet areas ranging from 342 to 480 Sq.ft. Carpet. The Project has total 18 of which 18 are currently available for sale.

Sheetal Trimurti is being developed on a total land area of 5382 Sq.ft. Sheetal Trimurti has 1 Wings / Towers Sheetal Trimurti

ProjectDeveloperLocationPossession
Mauli OmkarMauli Sai Developers Pvt Ltd701B/1/A To 701B/8/A, 701B/1A/1/1 And 701B/1A/1/1/9 To 3008-07-2023 00:00:00
Mauli PrideMauli Sai Developers Pvt Ltd407/1 To 3, 408, 413, 412, 407, 414, 409 410, 415, 414/1, 4, 416, 415/1 To 908-01-2023 00:00:00
Neelyog Virat -B WingNeelyog Construction Pvt Ltd482 To 485 489 To 509 And 51430-12-2025 00:00:00
Shah Arcade IiiShah Housecon Private Limited502 502 Pt And 502/301 To 388 510 And 510/1 To 5 512 513 513 /1 To 34 515 516 And 516/1 To 14 51730-07-2018 00:00:00
Rizvi CedarRizvi Estates & Hotels Pvt Ltd93, 82, 90, 80 Pt, 81 Pt30-12-2021 00:00:00
Sanjar Developers And BuildersSanjar Developers & BuildersCts 278A/1B31-12-2019 00:00:00
Neelyog Virat -A WingNeelyog Construction Pvt Ltd482 To 485 489 To 509 51430-12-2026 00:00:00
Sugra ParkBlossom DevelopersSurvey No 27301-01-2021 00:00:00
Sunrise Orlem 2B Phase 3Dhaval Housing Aop438B, Cts No 438A30-06-2021 00:00:00
Ambani ResidencyAmbani Corporation400097, Mumbai Suburban31-12-2020 00:00:00
Shree Sambhav Darshan ChsShree Sai Shraddha AssociatesMumbai Suburban20-06-2021 00:00:00
Maple HeightsBholasai Developers291 A Pt31-12-2018 00:00:00
Mauli DesireMauli Sai Developers Pvt Ltd78/1 To 331-01-2019 00:00:00
Sharda SahaniwasSumit Chetna Ventures88 Part31-03-2018 00:00:00
Grand EdificeUjjwala Satish Haware110 Pt And 146 Pt30-06-2021 00:00:00
Kishor NiwasRatna Premjibhai Gala380 And 38130-12-2023 00:00:00
Aarambh Wing C -DSatellite Developers Pvt Ltd17 Of Village Malad, 16A Pt, 16A/1 And 225-01-2023 00:00:00
Royal Crystal Wing BRoyal RealtorsMalad East31-12-2018 00:00:00
Keshav Shiv HeightsInventure Sejal Realtors Pvt. Ltd.422B, 422B 1 To 1531-03-2018 00:00:00
Sheetal HeightsToughcons Realtors Private LimitedCts 569 570 570 1 To 931-12-2019 00:00:00
Vinayak TowerKosmos Developer144, 144/1 To 1131-12-2019 00:00:00
Sea JewelSea Jewel Property Developers Llp320 / 1 To 16, 32030-12-2021 00:00:00
Malad Babel Chs LtdSiscorn DevelopersCts No 45931-12-2017 00:00:00
Aarambh Wing E - FSatellite Developers Pvt LtdCts 16A Pt, 16A/1 And 2, 1715-03-2023 00:00:00
Sethia Imperial AvenueSai Enterprises123A30-12-2023 00:00:00
Nahid HeightsM/S Nahid Enterprises595B30-12-2022 00:00:00
Noble HeightsNoble Infra Projects709 726 727 727 1 To 6 728 728 1 To 230-12-2019 00:00:00
Crystal PrideCrystal Construction Company401, 401/1 To 401/25, 402 Part31-12-2019 00:00:00
Sumit Garden GroveSumit Garden Grove Construction Llp374B/12 Part30-12-2021 00:00:00
Shiv Shakti ChslGlasswood Realty Private Limited22-A 22 A/1 To 22 A/531-12-2019 00:00:00
F Residences-MaladM/S Riddhi Siddhi ConstructionCts 118K Pt, Cts 118L Pt31-07-2022 00:00:00
Gaurav DiscoveryVidhi Relators400097, Mumbai Suburban31-12-2021 00:00:00
Kurar Sangeeta Aprtment Chs LtdL K Infracon Llp45530-03-2024 00:00:00
Pearl OasisBahist Enterprises Pvt Ltd136 Pt30-12-2024 00:00:00
Apna Desh Chs Ltd.Vasundhara Builders370/E/230-03-2023 00:00:00
Kanakia LevelsKanakia Spaces Realty Private LimitedSurvey No 288 Pt 503 Pt Corresponding Cts Nos Specified In Title Certificate Attach To This Form31-10-2019 00:00:00
Shiv RatnamNavkarmik Infra And Development Private Limited278A/6501-03-2025 00:00:00
Shah Business CentreShah Housecon Private Limited472B Pt 472B / 1 To 78 472B / 82 To 90 472 B /93 To 12231-12-2019 00:00:00
Neev GalaxyNeev Infrastructure Pvt. Ltd.49/E31-12-2018 00:00:00
Anant Nakshatra Tower 2M Construction Company290 Part 290 1 Part 291 A 1 Part31-12-2026 00:00:00
Kamgar Panch Ganga Sraphase 1 ChsproposedPayal J Shah115Pt 116 117Pt 561Pt 130Apt31-08-2018 00:00:00
Makarani Pada Phase 1K D Builders571, 572/169-264, 574/1-11, 575, 572/273-288, 572/293-295, 575/, 571/1-1930-03-2024 00:00:00
Redevelopment Of Sita Sadan - Rishab VillaM/S S.S. DevelopersMumbai Suburban, 40009731-07-2020 00:00:00
Sheetal BhavanD.G.Realty423 423 1 To 1401-06-2023 00:00:00
Redevelopment Of Malad Jay Amrat Co-Operative Housing Society-Rishab Jay AmratRishabraj Toughcons City Homes Private LimitedPlot Bearing No 7 And 8 Cts No 227/3 And 227/430-06-2021 00:00:00
Maharshi HeightsAiyannar Enterprises4030-12-2025 00:00:00
Alta Monte And SignetEra Realtors Private Limited811 A/7Pt 812 813 814 A/1 To A/4 821Pt 824Pt 825Pt 844Pt30-12-2024 00:00:00
Dindoshi Sai Sadan Chs LtdSanjay Bajranglal Agarwal106 10730-06-2021 00:00:00
Madhav RealityJayesh Hiralal Gothi823/A 823/1 And 818 Survey Number 28415-06-2022 00:00:00
Sanjay BuildingShreeji Realties Private Limited400097, Mumbai Suburban31-12-2020 00:00:00
Leela AashishLeela Creators400097, Mumbai Suburban31-12-2020 00:00:00
Neminath Apartment Sra Chs And Shree Siddhagiri Sra ChsSubhash Velji Chawda276, 276/1 To 2031-12-2019 00:00:00
Avighna ResidencyKonark Shakti Group Of Companies21A/7A31-12-2018 00:00:00
Adcon ResidencyAdcon Infrastructure169 1691-1031-12-2018 00:00:00
Rajdeep Chs LtdChinnapan Swamy Anthony274/531-12-2025 00:00:00
Vaishno Neelkanth ApartmentShree Vaishno Homes Pvt. Ltd.542/C31-12-2024 00:00:00
Anant Nakshatra Tower 1M Construction Company290 Part 290 1 Part 291 A 1 Part31-12-2026 00:00:00
Shiv ShubharambhNavkarmik Infra & Development Private Limited77001-03-2024 00:00:00
Sukoon Sra Chs Ltd-Wing-A. /Western Heights Cts 394-B&C-WingM V Q Developers394, 394/1 To 1230-06-2025 00:00:00
Rishabraj ClassicTriveni Developers40009730-04-2024 00:00:00
Ismail HeightsM/S Star DevelopersMumbai Suburban, 40009731-12-2021 00:00:00
Jawahar Milan ChsLandmark Corporation Pvt. Ltd.29E31-12-2018 00:00:00
Saroj Sadan ChslPritesh Damji Savla25, H 26H To 30H12-12-2018 00:00:00
Hava Mahal Chs LtdH Rishabraj Projects370C30-06-2023 00:00:00
Sheetal TrimurtiD.G.Land Developers Private Limited38501-12-2023 00:00:00
Aarambh Wing A-BSatellite Developers Pvt LtdCts 16A Pt, 16A/1 And 2, 1730-09-2024 00:00:00
Center Plaza Phase 1B V Enterprises40009731-12-2023 00:00:00
Ayesha HeightsUmair Construction748, 747A(Part), 747A/1 To 1625-12-2025 00:00:00
Fortune PlazaFortune Town Planner Llp4231-12-2026 00:00:00
Hive 97Amity ConstructionsCts No. 602, 602/1 To 228 Of Village Pahadi Goregaon East And Cts No. 392 Of Village Malad East31-12-2029 00:00:00
Shiv PalaceNavkarmik Infra & Development Private Limited76731-05-2027 00:00:00
Ghanwat AccordGhanwat Developers Pvt. Ltd790(A)31-12-2027 00:00:00
Bag-E-Noor ChslMozaic Homes (India) Llp597/A/1 (Pt.)31-03-2028 00:00:00
Project Details
  • Project:
    Sheetal Trimurti
  • Location:
  • 385
  • Const. Stage:
    New
  • Possession:
    01 Dec 2023
Developer Details

  • Developer:
    D.G.Land Developers Private Limited
  • Phone:
  • Address:
  • Sheetal Krupa
Project RERA Details
MAHA REARA No: P51800028316
Project Type Residential / Group Housing
RERA Project Status New
Architect Abhijit Udani
Funding Bank ICICI BANK LIMITED
Proposed Possession 01 Dec 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 18 Feb 2021
Last Retrived 26 Jul 2025
Sheetal Trimurti QR Code
Sheetal Trimurti
MahaRERA - P51800028316
Apartment Details & Configuration
TypeArea
1 BHK31.75 Sq.mts. ( 342 Sq.ft. )
1 BHK32.61 Sq.mts. ( 351 Sq.ft. )
1 BHK32.74 Sq.mts. ( 352 Sq.ft. )
1 BHK33.46 Sq.mts. ( 360 Sq.ft. )
2 BHK44.59 Sq.mts. ( 480 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sheetal Trimurtilast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Work In Progress
Energy management
Na
Fire Protection And Fire Safety Requirements
Work In Progress
Landscaping & Tree Planting
Work In Progress
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Work In Progress
Solid Waste Management And Disposal
As Per Swm Permission
Storm Water Drains
Work In Progress
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Work In Progress
Water Supply
Work In Progress
Buildings / Wings in Sheetal Trimurti
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sheetal Trimurti by D.G.Land Developers Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

5382 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

18 apartments in total
Total
18
Booked
0
Available
18

Saleable Area Statistics (Sq. ft.)

6822 Total
Total
6822
Booked
0
Available
6822
Total 18 apartments in project. 0 apartments booked. 0% apartments booked.
Total 6822 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Sheetal Trimurti

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sheetal TrimurtiJan 202310101007
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.75 Sq.mts. ( 342 Sq.ft. )5
None Booked0% Booked
0% Booked
1 BHK32.61 Sq.mts. ( 351 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK32.74 Sq.mts. ( 352 Sq.ft. )5
None Booked0% Booked
0% Booked
1 BHK33.46 Sq.mts. ( 360 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK44.59 Sq.mts. ( 480 Sq.ft. )4
None Booked0% Booked
0% Booked
18 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Sheetal TrimurtiCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
D.G.Land Developers Private Limited
for Project
Sheetal Trimurti
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation