Project overview

Shaswat Residency is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800008668. Shaswat Residency is located at 4702. This is a Ongoing being developed by Shaswat Realty.

Shaswat Residency has 1 BHK, 1 BPHK, 2 BHK, 3 bhk & 3 BHK Apartments with carpet areas ranging from 390 to 905 Sq.ft. Carpet. The Project has total 24 of which 9 are currently available for sale.

Shaswat Residency is being developed on a total land area of 6804 Sq.ft. Shaswat Residency has 1 Wings / Towers Shaswat Residency

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Shaswat Residency
  • Location:
  • 4702
  • Const. Stage:
    Ongoing
  • Possession:
    15 Apr 2018
Developer Details

  • Developer:
    Shaswat Realty
  • Phone:
  • Address:
  • Motipachan
Project RERA Details
MAHA REARA No: P51800008668
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Karani And Sanghoi Designers
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 15 Apr 2018
Revised Possession 15 Apr 2018
Extended Possession
Litigations No Litigations
Last Modified 19 Aug 2017
Last Retrived 26 Jul 2025
Shaswat Residency QR Code
Shaswat Residency
MahaRERA - P51800008668
Apartment Details & Configuration
TypeArea
1 BHK36.22 Sq.mts. ( 390 Sq.ft. )
1 BPHK45.03 Sq.mts. ( 485 Sq.ft. )
1 BPHK45.36 Sq.mts. ( 488 Sq.ft. )
2 BHK61.44 Sq.mts. ( 661 Sq.ft. )
2 BHK61.95 Sq.mts. ( 667 Sq.ft. )
2 BHK63.18 Sq.mts. ( 680 Sq.ft. )
2 BHK64.26 Sq.mts. ( 692 Sq.ft. )
2 BHK64.89 Sq.mts. ( 698 Sq.ft. )
3 bhk81.21 Sq.mts. ( 874 Sq.ft. )
3 BHK83.31 Sq.mts. ( 897 Sq.ft. )
3 BHK84.1 Sq.mts. ( 905 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shaswat Residencylast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electrical Room Only Will Be Provided Before Oc
Energy management
Na
Fire Protection And Fire Safety Requirements
Ff As Per Fire Dept Noc
Landscaping & Tree Planting
Tree Planting Only
Open Parking
1 Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Will Be Done Before Oc
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rwh Only Will Be Provided Before Oc
Water Supply
Mcgm Water Supply Will Be Provided Before Oc
Buildings / Wings in Shaswat Residency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shaswat Residency by Shaswat Realtylast updated on 26 Jul 2025 as per information obtained from MARA RERA.

6804 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

24 apartments in total
Total
24
Booked
15
Available
9

Saleable Area Statistics (Sq. ft.)

16795 Total
Total
16795
Booked
10159
Available
6635
Total 24 apartments in project. 15 apartments booked. 62% apartments booked.
Total 16795 Sq.ft. saleable area. 10159 saleable area booked.
60% area booked.

Shaswat Residency

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shaswat ResidencyJan 1900131010124
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.22 Sq.mts. ( 390 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BPHK45.03 Sq.mts. ( 485 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BPHK45.36 Sq.mts. ( 488 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK61.44 Sq.mts. ( 661 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK61.95 Sq.mts. ( 667 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK63.18 Sq.mts. ( 680 Sq.ft. )2
1 Booked50% Booked
50% Booked
2 BHK64.26 Sq.mts. ( 692 Sq.ft. )2
1 Booked50% Booked
50% Booked
2 BHK64.89 Sq.mts. ( 698 Sq.ft. )7
2 Booked28% Booked
28% Booked
3 bhk81.21 Sq.mts. ( 874 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK83.31 Sq.mts. ( 897 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK84.1 Sq.mts. ( 905 Sq.ft. )3
3 Booked100% Booked
100% Booked
24 total apartments / 15 apartments booked. 62% apartments booked.
Work Description in Building Shaswat ResidencyCompletion
Basement (if any)
work-in-progress50% done
50% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress44% done
44% Booked
Plinth
work-in-progress50% done
50% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress40% done
40% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress40% done
40% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress50% done
50% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Shaswat Realty
for Project
Shaswat Residency
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation