Project overview

Shanti Tower is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900033948. Shanti Tower is located at Anand Patil Marg. This is a New Project being developed by Shanti Prakash Realty &Amp; Infrastructure Llp.

Shanti Tower has 1 BHK & Multipurpose Room Apartments with carpet areas ranging from 344 to 399 Sq.ft. Carpet. The Project has total 75 of which 54 are currently available for sale.

Shanti Tower is being developed on a total land area of 10986 Sq.ft. out of which 1108 Sq.ft. i.e 10% is reserved for recreational purposes. Shanti Tower has 1 Wings / Towers Shanti Tower

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Shanti Tower
  • Location:
  • Anand Patil Marg
  • Const. Stage:
    New Project
  • Possession:
    29 Apr 2030
Developer Details

  • Developer:
    Shanti Prakash Realty &Amp; Infrastructure Llp
  • Phone:
  • Address:
  • B/9, Shankeshwar Darshan, Sheth Motisha Lane, Mazgaon Telephone Exchange, Mazgaon, 400010
Project RERA Details
MAHA REARA No: P51900033948
Project Type Residential
RERA Project Status New Project
Funding Bank Bank of Baroda
Proposed Possession 29 Apr 2030
Revised Possession
Extended Possession
Litigations Yes
Last Modified 21 Dec 2023
Last Retrived 28 Jul 2025
Shanti Tower QR Code
Shanti Tower
MahaRERA - P51900033948
Apartment Details & Configuration
TypeArea
1 BHK36.65 Sq.mts. ( 395 Sq.ft. )
1 BHK36.8 Sq.mts. ( 396 Sq.ft. )
1 BHK37.05 Sq.mts. ( 399 Sq.ft. )
Multipurpose Room31.98 Sq.mts. ( 344 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shanti Towerlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Mcgm Norms
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Mcgm Norms
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Mcgm Norms
Landscaping & Tree Planting
As Per Mcgm Norms
Open Parking
As Per Mcgm Norms
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Mcgm Norms
Solid Waste Management And Disposal
As Per Mcgm Norms
Storm Water Drains
As Per Mcgm Norms
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
As Per Mcgm Norms
Water Supply
As Per Mcgm Norms
Buildings / Wings in Shanti Tower
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shanti Tower by Shanti Prakash Realty &Amp; Infrastructure Llplast updated on 28 Jul 2025 as per information obtained from MARA RERA.

10986 Sq. ft.

Project Area

1108 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

75 apartments in total
Total
75
Booked
21
Available
54

Saleable Area Statistics (Sq. ft.)

29081 Total
Total
29081
Booked
8102
Available
20979
Total 75 apartments in project. 21 apartments booked. 28% apartments booked.
Total 29081 Sq.ft. saleable area. 8102 saleable area booked.
28% area booked.

Shanti Tower

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shanti TowerApr 203024111011
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.65 Sq.mts. ( 395 Sq.ft. )9
None Booked0% Booked
0% Booked
1 BHK36.8 Sq.mts. ( 396 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK37.05 Sq.mts. ( 399 Sq.ft. )42
16 Booked38% Booked
38% Booked
Multipurpose Room31.98 Sq.mts. ( 344 Sq.ft. )14
5 Booked35% Booked
35% Booked
75 total apartments / 21 apartments booked. 28% apartments booked.
Work Description in Building Shanti TowerCompletion
Excavation
work-in-progress80% done
80% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress20% done
20% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress39% done
39% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress40% done
40% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress80% done
80% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress70% done
70% Booked
Channel Partners
Channel Partners Registered by Developer
Shanti Prakash Realty &Amp; Infrastructure Llp
for Project
Shanti Tower
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation