Project overview

Shanti Gardens, Sector 5, Bldg. No.8 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700010577. Shanti Gardens, Sector 5, Bldg. No.8 is located at J4lorkh6s6voualrm7byhoodhvkrmticdm4svu6jd7chebn56+Kjk/G4eb6c1lia. This is a Ongoing being developed by Ramnagar Development Corporation.

Shanti Gardens, Sector 5, Bldg. No.8 has 1 BHK, 2 BHK & SHOP Apartments with carpet areas ranging from 121 to 567 Sq.ft. Carpet. The Project has total 60 of which 36 are currently available for sale.

Shanti Gardens, Sector 5, Bldg. No.8 is being developed on a total land area of 11754 Sq.ft. Shanti Gardens, Sector 5, Bldg. No.8 has 1 Wings / Towers Bldg 8 Sector 5

ProjectDeveloperLocationPossession
Shanti Gardens, Sector 5, Bldg. No.8Ramnagar Development CorporationJ4lorkh6s6voualrm7byhoodhvkrmticdm4svu6jd7chebn56+Kjk/G4eb6c1lia30-12-2022 00:00:00
Amisha Empire - Phase IAmisha AssociatesGsmyn+Zjm6awrhwp3guylw==31-12-2019 00:00:00
Poonam Estate Cl 2 Blg No 7 8 9Ravi DevelopmentsRi1pvpzdu5/Nlyjj+Dbeezfieulu/Drd6fhsxvresarqnjiaduay4zf6o3rdv2etmefdo+Eidijieca0a6j48mxzuhkdhlx2twz4zic8skqwsscvlsztc64xip1oun9b30-06-2019 00:00:00
Man OpusMan Global Ltd.Kdpfz1fcmtjsxdilibbyrr8na+4Ddbkcwmtgxsk7qenjnwcfyceezdp//2Uqjc0p0uylmwdnki0i7l9/Wjpw4tpjxxtxcqmlngoybacwcerxf/Yaf2ctlegsomjioek431-12-2018 00:00:00
Shree Shashwat Building No 19Shashwat DevelopersUz+34Diszsuqntk7gtf0cbn2ulzfxwzezuttexcrpewgxugt5h73gynkpmi0vdki31-12-2019 00:00:00
PlatinumSilver EnterprisesAbpwlgyfigior1huxez9m78odgq8ljwuiu0wcc5zcip+Iybwobnqnvzkziqqmr4131-12-2018 00:00:00
Shree HavenShree Housing Co8Qqzqp3m+Yc8nl7nimyd5d7j0ylu1ikqqmvvx+Fgga/Ab5fu8y/N+Cilttcieevckg3+Hjbdssymrscnpwww+A==30-12-2025 00:00:00
Mayfair PalmeiraMayfair Maru DevelopersG13lw5a+Wu4a+Q17vz2ayupxuxy96pmncleiafhvp6hruyvp/Dvnucz8q/Vhnxsnmmp1jiymbcv4ncbjrzo8nlv+M8jhik3w0sdnk6cz6d4=30-12-2028 00:00:00
Raj AkshayRaj AkshayBayxd3ef9f/0Wxrjzakvpacvebasgtfff3o6vpikzvq+Obkc9tjlhoz4zjiu4euehmcgucix+2Imb5y9wz+Sna==30-12-2025 00:00:00
SapphireJangid Builders Private LimitedNh3ttowbkhcsikjyzzzgca==31-12-2019 00:00:00
Magic Meera HeightsMagic Star DevelopersAfrj4pjde5gpxrjtg7ux3jmrqqlzku6aixvf9dfhuxm=30-12-2025 00:00:00
127 Raj Homes B And C WingRaj HomesWz7itp03h3ey2etowdlfparzfbhvkir4plwtgo94nu2fj2/Dajoz1u26yybk8k+V31-12-2026 00:00:00
Krishna PrestigeM/S. Arun Bhoomi CorporationLyzv3zezmyfoqrcuu0jezw==29-12-2022 00:00:00
IndrayaniJangid DevelopersFcjbwbnigblwdeltx94wu/9Hklmrucvyvq9h3xhf1ae=30-06-2019 00:00:00
Aasanjo AmberAasanjo Amber40110725-07-2018 00:00:00
AVIGHNA COMPLEX PHASE IAVIGHNAA INFRA BUILDCON LLPNew Survey No 16 Hissa No 1,3,430-06-2026 00:00:00
SAVALIYA RESIDENCYShree Savaliya Housing LLP/Old Survey No 475/, New Survey No 118/230-06-2025 00:00:00
Shweta HeightsShree Sai Associates4Tbghdcyeg64bttikqsns0r8khg3akkkriabrhk1yupxb9g3luqeogctmu6ggclu4znsvshzddhw69jnywdu6/6Vk7zxtuhgffbuf7t3l8k/9Iqffj2udn/Kfp74ufm331-03-2026 00:00:00
S3 SkygreensS3 Smart Spaces Private Limited6Ttmt7xjbumyfrtsvd3blvqlvzlyfldoocki3la8ayb4narhte3qwijfkyz2h2olvgdcwv5h7v6mvhudkotvwlt9xs9oyoyzslowzd0nz4gx2rbptqy9qty5jnqewpohtlcbni/Gbagu6seqhtg1eg==30-06-2028 00:00:00
Ganesh DarshanJ.V. RealtyOelyyq1k6gfhvcuk+Ye5vrzu1tblq9wlpjzhdiw8s0m+Hgxhhvur4mwdy62/4Uy030-07-2026 00:00:00
Poonam Estate Cl 2 Blg No 1 2 3Ravi DevelopmentsYcqmkede2xwqfdu4j16gmbhq56ryqcshdpfh6hchdw1g/Iewydlutq5a9+Oz+Uot3hnkt1xe9hda7clhte/1Ww==31-03-2018 00:00:00
Nida Amisha HeightsSai Krupa DevelopersM26hkx/Dljhdpszkrrupqsetnndkjlhkjyjvdzkt3lbda7ira3qrtxwda/Zk3dgtn5llm2vhu/Bhpmgphnev9a==01-07-2026 00:00:00
Sector 2A - Wing CEversmile Properties Private Limited7Vpeds5cx1yor8y9dkjwyjzhyaxctke2uopssifj3djxofo/587I2vsxxuc0tfrfasudesvvdnwf/Hoznzcf1g==30-06-2027 00:00:00
S3 SkyriseS3 Smart Spaces Private LimitedMjip1lf8a8t+Rnkuqwnwnaet6ds/Yndmfddfane/5Ahitn0xzvvsse1mpwfeeokumykhckbjijdzid+Aobndmd3wmlnwwrasxm+Nxq1fblf9t2zp89t3ode84k4h5vx6ttyhlw7/Xuig1peod/1Iqa==31-12-2027 00:00:00
Kasturi BlossomSiddhivinayak EnterpriseLhuvyvcz2qygcmczyfcr6i129xjcnnjy0ksbhyozeiozfqnr5gijswqdjhmtff9suvqlu2h98ebvqtuhmugc2d7z1bpwfxwcy7jemuzo8lk=31-12-2027 00:00:00
Avighna Complex Phase IiAvighnaa Infra Buildcon LlpJhyffdatjgnbtxtk7sw6m1oy1mccawp20jtqxmdpsdvnsafvmqyf4sxuj01hxqfv31-12-2029 00:00:00
Shree Shaswat Building No 15White Heaven Realty06Sfnwxlraxdnvl5uducjmxrz5rgeso1x56z7cuu4ckarpp+S7vzwp21+2Jmtsarhhlghmhkrlh3vmqmr2tyuki1uxvwdftcfjehr+A/6Qc9tjkndrfcdvgrqotncbnub9yz2cgd5oens2nkfs7yd3fzzvxnvzq3rdkjdsrr+Var0elypraff9uyuvqrsbt2ji6ley9dn0s+Hcsdkh6+Hq==30-12-2023 00:00:00
IMPERIAL HEIGHTS PHASE II - C WINGAKSHAR SHANTI REALTORS PRIVATE LIMITED12/130-12-2026 00:00:00
DELTA GARDENDelta ventureCts1838 1840 1883 To 1886 1968 To 1971 2039 To 2044 2100 To 21032157 2158 2221 2222 2294 2295 174131-07-2018 00:00:00
Sanghvi S3 Ecocity WoodsSanghvi Premises Pvt. Ltd.S No 102/26 And 88/13 Village Mire And S No 11/1/2 Village Mahajanwadi30-12-2023 00:00:00
Heena PresidencyNeha Developers72/2, 73/1,2,3,4, 74/1,2, 75/130-12-2024 00:00:00
Skyline-IiUnique Shanti Neminath Developers LlpKzlixissh/Wlto17wslpramnrfluuk2uswtmozhx2kityw1eoqqtwkwoj3sxmh2bq9cynwih86vkcl0s/Ezluiuahi+Hhpzexypqcdhpsyg=30-06-2018 00:00:00
Shrushti Nirman IiJay Bharati Realty401106, Thane31-12-2018 00:00:00
Sheetal DharaM/s. J. K. AssociatesSurvey No. 733 /Part (Old), 124/Part (New), Plot No. 12131-12-2026 00:00:00
VITTHAL HEIGHTSBHOIR DEVELOPERSOld Sno 130, New Sno 6, Hissa No 831-12-2027 00:00:00
RAJ ULTIMATE E-WINGS D U TRADELINK PVT LTD.Old S No 127, New S No 49 Hissa No 1931-12-2026 00:00:00
Shree Shashwat Building No. 22Raj Infraempire Private Limited2Euewktlkjrvjg/Ys5x8q9ianzgsndqcqjjkw+9Txwhtnqpncwxit+N5cyqj0vwj6zvhjtrgr5olllzcxhr3c72bstaoprwz+24Xbbb1tys=14-01-2027 00:00:00
Sheetal UtsavDgs Township Pvt Ltd31-12-2030 00:00:00
Skyline-Ii-MhadaUnique Shanti Neminath Developers LlpLge5t5jt3twuk3x3rkkmt5gabzj2brcpzjz8lnv2/Ikklbrahtfe9r3xrsip5z9ocrwkequpzoq1yhkrk700ta==31-03-2018 00:00:00
127 Raj Homes D WingRaj HomesXebohvwp3s1rx/Tzcs5h+Rjmvpp9wlljkfe0g8u8harepgbrb0lyhzdg4hd5v9io31-12-2026 00:00:00
Surya Heritage AArun Construction CoSksixbxgokev5sdova7di0mtrf6abtnjbizc/E15uxk=31-12-2026 00:00:00
Sanghvi S3 Ecocity OrchidSanghvi Premises Pvt LtdS No 102/26 And 88/13 Village Mire And S No 11/1/2 Village Mahajanwadi30-12-2023 00:00:00
TowncrestShree Sai Enterprises31-12-2029 00:00:00
Project Details
  • Project:
    Shanti Gardens, Sector 5, Bldg. No.8
  • Location:
  • J4lorkh6s6voualrm7byhoodhvkrmticdm4svu6jd7chebn56+Kjk/G4eb6c1lia
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    Ramnagar Development Corporation
  • Phone:
  • Address:
  • Embassy Centre
Project RERA Details
MAHA REARA No: P51700010577
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Avinash Mhatre And Associates
Funding Bank
Proposed Possession 30 Dec 2022
Revised Possession 30 Dec 2022
Extended Possession
Litigations No Litigations
Last Modified 03 Oct 2017
Last Retrived 13 Feb 2026
Shanti Gardens, Sector 5, Bldg. No.8 QR Code
Shanti Gardens, Sector 5, Bldg. No.8
MahaRERA - P51700010577
Apartment Details & Configuration
TypeArea
1 BHK33.44 Sq.mts. ( 360 Sq.ft. )
1 BHK35.18 Sq.mts. ( 379 Sq.ft. )
1 BHK35.53 Sq.mts. ( 382 Sq.ft. )
1 BHK35.66 Sq.mts. ( 384 Sq.ft. )
1 BHK36.78 Sq.mts. ( 396 Sq.ft. )
2 BHK52.68 Sq.mts. ( 567 Sq.ft. )
SHOP11.25 Sq.mts. ( 121 Sq.ft. )
SHOP13.33 Sq.mts. ( 143 Sq.ft. )
SHOP14.5 Sq.mts. ( 156 Sq.ft. )
SHOP15.25 Sq.mts. ( 164 Sq.ft. )
SHOP17.98 Sq.mts. ( 194 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shanti Gardens, Sector 5, Bldg. No.8last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Part Of Layout For All Bldgs Not Exclusive
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management100% completed
95% Complete
Solar Water Heating System
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
Landscaping & Tree Planting100% completed
95% Complete
Part Of Layout For All Bldgs Not Exclusive
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Septic Tank Completed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Provided In Layout
Street Lighting100% completed
95% Complete
Part Of Layout For All Bldgs Not Exclusive
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Rain Water Harvesting
Water Supply50% completed
50% Complete
Mbmc
Buildings / Wings in Shanti Gardens, Sector 5, Bldg. No.8
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shanti Gardens, Sector 5, Bldg. No.8 by Ramnagar Development Corporationlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

11754 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

60 apartments in total
Total
60
Booked
24
Available
36

Saleable Area Statistics (Sq. ft.)

22927 Total
Total
22927
Booked
8201
Available
14726
Total 60 apartments in project. 24 apartments booked. 40% apartments booked.
Total 22927 Sq.ft. saleable area. 8201 saleable area booked.
36% area booked.

Bldg 8 Sector 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg 8 Sector 5Dec 2021101010011
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.44 Sq.mts. ( 360 Sq.ft. )9
1 BHK35.18 Sq.mts. ( 379 Sq.ft. )9
1 BHK35.53 Sq.mts. ( 382 Sq.ft. )8
3 Booked37% Booked
37% Booked
1 BHK35.66 Sq.mts. ( 384 Sq.ft. )9
4 Booked44% Booked
44% Booked
1 BHK36.78 Sq.mts. ( 396 Sq.ft. )9
5 Booked55% Booked
55% Booked
2 BHK52.68 Sq.mts. ( 567 Sq.ft. )9
3 Booked33% Booked
33% Booked
SHOP11.25 Sq.mts. ( 121 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP13.33 Sq.mts. ( 143 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP14.5 Sq.mts. ( 156 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP15.25 Sq.mts. ( 164 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP17.98 Sq.mts. ( 194 Sq.ft. )1
1 Booked100% Booked
100% Booked
60 total apartments / 24 apartments booked. 40% apartments booked.
Work Description in Building Bldg 8 Sector 5Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress95% done
95% Booked
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Ramnagar Development Corporation
for Project
Shanti Gardens, Sector 5, Bldg. No.8
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation