Project overview

Shanti Garden is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700007823. Shanti Garden is located at Survey No 6/1/53. This is a Ongoing being developed by Kamya Enterprises.

Shanti Garden has 1 BHK & 2 BHK Apartments with carpet areas ranging from 406 to 563 Sq.ft. Carpet. The Project has total 151 of which 30 are currently available for sale.

Shanti Garden is being developed on a total land area of 63543 Sq.ft. Shanti Garden has 5 Wings / Towers Shanti Garden A Wing,Shanti Garden B Wing,Shanti Garden C Wing,Shanti Garden D Wing,Shanti Garden E Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Shanti Garden
  • Location:
  • Survey No 6/1/53
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2021
Developer Details

  • Developer:
    Kamya Enterprises
  • Phone:
  • Address:
  • Sunita Apartment
Project RERA Details
MAHA REARA No: P51700007823
Project Type Others
RERA Project Status Ongoing
Architect Mrs Nailah Iqbal Mukadam
Funding Bank BANK OF BARODA
Proposed Possession 30 Dec 2021
Revised Possession 30 Dec 2021
Extended Possession
Litigations No Litigations
Last Modified 16 Apr 2019
Last Retrived 26 Jul 2025
Shanti Garden QR Code
Shanti Garden
MahaRERA - P51700007823
Apartment Details & Configuration
TypeArea
1 BHK31.14 Sq.mts. ( 335 Sq.ft. )
1 BHK31.27 Sq.mts. ( 337 Sq.ft. )
1 BHK38.53 Sq.mts. ( 415 Sq.ft. )
1 BHK39.11 Sq.mts. ( 421 Sq.ft. )
1 BHK40 Sq.mts. ( 431 Sq.ft. )
1 BHK40.12 Sq.mts. ( 432 Sq.ft. )
1 BHK40.43 Sq.mts. ( 435 Sq.ft. )
2 BHK45.88 Sq.mts. ( 494 Sq.ft. )
2 BHK46.84 Sq.mts. ( 504 Sq.ft. )
2 BHK47.21 Sq.mts. ( 508 Sq.ft. )
2 BHK47.32 Sq.mts. ( 509 Sq.ft. )
3 BHK56.96 Sq.mts. ( 613 Sq.ft. )
3 BHK57.1 Sq.mts. ( 615 Sq.ft. )
1 BHK37.7 Sq.mts. ( 406 Sq.ft. )
2 BHK52.26 Sq.mts. ( 563 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shanti Gardenlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Before Obtaining Oc
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Before Obtaining Oc
Energy management
Na
Fire Protection And Fire Safety Requirements
Before Obtaining Oc
Landscaping & Tree Planting
Na
Open Parking
Before Obtaining Oc
Sewerage (Chamber, Lines, Septic Tank , STP)
Before Obtaining Oc
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Before Obtaining Oc
Water Supply
Before Obtaining Oc
Buildings / Wings in Shanti Garden
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shanti Garden by Kamya Enterpriseslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

63543 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

151 apartments in total
Total
151
Booked
121
Available
30

Saleable Area Statistics (Sq. ft.)

70907 Total
Total
70907
Booked
57313
Available
13594
Total 151 apartments in project. 121 apartments booked. 80% apartments booked.
Total 70907 Sq.ft. saleable area. 57313 saleable area booked.
81% area booked.

Shanti Garden A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shanti Garden A WingDec 20201110160516
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.14 Sq.mts. ( 335 Sq.ft. )9
7 Booked77% Booked
77% Booked
1 BHK31.27 Sq.mts. ( 337 Sq.ft. )10
10 Booked100% Booked
100% Booked
1 BHK38.53 Sq.mts. ( 415 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK39.11 Sq.mts. ( 421 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK40 Sq.mts. ( 431 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK40.12 Sq.mts. ( 432 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK40.43 Sq.mts. ( 435 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK45.88 Sq.mts. ( 494 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK46.84 Sq.mts. ( 504 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK47.21 Sq.mts. ( 508 Sq.ft. )3
2 Booked66% Booked
66% Booked
2 BHK47.32 Sq.mts. ( 509 Sq.ft. )3
2 Booked66% Booked
66% Booked
3 BHK56.96 Sq.mts. ( 613 Sq.ft. )3
3 Booked100% Booked
100% Booked
3 BHK57.1 Sq.mts. ( 615 Sq.ft. )3
2 Booked66% Booked
66% Booked
39 total apartments / 31 apartments booked. 79% apartments booked.
Work Description in Building Shanti Garden A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Shanti Garden B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shanti Garden B WingDec 2020810160516
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.7 Sq.mts. ( 406 Sq.ft. )14
13 Booked92% Booked
92% Booked
2 BHK52.26 Sq.mts. ( 563 Sq.ft. )14
12 Booked85% Booked
85% Booked
28 total apartments / 25 apartments booked. 89% apartments booked.
Work Description in Building Shanti Garden B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Shanti Garden C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shanti Garden C WingJan 1900810160516
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.7 Sq.mts. ( 406 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHK52.26 Sq.mts. ( 563 Sq.ft. )14
12 Booked85% Booked
85% Booked
28 total apartments / 26 apartments booked. 92% apartments booked.
Work Description in Building Shanti Garden C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Shanti Garden D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shanti Garden D WingJan 1900810160516
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.7 Sq.mts. ( 406 Sq.ft. )14
8 Booked57% Booked
57% Booked
2 BHK52.26 Sq.mts. ( 563 Sq.ft. )14
11 Booked78% Booked
78% Booked
28 total apartments / 19 apartments booked. 67% apartments booked.
Work Description in Building Shanti Garden D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Shanti Garden E Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shanti Garden E WingJan 1900810160516
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.7 Sq.mts. ( 406 Sq.ft. )14
6 Booked42% Booked
42% Booked
2 BHK52.26 Sq.mts. ( 563 Sq.ft. )14
14 Booked100% Booked
100% Booked
28 total apartments / 20 apartments booked. 71% apartments booked.
Work Description in Building Shanti Garden E WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Kamya Enterprises
for Project
Shanti Garden
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation