Project overview

Shankheshwar Crystal Phase 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700024228. Shankheshwar Crystal Phase 2 is located at Survey No 6/2 And Survey No 73 Hissa No 5/2/1. This is a New being developed by Shankheshwar Kreaters.

Shankheshwar Crystal Phase 2 has 1 BHK & 2 BHK Apartments with carpet areas ranging from 394 to 592 Sq.ft. Carpet. The Project has total 157 of which 102 are currently available for sale.

Shankheshwar Crystal Phase 2 is being developed on a total land area of 46167 Sq.ft. out of which 21087 Sq.ft. i.e 46% is reserved for recreational purposes. Shankheshwar Crystal Phase 2 has 3 Wings / Towers Bldg N0 1 Shankheshwar Crystal Phase 2,Bldg No 2 Shankheshwar Crystal Phase 2,Bldg No 6 Mhada

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Shankheshwar Crystal Phase 2
  • Location:
  • Survey No 6/2 And Survey No 73 Hissa No 5/2/1
  • Const. Stage:
    New
  • Possession:
    30 Dec 2024
Developer Details

  • Developer:
    Shankheshwar Kreaters
  • Phone:
  • Address:
  • Aum Supreme Building
Project RERA Details
MAHA REARA No: P51700024228
Project Type Residential / Group Housing
RERA Project Status New
Architect Arc Anil R Nirgude
Funding Bank CENTRAL BANK OF INDIA
Proposed Possession 30 Dec 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 27 Jan 2020
Last Retrived 26 Jul 2025
Shankheshwar Crystal Phase 2 QR Code
Shankheshwar Crystal Phase 2
MahaRERA - P51700024228
Apartment Details & Configuration
TypeArea
1 BHK40.21 Sq.mts. ( 433 Sq.ft. )
1 BHK28.86 Sq.mts. ( 311 Sq.ft. )
1 BHK30.79 Sq.mts. ( 331 Sq.ft. )
1 BHK30.86 Sq.mts. ( 332 Sq.ft. )
2 BHK36.38 Sq.mts. ( 392 Sq.ft. )
1 BHK30.97 Sq.mts. ( 333 Sq.ft. )
2 BHK42.34 Sq.mts. ( 456 Sq.ft. )
1 BHK36.6 Sq.mts. ( 394 Sq.ft. )
1 BHK37.04 Sq.mts. ( 399 Sq.ft. )
2 BHK54.96 Sq.mts. ( 592 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shankheshwar Crystal Phase 2last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
As Per Approved Kdmc Plan
CLUB HOUSE100% completed
95% Complete
Excluding Bldg No 6 Mhada
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Before O.C
Energy management100% completed
95% Complete
Solar Panel For Hot Water
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Kdmc Norms
Landscaping & Tree Planting100% completed
95% Complete
As Per Approved Kdmc Plan
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
As Per Approved Kdmc Plan
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting100% completed
95% Complete
Completed
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Rain Water Harvesting
Water Supply100% completed
95% Complete
As Per Kdmc Norms
Buildings / Wings in Shankheshwar Crystal Phase 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shankheshwar Crystal Phase 2 by Shankheshwar Kreaterslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

46167 Sq. ft.

Project Area

21087 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

157 apartments in total
Total
157
Booked
55
Available
102

Saleable Area Statistics (Sq. ft.)

59120 Total
Total
59120
Booked
19948
Available
39171
Total 157 apartments in project. 55 apartments booked. 35% apartments booked.
Total 59120 Sq.ft. saleable area. 19948 saleable area booked.
34% area booked.

Bldg N0 1 Shankheshwar Crystal Phase 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg N0 1 Shankheshwar Crystal Phase 2Dec 20235101008
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.21 Sq.mts. ( 433 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK28.86 Sq.mts. ( 311 Sq.ft. )12
12 Booked100% Booked
100% Booked
1 BHK30.79 Sq.mts. ( 331 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK30.86 Sq.mts. ( 332 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK36.38 Sq.mts. ( 392 Sq.ft. )4
3 Booked75% Booked
75% Booked
19 total apartments / 16 apartments booked. 84% apartments booked.
Work Description in Building Bldg N0 1 Shankheshwar Crystal Phase 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Bldg No 2 Shankheshwar Crystal Phase 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 2 Shankheshwar Crystal Phase 2Dec 2023131010020
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.97 Sq.mts. ( 333 Sq.ft. )72
25 Booked34% Booked
34% Booked
2 BHK42.34 Sq.mts. ( 456 Sq.ft. )24
14 Booked58% Booked
58% Booked
96 total apartments / 39 apartments booked. 40% apartments booked.
Work Description in Building Bldg No 2 Shankheshwar Crystal Phase 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Bldg No 6 Mhada

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 6 MhadaDec 202371010015
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.6 Sq.mts. ( 394 Sq.ft. )24
None Booked0% Booked
0% Booked
1 BHK37.04 Sq.mts. ( 399 Sq.ft. )12
None Booked0% Booked
0% Booked
2 BHK54.96 Sq.mts. ( 592 Sq.ft. )6
None Booked0% Booked
0% Booked
42 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 6 MhadaCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Shankheshwar Kreaters
for Project
Shankheshwar Crystal Phase 2
last updated on 26 Jul 2025 as per information obtained from MARA RERA.