Project overview
Seven Square Avenue is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700020490. Seven Square Avenue is located at Thane. This is a New Project being developed by M/S Shubh Realty.
Seven Square Avenue has 1 BHK & 2 BHK Apartments with carpet areas ranging from 469 to 685 Sq.ft. Carpet. The Project has total 324 of which 324 are currently available for sale.
Seven Square Avenue is being developed on a total land area of 92980 Sq.ft. out of which 13947 Sq.ft. i.e 15% is reserved for recreational purposes. Seven Square Avenue has 3 Wings / Towers Building 1,Building 2,Building 3
| Project | Developer | Location | Possession |
-
Project:
Seven Square Avenue
-
Location:
-
Thane
-
Const. Stage:
New Project
-
Possession:
30 Mar 2025
-
Developer:
M/S Shubh Realty
-
Phone:
-
Address:
-
A-63, 101 Sector No 1, Shanti Nagar, Near Railway Satation, Mira Road East, 401107
| MAHA REARA No: |
P51700020490 |
| Project Type |
Others |
| RERA Project Status |
New Project |
| Funding Bank |
Corporation Bank |
| Proposed Possession |
30 Mar 2025 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
06 Feb 2024 |
| Last Retrived |
28 Jul 2025 |
Seven Square Avenue QR Code
Seven Square Avenue
MahaRERA - P51700020490
| Type | Area |
| 1 BHK | 43.54 Sq.mts. ( 469 Sq.ft. ) |
| 2 BHK | 60.93 Sq.mts. ( 656 Sq.ft. ) |
| 2 BHK | 63.27 Sq.mts. ( 681 Sq.ft. ) |
| 2 BHK | 63.63 Sq.mts. ( 685 Sq.ft. ) |
| Shop | 15.83 Sq.mts. ( 170 Sq.ft. ) |
| Shop | 18.99 Sq.mts. ( 204 Sq.ft. ) |
| Shop | 20.31 Sq.mts. ( 219 Sq.ft. ) |
| Shop | 27.56 Sq.mts. ( 297 Sq.ft. ) |
| Shop | 28.9 Sq.mts. ( 311 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Seven Square Avenuelast updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Shall Be Completed On Or Before Possession |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Sub Stn No Receiving Stn |
|
|
|
Solar Wh |
Fire Protection And Fire Safety
Requirements
|
|
Shall Be Completed On Or Before Possession |
Landscaping & Tree Planting
|
|
Shall Be Completed On Or Before Possession |
|
|
|
Will Be Available |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Stp |
Solid Waste Management And Disposal
|
|
Shall Be Completed On Or Before Possession |
|
|
|
Shall Be Completed On Or Before Possession |
|
|
|
Na |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Shall Be Completed On Or Before Possession |
Water Conservation, Rain water Harvesting
|
|
Shall Be Completed On Or Before Possession |
|
|
|
By Mbmc After Oc |
Buildings / Wings in Seven Square Avenue
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Seven Square Avenue by M/S Shubh Realtylast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
324
apartments in total
Saleable Area Statistics (Sq. ft.)
183285
Total
Total 324 apartments in project. 0 apartments booked. 0% apartments booked.
Total 183285 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building 1 | Mar 2024 | 17 | 1 | 0 | 1 | 2 | 114 | 34 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 43.54 Sq.mts. ( 469 Sq.ft. ) | 30 | |
| 2 BHK | 60.93 Sq.mts. ( 656 Sq.ft. ) | 16 | |
| 2 BHK | 63.27 Sq.mts. ( 681 Sq.ft. ) | 33 | |
| 2 BHK | 63.63 Sq.mts. ( 685 Sq.ft. ) | 17 | |
| Shop | 15.83 Sq.mts. ( 170 Sq.ft. ) | 4 | |
| Shop | 18.99 Sq.mts. ( 204 Sq.ft. ) | 1 | |
| Shop | 20.31 Sq.mts. ( 219 Sq.ft. ) | 12 | |
| Shop | 27.56 Sq.mts. ( 297 Sq.ft. ) | 1 | |
| Shop | 28.9 Sq.mts. ( 311 Sq.ft. ) | 1 | |
115 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Building 1 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building 2 | Mar 2024 | 17 | 1 | 0 | 1 | 2 | 115 | 34 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 43.54 Sq.mts. ( 469 Sq.ft. ) | 30 | |
| 2 BHK | 60.93 Sq.mts. ( 656 Sq.ft. ) | 16 | |
| 2 BHK | 63.27 Sq.mts. ( 681 Sq.ft. ) | 33 | |
| 2 BHK | 63.63 Sq.mts. ( 685 Sq.ft. ) | 17 | |
| Shop | 15.83 Sq.mts. ( 170 Sq.ft. ) | 4 | |
| Shop | 18.99 Sq.mts. ( 204 Sq.ft. ) | 1 | |
| Shop | 20.31 Sq.mts. ( 219 Sq.ft. ) | 12 | |
| Shop | 27.56 Sq.mts. ( 297 Sq.ft. ) | 1 | |
| Shop | 28.9 Sq.mts. ( 311 Sq.ft. ) | 1 | |
115 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Building 2 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building 3 | Mar 2024 | 16 | 1 | 0 | 1 | 2 | 115 | 27 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 43.54 Sq.mts. ( 469 Sq.ft. ) | 30 | |
| 2 BHK | 63.27 Sq.mts. ( 681 Sq.ft. ) | 48 | |
| 2 BHK | 63.63 Sq.mts. ( 685 Sq.ft. ) | 16 | |
94 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Building 3 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
M/S Shubh Realty
for Project
Seven Square Avenue
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |