Project overview

Serein Phase 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700000295. Serein Phase 1 is located at 280/2B/2, 281/2A/1A , 288/2D/1B. This is a Ongoing being developed by Ardent Properties Private Limited.

Serein Phase 1 has 1 BHKAS, 1 BHKBL & 2 BHKES Apartments with carpet areas ranging from 408 to 579 Sq.ft. Carpet. The Project has total 621 of which 7 are currently available for sale.

Serein Phase 1 is being developed on a total land area of 261759 Sq.ft. out of which 34723 Sq.ft. i.e 13% is reserved for recreational purposes. Serein Phase 1 has 3 Wings / Towers Tower 2,Tower1,Tower4

ProjectDeveloperLocationPossession
Serein Phase 1Ardent Properties Private Limited280/2B/2, 281/2A/1A , 288/2D/1B30-09-2022 00:00:00
Courtyard - OrnellaCourtyard Real Estate Private Limited281/2A/1B, 283/1, 288/2D/1D30-05-2023 00:00:00
Courtyard - OnyxCourtyard Real Estate Private Limited281/2A/1B, 283/1, 288/2D/1D30-05-2023 00:00:00
Courtyard - FlorenceCourtyard Real Estate Private Limited281/2A/1B, 283/1, 288/2D/1D30-12-2021 00:00:00
Stella Grand CentralFortune Infracreators Private Limited206/1 Pt And 229/2 Pt30-12-2026 00:00:00
Maithili PrideMaithili Kalpvruksh Private Limited208 Hissa No 7,831-12-2019 00:00:00
Deepmala Chs LtdS. D. Bhalerao Associates211, 21230-12-2022 00:00:00
Elito Grand CentralFortune Infracreators Private Limited207 Part And 20830-12-2026 00:00:00
Cosmos HorizonConcorde DevelopersS No 192 2A 192 2B 193 2B 194 3B31-12-2018 00:00:00
Puneet Kanchanganga Phase 2 Floor 26 To Floor 28Puneet Developers211 Hissa No 531-12-2018 00:00:00
Conwood EnclaveConwood Realty Private LimitedSr No. 166 To 173Ps 282 Part To 287 And S No 304 To 306 Part30-12-2021 00:00:00
Shreesandesh HeightsAditya EnterprisesSurvey No. 206 And Survey No. 20930-12-2023 00:00:00
Ashar Edge Wing A Phase IiMs Ashar VenturesS.No. 342 Hissa No 4 Part Village Majiwade, Thane 40061030-10-2023 00:00:00
Ashar Edge Wing B Phase IiiMs Ashar VenturesS No 342 Hissa No 4 Pt Village Majiwade Thane West 40061030-10-2023 00:00:00
Ashar Edge Galleria- Phase IMs Ashar VenturesS.No. 342 Hissa No 4 Part, Village Majiwade, Thane-400 61030-10-2023 00:00:00
Raunak ResidencyUnnathi Estates186 Pt 364 Pt30-06-2024 00:00:00
Puneet Kanchanganga Phase One Floor 0 To Floor 25Puneet Developers211 Hissa No 531-12-2018 00:00:00
Shree Siddhivinayak TowerEkdant Constructions And Developers Private Limited206/8 Pt, 207 Pt And 208/8 Pt30-12-2020 00:00:00
Raunak SereneRaunak Corporation199/3Pt,199/4Pt,199/6Pt31-12-2028 00:00:00
Mahavir Spring -Daffodils-P3Vinayak DevelopersS No 280/4/1,415/1/430-12-2027 00:00:00
Courtyard - Asteria ACourtyard Real Estate Private Limited281/2A/1B, 281/2A/2, 281/2A/3, 283/1, 283/231-12-2027 00:00:00
AvesaJagdale Infrastructure Pvt. Ltd.50602-10-2026 00:00:00
Rex ResidencyEkdanta Developers Private Limited186/3 (Part) ,186/4 (Part) And 187 (Part)31-12-2028 00:00:00
Cosmos ParadiseCosmos Prime Projects Ltd401501, Palghar31-12-2017 00:00:00
Ten X Era Raymond Realty Tower BRaymond Limited83/1 121 Part30-01-2029 00:00:00
Serein Phase IiArdent Properties Private Limited280/2B/2A, 280/2B/2B, 280/2B/2C, 281/2A/1A/131-05-2027 00:00:00
Courtyard - Asteria BCourtyard Real Estate Private Limited281/2A/1B, 281/2A/2, 281/2A/3, 283/131-12-2027 00:00:00
Courtyard - Asteria CCourtyard Real Estate Private Limited281/2A/1B, 281/2A/2, 281/2A/3, 283/131-12-2027 00:00:00
Project Details
  • Project:
    Serein Phase 1
  • Location:
  • 280/2B/2, 281/2A/1A , 288/2D/1B
  • Const. Stage:
    Ongoing
  • Possession:
    30 Sep 2022
Developer Details

  • Developer:
    Ardent Properties Private Limited
  • Phone:
  • Address:
  • Voltas Premises
Project RERA Details
MAHA REARA No: P51700000295
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Edifice Consultant Private Limited
Funding Bank IDBI BANK
Proposed Possession 30 Sep 2022
Revised Possession 30 Sep 2022
Extended Possession 31 Mar 2023
Litigations No Litigations
Last Modified 29 Sep 2022
Last Retrived 26 Jul 2025
Serein Phase 1 QR Code
Serein Phase 1
MahaRERA - P51700000295
Apartment Details & Configuration
TypeArea
2 BHK68.43 Sq.mts. ( 737 Sq.ft. )
2 BHKC2L68.32 Sq.mts. ( 735 Sq.ft. )
2 BHKC3L67.26 Sq.mts. ( 724 Sq.ft. )
3 BHKDL91.53 Sq.mts. ( 985 Sq.ft. )
3 BHKE1L86.39 Sq.mts. ( 930 Sq.ft. )
3 BHKE2L86.29 Sq.mts. ( 929 Sq.ft. )
3 BHKE2LT285.54 Sq.mts. ( 921 Sq.ft. )
3 BHKE3L87.64 Sq.mts. ( 943 Sq.ft. )
3 BHKE3LT286.78 Sq.mts. ( 934 Sq.ft. )
3 BHKE4L85.04 Sq.mts. ( 915 Sq.ft. )
DUPLEXT2A144.85 Sq.mts. ( 1559 Sq.ft. )
DUPLEXT2A1146.1 Sq.mts. ( 1573 Sq.ft. )
DUPLEXT2B148.96 Sq.mts. ( 1603 Sq.ft. )
2 BHKA1S60.47 Sq.mts. ( 651 Sq.ft. )
2 BHKA2S66.06 Sq.mts. ( 711 Sq.ft. )
2 BHKA3S63.99 Sq.mts. ( 689 Sq.ft. )
2 BHKA4S62.1 Sq.mts. ( 668 Sq.ft. )
2 BHKB1S65.98 Sq.mts. ( 710 Sq.ft. )
2 BHKC1S59.02 Sq.mts. ( 635 Sq.ft. )
3 BHKA1S83.28 Sq.mts. ( 896 Sq.ft. )
3 BHKA2S81.38 Sq.mts. ( 876 Sq.ft. )
3 BHKB1S81.31 Sq.mts. ( 875 Sq.ft. )
3 BHKB2S83.2 Sq.mts. ( 896 Sq.ft. )
3 BHKB2ST285.05 Sq.mts. ( 915 Sq.ft. )
3 BHKB3S85.27 Sq.mts. ( 918 Sq.ft. )
3 BHKC1S79.92 Sq.mts. ( 860 Sq.ft. )
3 BHKD1S85.2 Sq.mts. ( 917 Sq.ft. )
3 BHKD2ST284.97 Sq.mts. ( 915 Sq.ft. )
1 BHKAS41.49 Sq.mts. ( 447 Sq.ft. )
1 BHKBL37.86 Sq.mts. ( 408 Sq.ft. )
2 BHKES53.83 Sq.mts. ( 579 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Serein Phase 1last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
C
Community Buildings100% completed
95% Complete
Club House
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
C
Energy management100% completed
95% Complete
C
Fire Protection And Fire Safety Requirements100% completed
95% Complete
C
Landscaping & Tree Planting100% completed
95% Complete
C
Open Parking
C
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
C
Solid Waste Management And Disposal100% completed
95% Complete
C
Storm Water Drains100% completed
95% Complete
C
Street Lighting100% completed
95% Complete
C
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
C
Water Conservation, Rain water Harvesting100% completed
95% Complete
C
Water Supply100% completed
95% Complete
Domestic Water Supply Will Be From Tmc
Buildings / Wings in Serein Phase 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Serein Phase 1 by Ardent Properties Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

261759 Sq. ft.

Project Area

34723 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

621 apartments in total
Total
621
Booked
614
Available
7

Saleable Area Statistics (Sq. ft.)

416417 Total
Total
416417
Booked
411645
Available
4772
Total 621 apartments in project. 614 apartments booked. 98% apartments booked.
Total 416417 Sq.ft. saleable area. 411645 saleable area booked.
99% area booked.

Tower 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 2Sep 202233110103
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK68.43 Sq.mts. ( 737 Sq.ft. )10
10 Booked100% Booked
100% Booked
2 BHKC2L68.32 Sq.mts. ( 735 Sq.ft. )32
32 Booked100% Booked
100% Booked
2 BHKC3L67.26 Sq.mts. ( 724 Sq.ft. )10
8 Booked80% Booked
80% Booked
3 BHKDL91.53 Sq.mts. ( 985 Sq.ft. )20
20 Booked100% Booked
100% Booked
3 BHKE1L86.39 Sq.mts. ( 930 Sq.ft. )8
8 Booked100% Booked
100% Booked
3 BHKE2L86.29 Sq.mts. ( 929 Sq.ft. )4
4 Booked100% Booked
100% Booked
3 BHKE2LT285.54 Sq.mts. ( 921 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHKE3L87.64 Sq.mts. ( 943 Sq.ft. )6
6 Booked100% Booked
100% Booked
3 BHKE3LT286.78 Sq.mts. ( 934 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHKE4L85.04 Sq.mts. ( 915 Sq.ft. )2
2 Booked100% Booked
100% Booked
DUPLEXT2A144.85 Sq.mts. ( 1559 Sq.ft. )3
3 Booked100% Booked
100% Booked
DUPLEXT2A1146.1 Sq.mts. ( 1573 Sq.ft. )3
3 Booked100% Booked
100% Booked
DUPLEXT2B148.96 Sq.mts. ( 1603 Sq.ft. )6
6 Booked100% Booked
100% Booked
108 total apartments / 106 apartments booked. 98% apartments booked.
Work Description in Building Tower 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower1Sep 202228110103
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHKA1S60.47 Sq.mts. ( 651 Sq.ft. )56
56 Booked100% Booked
100% Booked
2 BHKA2S66.06 Sq.mts. ( 711 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHKA3S63.99 Sq.mts. ( 689 Sq.ft. )13
13 Booked100% Booked
100% Booked
2 BHKA4S62.1 Sq.mts. ( 668 Sq.ft. )13
12 Booked92% Booked
92% Booked
2 BHKB1S65.98 Sq.mts. ( 710 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHKC1S59.02 Sq.mts. ( 635 Sq.ft. )28
28 Booked100% Booked
100% Booked
3 BHKA1S83.28 Sq.mts. ( 896 Sq.ft. )28
28 Booked100% Booked
100% Booked
3 BHKA2S81.38 Sq.mts. ( 876 Sq.ft. )28
28 Booked100% Booked
100% Booked
3 BHKB1S81.31 Sq.mts. ( 875 Sq.ft. )12
12 Booked100% Booked
100% Booked
3 BHKB2S83.2 Sq.mts. ( 896 Sq.ft. )12
12 Booked100% Booked
100% Booked
3 BHKB2ST285.05 Sq.mts. ( 915 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHKB3S85.27 Sq.mts. ( 918 Sq.ft. )9
9 Booked100% Booked
100% Booked
3 BHKC1S79.92 Sq.mts. ( 860 Sq.ft. )28
28 Booked100% Booked
100% Booked
3 BHKD1S85.2 Sq.mts. ( 917 Sq.ft. )9
8 Booked88% Booked
88% Booked
3 BHKD2ST284.97 Sq.mts. ( 915 Sq.ft. )1
1 Booked100% Booked
100% Booked
266 total apartments / 264 apartments booked. 99% apartments booked.
Work Description in Building Tower1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower4Sep 202233110103
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHKAS41.49 Sq.mts. ( 447 Sq.ft. )192
192 Booked100% Booked
100% Booked
1 BHKBL37.86 Sq.mts. ( 408 Sq.ft. )32
32 Booked100% Booked
100% Booked
2 BHKES53.83 Sq.mts. ( 579 Sq.ft. )23
20 Booked86% Booked
86% Booked
247 total apartments / 244 apartments booked. 98% apartments booked.
Work Description in Building Tower4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Ardent Properties Private Limited
for Project
Serein Phase 1
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation