Project overview

Seasons Park is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700017459. Seasons Park is located at S No 49 H No 4/A, 4/B,6/D. This is a New being developed by Shree Balaji Homes.

Seasons Park has 1 BHK, 2 BHK, 3 BHK & SHOP Apartments with carpet areas ranging from 184 to 740 Sq.ft. Carpet. The Project has total 325 of which 110 are currently available for sale.

Seasons Park is being developed on a total land area of 143232 Sq.ft. out of which 18018 Sq.ft. i.e 13% is reserved for recreational purposes. Seasons Park has 4 Wings / Towers Tower 1,Tower 2,Tower 3,Tower 4

ProjectDeveloperLocationPossession
Bhakti ParkShivkrupa Enterprises730-03-2023 00:00:00
Priti ApartmentMahesh Mahadu Tare579 To 583 , 604 A And B30-12-2022 00:00:00
Raj Regalia Phase-1AAmrut Laxmi DevelopersS No. 54/3/E, 55/2, 55/330-06-2023 00:00:00
Ritz Phase - IiVikas Harakchand JainSurvey No. 39/5 Part, 6/1 Part And 6/2 Part.30-06-2024 00:00:00
Ganpati HeightsManoj Prabhakar PatilS. No 2 H No 23B30-05-2024 00:00:00
Omkar Darshan Co Op Hsg SocVinod Madhukar BhoirS No 26 H No 2A Plot No 430-06-2024 00:00:00
Dipti Sky City Phase 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
Snehal Paradise Wing AM/S Krishna DevelopersS No 2A H No 2B31-01-2020 00:00:00
Shree RajRajententerprisesSr No 39 H No 530-04-2019 00:00:00
Siyara IconShakti Realty1/34/35/36/44/79/3/80/131-12-2025 00:00:00
SpectrumKulin Enterprises3445-3454, 3455-347401-12-2024 00:00:00
Liana CMacrotech Developers Limited65 /15 A (Pt)31-03-2026 00:00:00
Master BuildconMaster BuildconGut No 27 Plot No 1630-03-2022 00:00:00
Sai Tirth Phase IPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KasturiJ.K.InfraS R No 130 Hissa No 330-12-2024 00:00:00
Mount View R4 To R7Himanshu Builders & DevelopersS No 67/3A 68/9B31-12-2023 00:00:00
Balaji VivantaMayur Enterprises Builders & DevelopersPlot No 3 ,Hissa No 1 ,2,3 ,4 Old Survey No 71 Hissa No 1,231-12-2023 00:00:00
Mohankheda GreensRajeshkumar Moolchand RupawatSurvey No 38 Hissa No 330-12-2023 00:00:00
Ozone GalaxyHallmark Infra Realty Llp64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
Shubham Galaxy - B WingNavkar Associates4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Lodha Quality Home Tower 4Macrotech Developers Limited32/10P, 32/15P, 32/14P30-09-2024 00:00:00
Vishwajeet Pink CityGulabrao Baburao Karanjule PatilGut No.48, Plot No.15,19,23,24,25,26,27 And 3730-05-2025 00:00:00
Spm Lake City Phase Ii Part 1Kothari & Deshmukh Landmark LlpSurvey No 56 Hissa No 230-01-2026 00:00:00
Sai Geeta Apt.K K EnterprisesSurvey No 29, H N 5A, Plot No 7231-12-2023 00:00:00
Laxminarayan ParkJalaram InfraSurvey No 63 Hissa No331-12-2023 00:00:00
Mangaljyot Co Op Hsg Soc LtdShridhar Dattatray Patil8/B/1/2 And 9/B/1/331-12-2026 00:00:00
Sai LeelaSaijyotbuilders&DevelopersPlot No 20 Sector 30D30-06-2024 00:00:00
Shiv HeightsBalaji DevelopersSurvey No.15 Hissa No 731-03-2023 00:00:00
Shree Sai Saburi Apartment-Building BShree Saishraddha EnterprisesSurvey No 9/3 And 16/131-03-2025 00:00:00
Shafique Khatimiti TowerRameez Shahnawaz MajeedCts 126430-12-2021 00:00:00
ElementsUma RealtyC. S. No. 27/130-12-2023 00:00:00
Shree Siddhivinayak Park Wing A1 And A2Satyashiv DevelopersS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
Dream AvenueDream Maruti RealtorsS No 15, H No 4 - S No 16, H No 331-12-2025 00:00:00
Kisan HeightsPravin Kisan BhoirS No 86/1/130-09-2027 00:00:00
Regency Sarvam Phase 12Regency Nirman LtdS No.42/1, 42/2, 42/3, 42/4A/1, 42/4A/2, 42/5, 42/6, 47/1, 50/1A, 50/2, 220/1, 201/1, 223/130-11-2024 00:00:00
Sai PurabWestern Arch Developers9/1/230-09-2023 00:00:00
Akshar EvannaM/S Akshar Om ConstructionPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B And B1Rassaz Infrastructure Private Limited369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
Shreeman Residency B And C WingOm EnterprisesSurvey No 1 Hissa No 14/2, 14/1/230-12-2029 00:00:00
ValenciaImpressionsC T S No 2065 To 2068, 1465 And 146630-06-2024 00:00:00
Silver Creast Wing -A Phase - IiShrikrishna EnterprisesS No 83 H No 1430-03-2026 00:00:00
Mount CasaNagraj Mutha108B,112A/3, 113B31-12-2026 00:00:00
Upper Thane-Casa EdenMacrotech Developers Limited55/12 A31-03-2026 00:00:00
Omkar HeightsOmkar Builders & DevelopersCts No 114831-03-2024 00:00:00
PadmanabhYash Govinda Build Infra LlpTika No.10, C.T.S No.222B24-10-2023 00:00:00
Orchid A To LPalava Dwellers Pvt Ltd27Pt And 139/2 Pt30-06-2018 00:00:00
Tanisha HeightsM/S. Balaji DevelopersCts No. 1962-197230-03-2023 00:00:00
Thanekar CivicShree Swami Samarth EnterprisesS No 133, H No 209-04-2024 00:00:00
Saurabh ResidencyM/S Krishna Builders & DevelopersS No 77 , H No 2/1730-06-2024 00:00:00
Ved ParadiseKulkarni And Associates896631-12-2024 00:00:00
Arjun VillaManohar Sahebrao Kadam192-J230-03-2022 00:00:00
Dosti Greater Thane - Phase 1Adrika Developers Private Limited9/4 Pt,7/8 Pt,7/1Pt, 11/25Pt,11/23Pt,12/19Pt,7/13Pt,11/17Pt,11/12Pt,11/13Pt,11/7Pt,11/1Pt,11/8Pt,11/18Pt,11/19A Pt,11/19B Pt,11/15Pt,11/16Pt,11/14Pt,11/11Pt,12/9Pt,11/21Pt01-04-2026 00:00:00
Vedant Palacia Phase Iv Wing B-BrutusTharwani PropertiesSr.No.16,Hissa No.431-12-2026 00:00:00
Delta StellarNoble Organics Pvt. Ltd.Plot No D-43/3 And D-43/431-12-2028 00:00:00
Mauli SadanMauli ConstructionCts 9039 To 904304-02-2024 00:00:00
Rajoba SolitaireM/S. Gangadhar Associates58B/1A, Sector Ii, Tikka No. 2 Village Thane30-06-2026 00:00:00
Shree Gajanan Enterprises Rukhmini ChsShree Gajanan Enterprises Rukhmini ChsPlot No. 331-07-2026 00:00:00
Dosti West County - Phase 5 - Dosti Olive - Wing ADosti EnterprisesSurvey No 16/10/A/1(Pt), 16/9/A(Pt), 16/8/A(Pt)30-09-2028 00:00:00
Ganesh Villa ChslBhavani EnterprisesSurvey No 7A/4/A/330-06-2026 00:00:00
Gayatri EleganceGayatrikripa Developers Private LimitedOld Survey No. 229, Hissa No. 1330-12-2025 00:00:00
Shree Saishraddha Apartment Building AShree Saishraddha EnterprisesSurvey No 9/3 And 16/130-03-2023 00:00:00
Pinnacolo NxSkd Realty LlpOld S.No.445,New S.No.12930-06-2025 00:00:00
Gami Industrial Park - C BuildingGolden Falcon Pacific LtdPlot No C-39A31-12-2024 00:00:00
Shreeji CloudShreeji Lifespaces InfrastructurePlot No 78, Sector 21 At Ulwe30-06-2026 00:00:00
Priyal AumShree Mauli Chs LtdPlot No 47 Sector 2601-06-2024 00:00:00
Shivaay AvyaanShreeram BuildconNew Survey 7,281(Old), Hissa No.230-11-2025 00:00:00
Dosti Desire - Phase 2D.D. Associates85/731-08-2027 00:00:00
Shubh Mangalam Phase IiShubh RealitySr No 106 Hissa No 125-12-2026 00:00:00
Vimal ShreeRitesh Ramesh JainOld Sno 215 Hno 1 New Sno 198 Hno 130-12-2023 00:00:00
Sai PalacePravin Narasi Manani3630-06-2022 00:00:00
Saishiv ComplexSaishiv ConstructionSurvey No 54 By 3 Hissa No 1 And 230-12-2023 00:00:00
Swami Samarth ApartmentMhatre Developers1231A30-03-2023 00:00:00
Yashoghar ChsBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
Vishwajeet Precious Phase IAbhijeet PrideSurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
Shreyas SapphireVinod Premjibhai TrapasiaPlot No- 1D-2 Sector-3A Karanjade Panvel Navi Mumbai31-03-2025 00:00:00
Upper Thane-Mlcp C ShopsMacrotech Developers Limited60/2 Part,60/1 Part31-12-2024 00:00:00
Innovative Infocom And It ParksInnovative Infocom & It Parks Private LimitedPlot No. Gen 71/1 And Gen 71/1/126-11-2027 00:00:00
Prem Ratna PlazaAditi Home MakerSurvey No 84 Hissa No 331-12-2027 00:00:00
Sai CityOm Sai Builders & DevelopersSurvey No.3/1/E,3/1/D,3/1/C31-12-2031 00:00:00
Marathon Nextown JasperMarathon Ener-Gen140,141/2,141/1,142/3,220/1B31-12-2027 00:00:00
Shyam ParkVishnu Shyamlal SachdevCts . No. 2077031-12-2025 00:00:00
Mhatre CompoundLodha Developers Limited85/2 Pt30-06-2018 00:00:00
Aastha River ViewAastha Buildcon3 And 4 / Sec 1830-12-2022 00:00:00
Patels Prayosha - Pramukh SadanSahajanand DevelopersSurvey No 39A Hissa No 1A And 1B30-12-2023 00:00:00
The Universe Neptune - BGayasuddin Riyazuddin KhanS No 112/130-06-2024 00:00:00
Siyara Fortune Building A Wing BShakti Realty8145, 8146, 8153, 8172, 8176 To 820231-12-2027 00:00:00
Satyaneelayam Co Op Hsg SocietyYash Infra749 B31-12-2025 00:00:00
Akshar Business Park- Phase IiiAkshar DevelopersPlot No. 3, Sector-2531-07-2022 00:00:00
Swaraj OrchidM/S Crystal HomesSurvey No 25 Hissa No 230-12-2022 00:00:00
Surya ComplexM/S. Jai Santoshi Maa EnterprisesS. No. 102, H. No.2, 3 Pt, 5, 17, 1830-06-2023 00:00:00
Regency Park Iii Building No 2Johar Hasan ZojwallaCts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
Seasons SaharaSamarth Sai Builders & DevelopersS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/S Vedant Chetana Enterprises NxS No.380, Cts No 133230-12-2023 00:00:00
Aai Mauli ParkHendar Laxman MhatreS. No. 1731-12-2025 00:00:00
Shubham Monolith D WingGaurivinayak Builders And Developers Pvt LtdSurvey No 30 Hissa No 15A31-12-2026 00:00:00
Godrej Ascend Phase 3Godrej Properties Limited39 Part, 41/1 Part31-10-2029 00:00:00
19 EastMoreshwar Developers5230-12-2025 00:00:00
Reliance GoldGolden EnterprisesS No 58/1/4 S No 59/128-02-2028 00:00:00
Basera HeightsKamruddin Hasmullah SiddiqueOld Sno 223/5 221/1 New Sno 191/5 190/130-03-2024 00:00:00
Chandrakant ResidencyAmogh ConstructionC.T.S No- 2 To 8 & C.T.S No- 169 To 178, C.T.S No- 295 To 30031-12-2027 00:00:00
Daisy Gardens Building No.13Ankita BuildersSurvey No 9, Hissa No 2A30-06-2026 00:00:00
Madhusudan Retreat TerracesMadhusudan Leisure HomesSurvey No 5031-12-2026 00:00:00
Arnav Wing DPrashant Raghunath PatilGut No 55 Hissa No 131-12-2027 00:00:00
Smit VistaSmit Megastructures(Old) Survey No. 242/17, 18,, ( New) Survey No. 33/17, 1831-12-2029 00:00:00
Ram Smruti Chs LtdSai Prakash Builders And DevelopersPlot No 139 Cts No 392531-12-2026 00:00:00
Kamdhenu CrownKamdhenu GreenPlot No-6+7, Sector-19, Sanpada31-12-2029 00:00:00
HarmonyBuildman Construction225/831-12-2019 00:00:00
N G Valencia Phase IiRna Builders (Ng)S No 335/3 Part Old 338/10 New30-09-2020 00:00:00
VandanamMetro BuildconSurvey No 68Plot No 28 Hissa No 1P 3P 4P30-12-2021 00:00:00
Siddhivinayak GardensA1 Buildcon991, 2, 3 And 1001830-12-2024 00:00:00
Shree ShaliniJay Service And ConsultantCts No 251 And 252A30-09-2023 00:00:00
M Square It ParkPaper FlutingsA241 And A24230-03-2024 00:00:00
Panvelkar EmpireOm Sai Shraddha DevelopersSurvey No. 30/4 (P)30-06-2026 00:00:00
Om Sai One ParkInfini DevelopersCts 133/3 133/4 134/3 134/5 134/9 134/10 134/11 134/4/A 138/13/A 138/13/B 138/13/C31-12-2028 00:00:00
Dashmesh ParkSatyam ConstructionsCts No 2340931-03-2023 00:00:00
Shankeshwar DarshanKalpvriksh Homes LlpOld Sno 559 New Sno 207 Hno 1,2 Old Sno 560 New Snio 165 Hno 1Pt31-12-2024 00:00:00
Eknath Heights - 1Omkar EnterprisesSurvey No 123 Hissa No 331-12-2022 00:00:00
Belvedere-B And CMacrotech Developers Limited212/7A Part 212/7B Part 212/7C Part 212/7D Part 212/7E Part 25/2A(Part) 25/2B(Part) 25/4(Part)30-11-2027 00:00:00
Sai Dream OneGls InfrastructuresS No.88, H No 6 & 731-12-2025 00:00:00
Neelkanth Palm AvenueNeelkanth InfratechPlot No-23 & 24, Sector-09 Ghansoli29-12-2029 00:00:00
Navare PlazaOm Developers8028 8029 803028-08-2022 00:00:00
Sai HeritageMitra HomesSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
Shree Girijatmak Co Op Hou Soc LtdShree Saraswati DevelopersOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
Belvedere IMacrotech Developers Limited25/2A Part 25/2B Part31-07-2028 00:00:00
Jay Meghdoot ChslS R DevelopersS.No.46/H.No.6/A/13,Plot No.2731-12-2025 00:00:00
Foresta EMacrotech Developers Limited53/1(Part), 53/2(Part), 53/3(Part)31-08-2028 00:00:00
Paras Apartment Co-Op. Housing Society LtdShiv Infra1314, Village Kohoj-Khuntvali02-06-2027 00:00:00
SambhaviShree Vakratunda DevelopersSurvey No 531-10-2024 00:00:00
Shree Mangal Narayan ResidencyN V ConstructionCts 9721 To973431-12-2023 00:00:00
Vakratunda HomesNarayan Sunil RanePlot No 4,S .No 108, Hissa No 131-12-2023 00:00:00
TiaraSagar EnterpriseS No 20 And Chalta No 2430-03-2024 00:00:00
Metro Aangan Phase - IMetro CreatorsS No 78 H No 7 P And 8 P30-12-2028 00:00:00
Prakruti SparshAvishkar BuildconS No 49, H No 10D30-12-2022 00:00:00
Hemant Shishir Co.Op HsgNarendra Kalyanji Patel3512-352131-12-2023 00:00:00
Fortune EmporioQuanta Realty LlpCts No 4090 To 4096,4166 To 4171,4240,4241 New Sno 37 Hno 3C31-12-2025 00:00:00
The Valaji EstateFore Holdings4065,4093-4097,4099-410205-07-2024 00:00:00
Neelkanth Palm PresidentNeelkanth InfratechPlot No 10 Sectot 11 Ghansoli31-12-2029 00:00:00
Garden Estate Phase -IiShree Balaji DevelopersSurvey No. 46, Hissa No. 12/131-03-2025 00:00:00
Parvati NiwasAadarsh DevelopersCst No 27/1B, 27/1C Tikka No 2231-12-2025 00:00:00
Sheth SupremeSheth Builders Private LimitedOld Survey No 159 Pt And New Survey No 20 Pt30-12-2024 00:00:00
One AksharAkshar RealtorsPlot No 730-12-2026 00:00:00
Vedant KalashShivalik DevelopersSurvey No 48 Hissa No 2 Plot No 5 And 630-03-2022 00:00:00
Shubham ResidencyShubham RealtyPlot No 79,Sector 2130-06-2025 00:00:00
Shree Mahalaxmi ResidencyShree Gajanan Builders And DevelopersS No 93 / H No A, S No 9431-07-2028 00:00:00
Thane ProjectMacrotech Developers Limited144/1 Part31-07-2029 00:00:00
Omkar AvenueOmkar RealtorsCts No. 761 (Old Survey No.87/11 Plot No.11)31-03-2028 00:00:00
Century TwoCity InfraPlot No 22,Sector-0931-03-2028 00:00:00
Pokhriyal ParamountPokhriyal And AssociatesSurvey No. 127, Plot No. D31-12-2028 00:00:00
Unique Estate - IiUnique Shanti RealtorsOld S.No. 400 New S.No. 58 Hissa No. 2 And 330-06-2028 00:00:00
Musica ApartmentE I ConstructionCts No. 36 B/1, Tikka No.8 Sector 2 Congested31-12-2026 00:00:00
Royal VillasAdarsh EnterprisesCts No 3535, Plot No 7, Final Plot No 7 Mauje Bhiwandi31-12-2025 00:00:00
Sky ViewShreeji IconSurvey No 115, Hiisa No 6(P)30-11-2028 00:00:00
Plot No -1A,Sector -19, Vashi Truck TerminalCity And Industrial Development Corporation Of Maharashtra LimitedPlot No -1A31-12-2025 00:00:00
Jp HarmonyJp Corp Developers (India) Llp12931-12-2023 00:00:00
Deep Royal ResidencyM/S. Deepali Infracon LlpSurvey No.80 Hissa No.231-12-2023 00:00:00
Shreeram ResidencyRaghunath Kedari Phadtare690/330-12-2025 00:00:00
Jagjeet EnclaveJagjeet Shrusti Realtors29/1/C04-05-2024 00:00:00
Zunera Heights786 Micron Builders & Developers101/ 2 3 4 5 1230-12-2022 00:00:00
Kapleshwara ResidencyKapleshwara Homes Llp119/6C (Old), 84/6C (New)31-12-2029 00:00:00
Sara TowerHope Builders And Developers233 And 23431-12-2026 00:00:00
Vedang Lake CityVedang ConstructionS. No. 4 H. No. 2/1 And S. No. 12 H. No 1/331-12-2025 00:00:00
Spm Dream City Phase 2Swastik LifespaceSurvey No 52, Hissa No 4/531-12-2030 00:00:00
Blue Ladder Business EnclaveBlue LadderW-212 Part, W-212, W-21315-08-2028 00:00:00
Navrang HeightsAbode Builders & DevelopersS No 101 Hissa No 9(B) Pt And 9(C) Sector 0531-12-2027 00:00:00
L And T Realty Evara Heights T4Elante Properties Private LimitedS. No. 502/A(Pt), 67(Pt), 83/1 (Pt)30-04-2030 00:00:00
Vrundavan DhamShikhar LifespacesS.No 13, H No. 1 P31-12-2023 00:00:00
Riverwood Park Building No -3Shree Khidkaleshwar Property Developers Pvt. Ltd.26/2, 26/3 All In Parts30-06-2026 00:00:00
Vishwajeet Empire NxGulabrao Baburao Karanjule PatilSurvey No 39 Hissa No 2A, Hissa No 2B, Hissa No 2C And Hissa No 2D23-06-2026 00:00:00
Krishna GalaxyKrishna Builders & DevelopersSurvey No 42 Hissa No 230-06-2023 00:00:00
Villa SmaranOm Villa Buildtech LlpCts No 1194E And Cts No 1194A Sector 2930-03-2024 00:00:00
Virat MansionNeelyog DevelopersCts No 9907,9908 To 991330-12-2022 00:00:00
Mukund VishnuShree Swami Samartha AssociatesTika No 12 Cst No 103A 2A 103A 2B Village Pachpakhadi30-12-2021 00:00:00
Anjani SparshGeeta Space Realtors249-2, 249-730-12-2020 00:00:00
Mohan Nano Estates IiiMohan Lifespaces Llp24/1,24/2P,24/6P,24/8,24/9,25/1,25/231-12-2019 00:00:00
Building No. 2 Wings A And B AlpineSd Corporation Private Limited840 A/130-12-2020 00:00:00
PrathamRoodraksh Probuilder And Infracon Private LimitedCts 284B 284D31-12-2019 00:00:00
Reliable ResidencyReliable InfraventuresPLOT NO 72 SC S NO 12, 130-04-2024 00:00:00
Aadi AarambhNirman Construction129/1 A And 129/1B28-02-2018 00:00:00
Crystal HeightsNirala Construction424B, 425, 416B, 421/1 To 3, 421, 417/1 To 430-12-2021 00:00:00
Silver SpringAnudan Properties Private LimitedF. P.4330-12-2022 00:00:00
Pushpa ParkVas Infrastructure Ltd.75715-08-2023 00:00:00
Sheetal TapovanDgs Township Pvt Ltd818 823A 823B 823C 823 1 81801-06-2023 00:00:00
Shree Ganesh SymphonyPawar GroupS. No.172, H.No.1/801-12-2025 00:00:00
Trimurti GardenSai Narayan DevelopersSurvey No 126 Hissa No 130-12-2025 00:00:00
Tulsi Aahan - B WingRaj GroupS No 39, H No 1,230-12-2022 00:00:00
ZenR A ConstructionCts No 2086430-06-2024 00:00:00
Navrang Co Op Hsg SocietyYadav Bros ConstructionPlot No. 3, Gut No 5431-12-2024 00:00:00
Prathamesh ChslNirmal DevelopersSurvey No 26 Hissa No 2A Plot No 3 (Old Plot No.18)31-12-2024 00:00:00
Anantam HeightsKanak RealtyS.No.101, C.T.S No.328030-06-2024 00:00:00
Capmatrix SquareCapmatrix Buildcon LlpB-33, 33 Part15-12-2022 00:00:00
Lodha Panacea IiMacrotech Developers Limited240/5A Pt30-09-2023 00:00:00
Vivaan HeightsShree EnterprisesSurvey No 84, Hissa No 1431-12-2029 00:00:00
Rutu SamruddhiHarasiddh Realtors43/2B/231-12-2029 00:00:00
Seasons Sahara Nano Building No A And BSamarth Sai Builders & DevelopersS No. 23/ H. No.2, Village Adivali Dhokali31-12-2026 00:00:00
Shripat GalaxyShree Shripat Builders & DevelopersS. No 192/3/A, Sector 11, Village Shil31-12-2029 00:00:00
Fenkin EmpireFen-Kin Realtors & Project Pvt LtdCts No 313 And 314B31-07-2023 00:00:00
Sai PearlM/S Mitra RealityS No 67 H No 331-12-2025 00:00:00
Baradia EkdantBaradia RealtyCts No 259,26022-07-2026 00:00:00
Jay ResidencyMukesh Vithal GiteS.No. 111/H.No. 2/1/3/531-12-2024 00:00:00
Seven HeightsOvais Mudabbir BardiS No 15/1 20/2 Plot No 4 And Cts No 383831-12-2025 00:00:00
Jardino AMacrotech Developers Limited62/2 P, 62/3 P And 65/5C P31-08-2027 00:00:00
Vijay HeightsShree Jari Mari ResidencyCts No.14137,S.No.44 H.No.2031-03-2028 00:00:00
North Imperial Greens - Tower 1Skylark Buildspace Private LimitedCts No. 450 Pt, 449 Pt, 451, 455/A Pt, 460 Pt, 461 Pt, 464/1 Pt, 465/1 Pt, 538/1, 46331-12-2032 00:00:00
Jasper C And DMacrotech Developers Limited54/5(Pt), 54/15(Pt)31-08-2028 00:00:00
Kamdhenu PinnacleKamdhenu GreenPlot No. 44, Sector-13, Nerul31-12-2029 00:00:00
Sadguru Nakshtra Phase ISadguru DevelopersSurvey No 1204A And Survey No 118330-12-2023 00:00:00
Banjara Hills Sector 7Seema Developers127, 408/1, 407/230-12-2022 00:00:00
Lodha Panacea IMacrotech Developers Limited55Pt31-12-2021 00:00:00
Upper Thane-Iris Wing AMacrotech Developers Limited293/1 And 293/331-12-2027 00:00:00
Jivdani BuildingMildstone Enterprises Llp133231-12-2024 00:00:00
Project Details
  • Project:
    Seasons Park
  • Location:
  • S No 49 H No 4/A, 4/B,6/D
  • Const. Stage:
    New
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    Shree Balaji Homes
  • Phone:
  • Address:
  • Deepak Commercial Complex
Project RERA Details
MAHA REARA No: P51700017459
Project Type Others
RERA Project Status New
Architect Pramod Shankar Kamble
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 30 Dec 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 22 Aug 2018
Last Retrived 26 Jul 2025
Seasons Park QR Code
Seasons Park
MahaRERA - P51700017459
Apartment Details & Configuration
TypeArea
1 BHK27.85 Sq.mts. ( 300 Sq.ft. )
1 BHK30.41 Sq.mts. ( 327 Sq.ft. )
1 BHK31 Sq.mts. ( 334 Sq.ft. )
1 BHK31.28 Sq.mts. ( 337 Sq.ft. )
1 BHK31.47 Sq.mts. ( 339 Sq.ft. )
1 BHK31.56 Sq.mts. ( 340 Sq.ft. )
1 BHK32.12 Sq.mts. ( 346 Sq.ft. )
1 BHK32.65 Sq.mts. ( 351 Sq.ft. )
1 BHK32.66 Sq.mts. ( 352 Sq.ft. )
1.5 BHK39.05 Sq.mts. ( 420 Sq.ft. )
1.5 BHK39.78 Sq.mts. ( 428 Sq.ft. )
1.5 BHK39.89 Sq.mts. ( 429 Sq.ft. )
1.5 BHK40.28 Sq.mts. ( 434 Sq.ft. )
1 BHK27.42 Sq.mts. ( 295 Sq.ft. )
1 BHK27.78 Sq.mts. ( 299 Sq.ft. )
1 BHK28.47 Sq.mts. ( 306 Sq.ft. )
1 BHK30.02 Sq.mts. ( 323 Sq.ft. )
1 BHK30.21 Sq.mts. ( 325 Sq.ft. )
1 BHK30.39 Sq.mts. ( 327 Sq.ft. )
1 BHK30.57 Sq.mts. ( 329 Sq.ft. )
1 BHK30.6 Sq.mts. ( 329 Sq.ft. )
1 BHK30.87 Sq.mts. ( 332 Sq.ft. )
1 BHK31.32 Sq.mts. ( 337 Sq.ft. )
2 BHK38.51 Sq.mts. ( 415 Sq.ft. )
2 BHK41.79 Sq.mts. ( 450 Sq.ft. )
1 BHK31.65 Sq.mts. ( 341 Sq.ft. )
2 BHK38.66 Sq.mts. ( 416 Sq.ft. )
2 BHK39.11 Sq.mts. ( 421 Sq.ft. )
2 BHK40.79 Sq.mts. ( 439 Sq.ft. )
2 BHK41.32 Sq.mts. ( 445 Sq.ft. )
2 BHK41.95 Sq.mts. ( 452 Sq.ft. )
2 BHK42.17 Sq.mts. ( 454 Sq.ft. )
2 BHK42.46 Sq.mts. ( 457 Sq.ft. )
2 BHK43.86 Sq.mts. ( 472 Sq.ft. )
2 BHK44.31 Sq.mts. ( 477 Sq.ft. )
2 BHK44.33 Sq.mts. ( 477 Sq.ft. )
2 BHK45.15 Sq.mts. ( 486 Sq.ft. )
1 BHK33.27 Sq.mts. ( 358 Sq.ft. )
1 BHK36.52 Sq.mts. ( 393 Sq.ft. )
2 BHK40.42 Sq.mts. ( 435 Sq.ft. )
2 BHK41.55 Sq.mts. ( 447 Sq.ft. )
2 BHK43.77 Sq.mts. ( 471 Sq.ft. )
2 BHK44.84 Sq.mts. ( 483 Sq.ft. )
2 BHK47.31 Sq.mts. ( 509 Sq.ft. )
2 BHK47.52 Sq.mts. ( 512 Sq.ft. )
3 BHK66.26 Sq.mts. ( 713 Sq.ft. )
3 BHK68.77 Sq.mts. ( 740 Sq.ft. )
SHOP5.59 Sq.mts. ( 60 Sq.ft. )
SHOP17.1 Sq.mts. ( 184 Sq.ft. )
SHOP21.23 Sq.mts. ( 229 Sq.ft. )
SHOP23.24 Sq.mts. ( 250 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Seasons Parklast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
1673.88 Sq Mtr
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
At The Time Of Completion
Energy management
Na
Fire Protection And Fire Safety Requirements
At The Time Of Completion
Landscaping & Tree Planting
Landscape Proposed
Open Parking
-
Sewerage (Chamber, Lines, Septic Tank , STP)
At The Time Of Completion
Solid Waste Management And Disposal
Na
Storm Water Drains
At The Time Of Completion
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting At The Time Of Completion
Water Supply
Water Connection Will Be Provided By Concerned Dep
Buildings / Wings in Seasons Park
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Seasons Park by Shree Balaji Homeslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

143232 Sq. ft.

Project Area

18018 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

325 apartments in total
Total
325
Booked
215
Available
110

Saleable Area Statistics (Sq. ft.)

128025 Total
Total
128025
Booked
87786
Available
40239
Total 325 apartments in project. 215 apartments booked. 66% apartments booked.
Total 128025 Sq.ft. saleable area. 87786 saleable area booked.
69% area booked.

Tower 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 1Dec 2021121010014
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.85 Sq.mts. ( 300 Sq.ft. )6
2 Booked33% Booked
33% Booked
1 BHK30.41 Sq.mts. ( 327 Sq.ft. )5
2 Booked40% Booked
40% Booked
1 BHK31 Sq.mts. ( 334 Sq.ft. )12
9 Booked75% Booked
75% Booked
1 BHK31.28 Sq.mts. ( 337 Sq.ft. )5
1 Booked20% Booked
20% Booked
1 BHK31.47 Sq.mts. ( 339 Sq.ft. )6
3 Booked50% Booked
50% Booked
1 BHK31.56 Sq.mts. ( 340 Sq.ft. )10
9 Booked90% Booked
90% Booked
1 BHK32.12 Sq.mts. ( 346 Sq.ft. )10
7 Booked70% Booked
70% Booked
1 BHK32.65 Sq.mts. ( 351 Sq.ft. )6
4 Booked66% Booked
66% Booked
1 BHK32.66 Sq.mts. ( 352 Sq.ft. )6
5 Booked83% Booked
83% Booked
1.5 BHK39.05 Sq.mts. ( 420 Sq.ft. )5
4 Booked80% Booked
80% Booked
1.5 BHK39.78 Sq.mts. ( 428 Sq.ft. )6
4 Booked66% Booked
66% Booked
1.5 BHK39.89 Sq.mts. ( 429 Sq.ft. )5
5 Booked100% Booked
100% Booked
1.5 BHK40.28 Sq.mts. ( 434 Sq.ft. )6
6 Booked100% Booked
100% Booked
88 total apartments / 61 apartments booked. 69% apartments booked.
Work Description in Building Tower 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress20% done
20% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress20% done
20% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress34% done
34% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 2Dec 2021121010015
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.42 Sq.mts. ( 295 Sq.ft. )5
4 Booked80% Booked
80% Booked
1 BHK27.78 Sq.mts. ( 299 Sq.ft. )6
5 Booked83% Booked
83% Booked
1 BHK28.47 Sq.mts. ( 306 Sq.ft. )5
4 Booked80% Booked
80% Booked
1 BHK30.02 Sq.mts. ( 323 Sq.ft. )5
2 Booked40% Booked
40% Booked
1 BHK30.21 Sq.mts. ( 325 Sq.ft. )6
4 Booked66% Booked
66% Booked
1 BHK30.39 Sq.mts. ( 327 Sq.ft. )5
2 Booked40% Booked
40% Booked
1 BHK30.57 Sq.mts. ( 329 Sq.ft. )5
3 Booked60% Booked
60% Booked
1 BHK30.6 Sq.mts. ( 329 Sq.ft. )5
2 Booked40% Booked
40% Booked
1 BHK30.87 Sq.mts. ( 332 Sq.ft. )12
5 Booked41% Booked
41% Booked
1 BHK31 Sq.mts. ( 334 Sq.ft. )6
5 Booked83% Booked
83% Booked
1 BHK31.32 Sq.mts. ( 337 Sq.ft. )6
4 Booked66% Booked
66% Booked
1 BHK31.56 Sq.mts. ( 340 Sq.ft. )5
1 Booked20% Booked
20% Booked
1 BHK32.12 Sq.mts. ( 346 Sq.ft. )5
3 Booked60% Booked
60% Booked
1 BHK32.65 Sq.mts. ( 351 Sq.ft. )6
5 Booked83% Booked
83% Booked
1 BHK32.66 Sq.mts. ( 352 Sq.ft. )6
4 Booked66% Booked
66% Booked
2 BHK38.51 Sq.mts. ( 415 Sq.ft. )6
5 Booked83% Booked
83% Booked
2 BHK41.79 Sq.mts. ( 450 Sq.ft. )5
4 Booked80% Booked
80% Booked
99 total apartments / 62 apartments booked. 62% apartments booked.
Work Description in Building Tower 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress20% done
20% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress20% done
20% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress34% done
34% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 3Dec 2021121010015
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31 Sq.mts. ( 334 Sq.ft. )6
4 Booked66% Booked
66% Booked
1 BHK31.65 Sq.mts. ( 341 Sq.ft. )5
3 Booked60% Booked
60% Booked
2 BHK38.66 Sq.mts. ( 416 Sq.ft. )6
6 Booked100% Booked
100% Booked
2 BHK39.11 Sq.mts. ( 421 Sq.ft. )5
5 Booked100% Booked
100% Booked
2 BHK40.79 Sq.mts. ( 439 Sq.ft. )5
1 Booked20% Booked
20% Booked
2 BHK41.32 Sq.mts. ( 445 Sq.ft. )6
5 Booked83% Booked
83% Booked
2 BHK41.95 Sq.mts. ( 452 Sq.ft. )5
2 Booked40% Booked
40% Booked
2 BHK42.17 Sq.mts. ( 454 Sq.ft. )6
4 Booked66% Booked
66% Booked
2 BHK42.46 Sq.mts. ( 457 Sq.ft. )5
5 Booked100% Booked
100% Booked
2 BHK43.86 Sq.mts. ( 472 Sq.ft. )6
4 Booked66% Booked
66% Booked
2 BHK44.31 Sq.mts. ( 477 Sq.ft. )5
4 Booked80% Booked
80% Booked
2 BHK44.33 Sq.mts. ( 477 Sq.ft. )5
5 Booked100% Booked
100% Booked
2 BHK45.15 Sq.mts. ( 486 Sq.ft. )12
9 Booked75% Booked
75% Booked
77 total apartments / 57 apartments booked. 74% apartments booked.
Work Description in Building Tower 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress25% done
25% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress25% done
25% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 4Dec 202112101006
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.27 Sq.mts. ( 358 Sq.ft. )6
1 BHK36.52 Sq.mts. ( 393 Sq.ft. )4
2 Booked50% Booked
50% Booked
2 BHK40.42 Sq.mts. ( 435 Sq.ft. )6
4 Booked66% Booked
66% Booked
2 BHK41.55 Sq.mts. ( 447 Sq.ft. )6
2 Booked33% Booked
33% Booked
2 BHK43.77 Sq.mts. ( 471 Sq.ft. )5
4 Booked80% Booked
80% Booked
2 BHK44.84 Sq.mts. ( 483 Sq.ft. )5
3 Booked60% Booked
60% Booked
2 BHK47.31 Sq.mts. ( 509 Sq.ft. )5
5 Booked100% Booked
100% Booked
2 BHK47.52 Sq.mts. ( 512 Sq.ft. )6
4 Booked66% Booked
66% Booked
3 BHK66.26 Sq.mts. ( 713 Sq.ft. )5
5 Booked100% Booked
100% Booked
3 BHK68.77 Sq.mts. ( 740 Sq.ft. )6
5 Booked83% Booked
83% Booked
SHOP5.59 Sq.mts. ( 60 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP17.1 Sq.mts. ( 184 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP21.23 Sq.mts. ( 229 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP23.24 Sq.mts. ( 250 Sq.ft. )3
None Booked0% Booked
0% Booked
61 total apartments / 35 apartments booked. 57% apartments booked.
Work Description in Building Tower 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress25% done
25% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress25% done
25% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Shree Balaji Homes
for Project
Seasons Park
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation