| Dipti Sky City PHASE 2 | Dipti Home Makers Pvt Ltd | 54/3/B, 54/3/D, 57/1 Part | 30-06-2023 00:00:00 |
| SNEHAL PARADISE WING A | M/S KRISHNA DEVELOPERS | S No 2A H No 2B | 31-01-2020 00:00:00 |
| SHREE RAJ | rajententerprises | Sr No 39 H No 5 | 30-04-2019 00:00:00 |
| BHAKTI PARK | SHIVKRUPA ENTERPRISES | 7 | 30-03-2023 00:00:00 |
| PRITI APARTMENT | MAHESH MAHADU TARE | 579 To 583 , 604 A And B | 30-12-2022 00:00:00 |
| RAJ REGALIA PHASE-1A | AMRUT LAXMI DEVELOPERS | S No. 54/3/E, 55/2, 55/3 | 30-06-2023 00:00:00 |
| MOHANKHEDA GREENS | RAJESHKUMAR MOOLCHAND RUPAWAT | Survey No 38 Hissa No 3 | 30-12-2023 00:00:00 |
| OZONE GALAXY | HALLMARK INFRA REALTY LLP | 64/10, 65/1, 65/3A, 65/3B, 66/5 | 30-12-2025 00:00:00 |
| SHUBHAM GALAXY - B WING | NAVKAR ASSOCIATES | 4948 4949 4950 4954 A B And 4969 A B | 30-12-2023 00:00:00 |
| SHAFIQUE KHATIMITI TOWER | RAMEEZ SHAHNAWAZ MAJEED | Cts 1264 | 30-12-2021 00:00:00 |
| ELEMENTS | UMA REALTY | C. S. No. 27/1 | 30-12-2023 00:00:00 |
| SHREE SIDDHIVINAYAK PARK WING A1 AND A2 | SATYASHIV DEVELOPERS | S No 66 H No 7 S No76 H No 5 Part | 30-12-2022 00:00:00 |
| MASTER BUILDCON | MASTER BUILDCON | Gut No 27 Plot No 16 | 30-03-2022 00:00:00 |
| SAI TIRTH PHASE I | PINNACLE CORPORATION | S No. 2 H No 4/B Joveli Village Badlapur East 421503 | 30-12-2023 00:00:00 |
| J K KASTURI | J.K.INFRA | S R No 130 Hissa No 3 | 30-12-2024 00:00:00 |
| Padmanabh | Yash Govinda Build Infra LLP | Tika No.10, C.T.S No.222B | 24-10-2023 00:00:00 |
| Orchid A to L | Palava Dwellers Pvt Ltd | 27Pt And 139/2 Pt | 30-06-2018 00:00:00 |
| Tanisha heights | M/S. BALAJI DEVELOPERS | Cts No. 1962-1972 | 30-03-2023 00:00:00 |
| Lodha Quality Home Tower 4 | LODHA DEVELOPERS LIMITED | 32/10P, 32/15P, 32/14P | 30-09-2024 00:00:00 |
| VISHWAJEET PINK CITY | GULABRAO BABURAO KARANJULE PATIL | Gut No.48, Plot No.15,19,23,24,25,26,27 And 37 | 30-05-2025 00:00:00 |
| SPM Lake City Phase II Part 1 | KOTHARI & DESHMUKH LANDMARK LLP | Survey No 56 Hissa No 2 | 30-01-2026 00:00:00 |
| SAI PURAB | WESTERN ARCH DEVELOPERS | 9/1/2 | 30-09-2023 00:00:00 |
| AKSHAR EVANNA | M/S AKSHAR OM CONSTRUCTION | Plot No 137 Sector 53 Dronagiri Navi Mumbai | 28-02-2024 00:00:00 |
| Rassaz Green Tower B and B1 | RASSAZ INFRASTRUCTURE PRIVATE LIMITED | 369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 13 | 30-12-2026 00:00:00 |
| SHREEMAN RESIDENCY B AND C WING | OM ENTERPRISES | Survey No 1 Hissa No 14/2, 14/1/2 | 30-12-2029 00:00:00 |
| VALENCIA | IMPRESSIONS | C T S No 2065 To 2068, 1465 And 1466 | 30-06-2024 00:00:00 |
| Silver Creast Wing -A Phase - II | SHRIKRISHNA ENTERPRISES | S No 83 H No 14 | 30-03-2026 00:00:00 |
| VIMAL SHREE | RITESH RAMESH JAIN | Old Sno 215 Hno 1 New Sno 198 Hno 1 | 30-12-2023 00:00:00 |
| SAI PALACE | PRAVIN NARASI MANANI | 36 | 30-06-2022 00:00:00 |
| SAISHIV COMPLEX | SAISHIV CONSTRUCTION | Survey No 54 By 3 Hissa No 1 And 2 | 30-12-2023 00:00:00 |
| ARJUN VILLA | MANOHAR SAHEBRAO KADAM | 192-J2 | 30-03-2022 00:00:00 |
| DOSTI GREATER THANE - PHASE 1 | ADRIKA DEVELOPERS PRIVATE LIMITED | 9/4 Pt,7/8 Pt,7/1Pt, 11/25Pt,11/23Pt,12/19Pt,7/13Pt,11/17Pt,11/12Pt,11/13Pt,11/7Pt,11/1Pt,11/8Pt,11/18Pt,11/19A Pt,11/19B Pt,11/15Pt,11/16Pt,11/14Pt,11/11Pt,12/9Pt,11/21Pt | 01-04-2026 00:00:00 |
| Mhatre Compound | Lodha Developers Limited | 85/2 Pt | 30-06-2018 00:00:00 |
| AASTHA RIVER VIEW | AASTHA BUILDCON | 3 And 4 / Sec 18 | 30-12-2022 00:00:00 |
| PATELS PRAYOSHA - PRAMUKH SADAN | SAHAJANAND DEVELOPERS | Survey No 39A Hissa No 1A And 1B | 30-12-2023 00:00:00 |
| SWAMI SAMARTH APARTMENT | MHATRE DEVELOPERS | 1231A | 30-03-2023 00:00:00 |
| YASHOGHAR CHS | Bhalchandra Vinayak Wadnerkar | 6616 To 6619 , 6623 To 6626 | 30-12-2021 00:00:00 |
| VISHWAJEET PRECIOUS PHASE I | ABHIJEET PRIDE | Survey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A | 02-03-2025 00:00:00 |
| Gayatri Elegance | Gayatrikripa Developers Private Limited | Old Survey No. 229, Hissa No. 13 | 30-12-2025 00:00:00 |
| SHREE SAISHRADDHA APARTMENT BUILDING A | SHREE SAISHRADDHA ENTERPRISES | Survey No 9/3 And 16/1 | 30-03-2023 00:00:00 |
| PINNACOLO NX | SKD REALTY LLP | Old S.No.445,New S.No.129 | 30-06-2025 00:00:00 |
| REGENCY PARK III BUILDING NO 2 | JOHAR HASAN ZOJWALLA | Cts No 575 S No 2 H No 9 And S No 2 H No 1/F/1 | 30-04-2024 00:00:00 |
| SEASONS SAHARA | SAMARTH SAI BUILDERS & DEVELOPERS | S No 34 H No 14 S No 34 H No 15 | 30-12-2023 00:00:00 |
| Indrayani | M/s Vedant Chetana Enterprises NX | S No.380, Cts No 1332 | 30-12-2023 00:00:00 |
| SIYARA ICON | SHAKTI REALTY | 1/34/35/36/44/79/3/80/1 | 31-12-2025 00:00:00 |
| SPECTRUM | KULIN ENTERPRISES | 3445-3454, 3455-3474 | 01-12-2024 00:00:00 |
| Liana C | LODHA DEVELOPERS LIMITED | 65 /15 A (Pt) | 31-03-2026 00:00:00 |
| HARMONY | BUILDMAN CONSTRUCTION | 225/8 | 31-12-2019 00:00:00 |
| N G VALENCIA PHASE II | RNA Builders (NG) | S No 335/3 Part Old 338/10 New | 30-09-2020 00:00:00 |
| VANDANAM | METRO BUILDCON | Survey No 68Plot No 28 Hissa No 1P 3P 4P | 30-12-2021 00:00:00 |
| Vedant Palacia Phase IV Wing B-Brutus | THARWANI PROPERTIES | Sr.No.16,Hissa No.4 | 31-12-2026 00:00:00 |
| DELTA STELLAR | NOBLE ORGANICS PVT. LTD. | Plot No D-43/3 And D-43/4 | 31-12-2028 00:00:00 |
| MAULI SADAN | MAULI CONSTRUCTION | Cts 9039 To 9043 | 04-02-2024 00:00:00 |
| RITZ PHASE - II | VIKAS HARAKCHAND JAIN | Survey No. 39/5 Part, 6/1 Part And 6/2 Part. | 30-06-2024 00:00:00 |
| GANPATI HEIGHTS | MANOJ PRABHAKAR PATIL | S. No 2 H No 23B | 30-05-2024 00:00:00 |
| OMKAR DARSHAN CO OP HSG SOC | VINOD MADHUKAR BHOIR | S No 26 H No 2A Plot No 4 | 30-06-2024 00:00:00 |
| Gami Industrial Park - C Building | Golden Falcon Pacific Ltd | Plot No C-39A | 31-12-2024 00:00:00 |
| SHREEJI CLOUD | SHREEJI LIFESPACES INFRASTRUCTURE | Plot No 78, Sector 21 At Ulwe | 30-06-2026 00:00:00 |
| PRIYAL AUM | SHREE MAULI CHS LTD | Plot No 47 Sector 26 | 01-06-2024 00:00:00 |
| Mount View R4 to R7 | Himanshu Builders & Developers | S No 67/3A 68/9B | 31-12-2023 00:00:00 |
| BALAJI VIVANTA | MAYUR ENTERPRISES BUILDERS & DEVELOPERS | Plot No 3 ,Hissa No 1 ,2,3 ,4 Old Survey No 71 Hissa No 1,2 | 31-12-2023 00:00:00 |
| SAI GEETA APT. | K K ENTERPRISES | Survey No 29, H N 5A, Plot No 72 | 31-12-2023 00:00:00 |
| LAXMINARAYAN PARK | JALARAM INFRA | Survey No 63 Hissa No3 | 31-12-2023 00:00:00 |
| MANGALJYOT CO OP HSG SOC LTD | SHRIDHAR DATTATRAY PATIL | 8/B/1/2 And 9/B/1/3 | 31-12-2026 00:00:00 |
| Akshar Business Park- Phase III | Akshar Developers | Plot No. 3, Sector-25 | 31-07-2022 00:00:00 |
| SWARAJ ORCHID | M/S CRYSTAL HOMES | Survey No 25 Hissa No 2 | 30-12-2022 00:00:00 |
| SURYA COMPLEX | M/S. JAI SANTOSHI MAA ENTERPRISES | S. No. 102, H. No.2, 3 Pt, 5, 17, 18 | 30-06-2023 00:00:00 |
| ANANTAM HEIGHTS | KANAK REALTY | S.No.101, C.T.S No.3280 | 30-06-2024 00:00:00 |
| CAPMATRIX SQUARE | Capmatrix Buildcon Private Limited | B-33, 33 Part | 15-12-2022 00:00:00 |
| Lodha Panacea II | LODHA DEVELOPERS LIMITED | 240/5A Pt | 30-09-2023 00:00:00 |
| 19 EAST | MORESHWAR DEVELOPERS | 52 | 30-12-2025 00:00:00 |
| RELIANCE GOLD | GOLDEN ENTERPRISES | S No 58/1/4 S No 59/1 | 28-02-2028 00:00:00 |
| BASERA HEIGHTS | KAMRUDDIN HASMULLAH SIDDIQUE | Old Sno 223/5 221/1 New Sno 191/5 190/1 | 30-03-2024 00:00:00 |
| SADGURU NAKSHTRA PHASE I | SADGURU DEVELOPERS | Survey No 1204A And Survey No 1183 | 30-12-2023 00:00:00 |
| BANJARA HILLS SECTOR 7 | SEEMA DEVELOPERS | 127, 408/1, 407/2 | 30-12-2022 00:00:00 |
| Lodha Panacea I | LODHA DEVELOPERS LIMITED | 55Pt | 31-12-2021 00:00:00 |
| DREAM AVENUE | DREAM MARUTI REALTORS | S No 15, H No 4 - S No 16, H No 3 | 31-12-2025 00:00:00 |
| Kisan Heights | Pravin Kisan Bhoir | S No 86/1/1 | 30-09-2027 00:00:00 |
| Regency Sarvam Phase 12 | REGENCY NIRMAN LTD | S No.42/1, 42/2, 42/3, 42/4A/1, 42/4A/2, 42/5, 42/6, 47/1, 50/1A, 50/2, 220/1, 201/1, 223/1 | 30-11-2024 00:00:00 |
| SIDDHIVINAYAK GARDENS | A1 BUILDCON | 991, 2, 3 And 10018 | 30-12-2024 00:00:00 |
| SHREE SHALINI | JAY SERVICE AND CONSULTANT | Cts No 251 And 252A | 30-09-2023 00:00:00 |
| M Square IT Park | Paper Flutings | A241 And A242 | 30-03-2024 00:00:00 |
| BUILDING No 1 PADMAVATI | M/s. SAI BALAJI EMRALD REALTY | Old S No 128, New S No 90, H No 3, Old S No 129, New S No 89 | 30-12-2022 00:00:00 |
| SWANAND TARANG | M/S OMKAR REALTORS | Survey No 43 Hissa No 2 | 30-12-2021 00:00:00 |
| SHREE GANESH SYMPHONY | PAWAR GROUP | S. No.172, H.No.1/8 | 01-12-2025 00:00:00 |
| TRIMURTI GARDEN | SAI NARAYAN DEVELOPERS | Survey No 126 Hissa No 1 | 30-12-2025 00:00:00 |
| Tulsi Aahan - B Wing | RAJ GROUP | S No 39, H No 1,2 | 30-12-2022 00:00:00 |
| BUILDING NO 2 MAHALAKSHMI A WING | M/s. SAI BALAJI EMRALD REALTY | Old S No 128, New S No 90, H No 3, Old S No 129, New S No 89 | 30-12-2025 00:00:00 |
| JHALAK LUXURIA PHASE I | JHALAK CONSTRUCTIONS | Gut No 48 P Plot C, Cts No. 9353 P | 30-12-2021 00:00:00 |
| THANEKAR CIVIC | SHREE SWAMI SAMARTH ENTERPRISES | S No 133, H No 2 | 09-04-2024 00:00:00 |
| SAURABH RESIDENCY | M/s Krishna Builders & Developers | S No 77 , H No 2/17 | 30-06-2024 00:00:00 |
| VED PARADISE | KULKARNI AND ASSOCIATES | 8966 | 31-12-2024 00:00:00 |
| Anantam - Phase I | Oyster Living LLP | 13/2 | 30-06-2022 00:00:00 |
| BUILDING No 2 MAHALAKSHMI B WING | M/s. SAI BALAJI EMRALD REALTY | Old S No 128, New S No 90, H No 3, Old S No 129, New S No 89 | 30-12-2025 00:00:00 |
| DASHMESH PARK | SATYAM CONSTRUCTIONS | Cts No 23409 | 31-03-2023 00:00:00 |
| SHANKESHWAR DARSHAN | KALPVRIKSH HOMES LLP | Old Sno 559 New Sno 207 Hno 1,2 Old Sno 560 New Snio 165 Hno 1Pt | 31-12-2024 00:00:00 |
| EKNATH HEIGHTS - 1 | OMKAR ENTERPRISES | Survey No 123 Hissa No 3 | 31-12-2022 00:00:00 |
| AMRUTA CHS | UTKARSHA CONSTRUCTION | 7462/70/24 | 03-06-2022 00:00:00 |
| SAI SHRUSHTI SAPPHIRE | SAI SHRUSHTI ENTERPRISES | 136/1 P Sub Plot D | 30-12-2021 00:00:00 |
| Umiya Oasis | Umiya Developers | 29 Hissa No 1 Survey No 30 Hissa 1,2,3A | 30-12-2029 00:00:00 |
| SAMBHAVI | SHREE VAKRATUNDA DEVELOPERS | Survey No 5 | 31-10-2024 00:00:00 |
| SHREE MANGAL NARAYAN RESIDENCY | N V CONSTRUCTION | Cts 9721 To9734 | 31-12-2023 00:00:00 |
| VAKRATUNDA HOMES | NARAYAN SUNIL RANE | Plot No 4,S .No 108, Hissa No 1 | 31-12-2023 00:00:00 |
| BALAJI ANNEX | M/S OM SWAYAMBHU SIDDHIVINAYAK BUILDERS AND DEVELOPERS | Survey No 93/3, 93/4, 93/5 | 30-12-2026 00:00:00 |
| ARYA ARIANA | ASHAPURA CORPORATION | 5664/A | 30-03-2024 00:00:00 |
| GAJANAN | GK BUILDCON | B63 | 30-06-2023 00:00:00 |
| Empire Industrial Centrum Phase-III | Empire Industries Limited | 22R | 30-03-2026 00:00:00 |
| Empire Industrial Centrum Phase-IV | Empire Industries Limited | 22 | 30-03-2025 00:00:00 |
| SEASONS SAHARA BUILDING NO 2 | SAMARTH SAI BUILDERS & DEVELOPERS | S No 24/2 At Village Adavli-Dhokli Taluka Ambernath And S No 34/10, 34/11, 34/12 At Village Pisavli Taluka Kalyan | 30-12-2024 00:00:00 |
| HEMANT SHISHIR CO.OP HSG | NARENDRA KALYANJI PATEL | 3512-3521 | 31-12-2023 00:00:00 |
| FORTUNE EMPORIO | QUANTA REALTY LLP | Cts No 4090 To 4096,4166 To 4171,4240,4241 New Sno 37 Hno 3C | 31-12-2025 00:00:00 |
| THE VALAJI ESTATE | FORE HOLDINGS | 4065,4093-4097,4099-4102 | 05-07-2024 00:00:00 |
| OM TANISHQ RESIDENCY | M/S LAXMI REALTY | Survey No 4, Hissa No 1A/2 | 30-03-2022 00:00:00 |
| AMAKIN MOHAMMEDIYAH PHASE 3 | AMAKIN MOHAMMEDIYAH PRIVATE LIMITED | 31/6 And 7 | 30-12-2024 00:00:00 |
| Anantam - Phase II | Oyster Living LLP | 18/12 | 30-06-2022 00:00:00 |
| RAJESHWARI RESIDENCY PHASE II | SHREE SIDDHI CONSTRUCTION | Survey No 30/2, 30/3/2/1, 30/3/2/2 | 30-03-2025 00:00:00 |
| PINNACLE ROYAL | PINNACLE INFRA | Gut No41, Hissa No 20, Plot No 15 | 30-03-2023 00:00:00 |
| KOHINOOR AASHIYANA | KGI REALTY PRIVATE LIMITED | 24/3 37/1 | 30-10-2024 00:00:00 |
| Plot No -1A,Sector -19, Vashi Truck Terminal | CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED | Plot No -1A | 31-12-2025 00:00:00 |
| JP HARMONY | JP CORP DEVELOPERS (INDIA) LLP | 129 | 31-12-2023 00:00:00 |
| Deep Royal Residency | M/s. Deepali Infracon LLP | Survey No.80 Hissa No.2 | 31-12-2023 00:00:00 |
| Shivaay Avyaan | SHREERAM BUILDCON | New Survey 7,281(Old), Hissa No.2 | 30-11-2025 00:00:00 |
| Dosti Desire - Phase 2 | D.D. Associates | 85/7 | 31-08-2027 00:00:00 |
| SHUBH MANGALAM PHASE II | SHUBH REALITY | Sr No 106 Hissa No 1 | 25-12-2026 00:00:00 |
| NAVARE PLAZA | OM DEVELOPERS | 8028 8029 8030 | 28-08-2022 00:00:00 |
| SAI HERITAGE | MITRA HOMES | Survey No 59 Hissa No 1 B | 30-03-2023 00:00:00 |
| SHREE GIRIJATMAK CO OP HOU SOC LTD | SHREE SARASWATI DEVELOPERS | Old Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/7 | 30-12-2021 00:00:00 |
| SAI LEELA | SAIJYOTBUILDERS&DEVELOPERS | Plot No 20 Sector 30D | 30-06-2024 00:00:00 |
| SHIV HEIGHTS | BALAJI DEVELOPERS | Survey No.15 Hissa No 7 | 31-03-2023 00:00:00 |
| SHREE SAI SABURI APARTMENT-BUILDING B | SHREE SAISHRADDHA ENTERPRISES | Survey No 9/3 And 16/1 | 31-03-2025 00:00:00 |
| Riverview Classic Building No 4, Phase IV | RUTU BUILDERS | S No 27, H No 5, 3/3 S No 28/ H. No 1,2,3,4/1,4/2,4/3 | 30-12-2022 00:00:00 |
| OLIVIA PRIME | SKYLINE BUILDPRO | 43/2B/3/2 | 30-06-2022 00:00:00 |
| Rai s AARAGYA | RAI RESIDENCY Private Limited | Survey No 46 Hissa No 5 And 7 | 30-12-2026 00:00:00 |
| PLATINUM SQUARE B 1 | RADMIN DEVELOPERS & CONSULTANTS PRIVATE LIMITED | 21/2,21/3/1,22/1/2,1/3,1/5,1/6,1/8 | 30-05-2025 00:00:00 |
| Aditya Nishant | PREMNARAYAN SHUKLA | 142 | 29-01-2023 00:00:00 |
| TEN X HABITAT Raymond Realty Tower J | Raymond Limited | 126B 1/1 Part, 129/1 Part | 30-06-2025 00:00:00 |
| Mount casa | Nagraj Mutha | 108B,112A/3, 113B | 31-12-2026 00:00:00 |
| Upper Thane-Casa Eden | LODHA DEVELOPERS LIMITED | 55/12 A | 31-03-2026 00:00:00 |
| OMKAR HEIGHTS | OMKAR BUILDERS & DEVELOPERS | Cts No 1148 | 31-03-2024 00:00:00 |
| Vrundavan Dham | Shikhar Lifespaces | S.No 13, H No. 1 P | 31-12-2023 00:00:00 |
| Riverwood Park Building No -3 | Shree Khidkaleshwar Property Developers Pvt. Ltd. | 26/2, 26/3 All In Parts | 30-06-2026 00:00:00 |
| VISHWAJEET EMPIRE NX | GULABRAO BABURAO KARANJULE PATIL | Survey No 39 Hissa No 2A, Hissa No 2B, Hissa No 2C And Hissa No 2D | 23-06-2026 00:00:00 |
| Chandrakant Residency | Amogh Construction | C.T.S No- 2 To 8 & C.T.S No- 169 To 178, C.T.S No- 295 To 300 | 31-12-2027 00:00:00 |
| Daisy Gardens Building No.13 | ANKITA BUILDERS | Survey No 9, Hissa No 2A | 30-06-2026 00:00:00 |
| MADHUSUDAN RETREAT TERRACES | MADHUSUDAN LEISURE HOMES | Survey No 50 | 31-12-2026 00:00:00 |
| NANA PATIL ROYAL | M/S. J. R. Y. ENTERPRISES | Pardi No 3/1, 3/2 | 30-09-2022 00:00:00 |
| Elite 2 Shops | Lodha Developers Limited | 97 Pt 150/4 Pt | 31-07-2020 00:00:00 |
| Elite 1 Shop | Lodha Developers Limited | 96/2 Pt, 97 Pt | 31-07-2020 00:00:00 |
| JAY RESIDENCY | MUKESH VITHAL GITE | S.No. 111/H.No. 2/1/3/5 | 31-12-2024 00:00:00 |
| SEVEN HEIGHTS | OVAIS MUDABBIR BARDI | S No 15/1 20/2 Plot No 4 And Cts No 3838 | 31-12-2025 00:00:00 |
| Jardino A | LODHA DEVELOPERS LIMITED | 62/2 P, 62/3 P And 65/5C P | 31-08-2027 00:00:00 |
| TIARA | Sagar Enterprise | S No 20 And Chalta No 24 | 30-03-2024 00:00:00 |
| METRO AANGAN PHASE - I | METRO CREATORS | S No 78 H No 7 P And 8 P | 30-12-2028 00:00:00 |
| PRAKRUTI SPARSH | AVISHKAR BUILDCON | S No 49, H No 10D | 30-12-2022 00:00:00 |
| SAI CITY | OM SAI BUILDERS & DEVELOPERS | Survey No.3/1/E,3/1/D,3/1/C | 31-12-2031 00:00:00 |
| MARATHON NEXTOWN JASPER | MARATHON ENER-GEN | 140,141/2,141/1,142/3,220/1B | 31-12-2027 00:00:00 |
| Shyam Park | Vishnu Shyamlal Sachdev | Cts . No. 20770 | 31-12-2025 00:00:00 |
| Panvelkar Empire | Om Sai Shraddha Developers | Survey No. 30/4 (P) | 30-06-2026 00:00:00 |
| OM SAI ONE PARK | INFINI DEVELOPERS | Cts 133/3 133/4 134/3 134/5 134/9 134/10 134/11 134/4/A 138/13/A 138/13/B 138/13/C | 31-12-2028 00:00:00 |
| RAI s VRUNDAVAN | RAI RESIDENCY Private Limited | Survey No 64 Hissa No 2 | 30-12-2023 00:00:00 |
| TAKSHILA RESIDENCY | DELUX ASSOCIATES | S No 157/13Pt S No 158/1Pt Plot No 1 And 2 | 30-12-2023 00:00:00 |
| OM RAMCHANDRA | LAXMI DEVELOPERS | Gaothan Chalata No 109 House No 380 | 30-11-2020 00:00:00 |
| Regalia Shops | Lodha Developers Limited | 96/2 Pt, 100/2 Pt | 31-07-2020 00:00:00 |
| Urbano 2 Shops | Lodha Developers Limited | 52 Pt ,And 144/9 Pt | 31-07-2020 00:00:00 |
| NEW SHIV-SHAKTI CHS | SHREE LAXMI DEVELOPERS | Plot 83 S No 70 | 30-03-2023 00:00:00 |
| The Universe Neptune - B | Gayasuddin Riyazuddin Khan | S No 112/1 | 30-06-2024 00:00:00 |
| SIYARA FORTUNE BUILDING A WING B | SHAKTI REALTY | 8145, 8146, 8153, 8172, 8176 To 8202 | 31-12-2027 00:00:00 |
| Satyaneelayam Co Op HSg Society | YASH INFRA | 749 B | 31-12-2025 00:00:00 |
| Upper Thane-IRIS Wing A | LODHA DEVELOPERS LIMITED | 293/1 And 293/3 | 31-12-2027 00:00:00 |
| JIVDANI BUILDING | MILDSTONE ENTERPRISES LLP | 1332 | 31-12-2024 00:00:00 |
| YASHRAJ HEIGHTS | VIKRANT VIKAS RAIKAR | 7 | 31-01-2025 00:00:00 |
| Belvedere-B and C | LODHA DEVELOPERS LIMITED | 212/7A Part 212/7B Part 212/7C Part 212/7D Part 212/7E Part 25/2A(Part) 25/2B(Part) 25/4(Part) | 30-11-2027 00:00:00 |
| SAI DREAM ONE | GLS INFRASTRUCTURES | S No.88, H No 6 & 7 | 31-12-2025 00:00:00 |
| NEELKANTH PALM AVENUE | NEELKANTH INFRATECH | Plot No-23 & 24, Sector-09 Ghansoli | 29-12-2029 00:00:00 |
| FENKIN EMPIRE | FEN-KIN REALTORS & PROJECT PVT LTD | Cts No 313 And 314B | 31-07-2023 00:00:00 |
| Sai Pearl | M/S MITRA REALITY | S No 67 H No 3 | 31-12-2025 00:00:00 |
| BARADIA EKDANT | BARADIA REALTY | Cts No 259,260 | 22-07-2026 00:00:00 |
| SAJAN SHANTARAM HEIGHT | TIRUPATI DEVELOPERS | New Survey No.1 Hissa No 11 | 30-06-2021 00:00:00 |
| Ram Janaki | Shree Ganesh Enterprises | 4947 To 4952 | 30-12-2026 00:00:00 |
| APPLE PARADISE | APPLE PARADISE | U No 99,100, Plot No 262 Part | 01-01-2019 00:00:00 |
| AKANKSHA CO. OP. HSG. SOC. LTD. | KRISHNA BUILDCON | S.No.48, H. No.6(P) | 31-12-2026 00:00:00 |
| VRINDAVAN CITY PHASE -1 | VANDU BUILDER LLP | Survey No. 67/4/A,4/B,4/C,4/D | 31-12-2030 00:00:00 |
| SADHANA SOCIETY | Shree Sai Laxmi Builders and Developers | 13/1728 | 31-03-2027 00:00:00 |
| DASHMESH PEARL | EMPIRE REALTY | Survey No 5, Hissa No 30/B, Plot No 2 To 4 | 30-12-2026 00:00:00 |
| Clara Shops | Lodha Developers Limited | 144 4 Pt 144 9 Pt | 31-07-2020 00:00:00 |
| EMERALD | APR REALTY | 3/7A | 30-11-2024 00:00:00 |
| HUBS INFRASTRUCTURE | HUB'S INFRASTRUCTURE | 110/1/A/1/B/7 | 30-06-2024 00:00:00 |
| ROCK MOUNT RESIDENCY | BUILT CHARMS | 46/6/A 46/1/A/5 46/1/A/3/4/6 47/2/A | 30-06-2026 00:00:00 |
| CHANDRABHAGA HEIGHTS | JAI SANTOSHI MATA CONSTRUCTION BUILDERS AND DEVELOPERS | S. No. 157 | 31-07-2024 00:00:00 |
| EKATVA SIGNET | Bhoomi Developers | Tikka No.15 Cts No.39/A/1/B Pt | 31-12-2023 00:00:00 |
| SHETH SUPREME | SHETH BUILDERS PRIVATE LIMITED | Old Survey No 159 Pt And New Survey No 20 Pt | 30-12-2024 00:00:00 |
| ONE AKSHAR | AKSHAR REALTORS | Plot No 7 | 30-12-2026 00:00:00 |
| VEDANT KALASH | SHIVALIK DEVELOPERS | Survey No 48 Hissa No 2 Plot No 5 And 6 | 30-03-2022 00:00:00 |
| MAHADEV HEIGHTS | ONBV REALITY | S. No. 1/3/B/1 & S.No. 1/3/B/11 | 31-12-2026 00:00:00 |
| PRITHVI PRIDE BUILDING NO 2 | PRITHVI LAND DEVELOPERS | Sno 220 | 31-12-2028 00:00:00 |
| ELANZA WING B | STONEWALL BUILDCON LLP | (Old) Survey No. 462 Hissa No 4 And 7, (New) Survey No. 138 Hissa No 4 And 7 | 31-03-2027 00:00:00 |
| Haware Paramount Kalyan Phase-II | Haware Properties LLP | Survey No. 3/2 (Pt), 3/5 (Pt) | 31-12-2028 00:00:00 |
| MANOVI PRITHVI | MANOVI PRITHVI | S. No. 217 H. No.3/H Plot No. 7 | 31-05-2024 00:00:00 |
| SARVODAY SYMPHONY | SWASTIK REALTORS | Survey No 91 Old 25New Hissa No 1 Survey 92 Old 3 New Hissa No 3 | 30-06-2026 00:00:00 |
| Pitrukrupa | Mellennium Realty | Old Survey No 326/A New Survey No 229/Part Plot No 33 Cts No 680 And681 | 31-03-2023 00:00:00 |
| Lakeside 1 Shops | Lodha Developers Limited | 150/6 Pt 150/9 Pt 73/1 Pt 73/2 Pt | 31-07-2020 00:00:00 |
| Lakeside 2 Shops | Lodha Developers Limited | 69/1 Pt, 69/2 Pt,150/8 Pt | 31-07-2020 00:00:00 |
| PRITAM SOLITAIRE | JAYESH PRAMODBHAI THAKKAR | Survey No 44A Hissa No 1/1B Part | 30-12-2025 00:00:00 |
| Mavis Tower A wing From 5th floor to 7th Floor | M/s. Unit Arsen Developers (Joint Venture) | 431C Part | 31-12-2019 00:00:00 |
| INFINITE RESIDENCY | MISTRY CONSTRUCTION CO. PVT. LTD. | Pocket D And E | 30-06-2029 00:00:00 |
| MANSIPOOJA HEIGHT | S K INFRASTRUCTURE | Survey No 3 Hissa No 6 | 30-03-2023 00:00:00 |
| SEASONS PARK | SHREE BALAJI HOMES | S No 49 H No 4/A, 4/B,6/D | 30-12-2022 00:00:00 |
| Amrut Siddhi | Jayshree Builders | 40/2 40/3 40/4 40/5A 40/6 40/7 41/3 41/4A 41/4B 41/4C | 30-12-2023 00:00:00 |
| Shreeram Residency | Raghunath Kedari Phadtare | 690/3 | 30-12-2025 00:00:00 |
| JAGJEET ENCLAVE | JAGJEET SHRUSTI REALTORS | 29/1/C | 04-05-2024 00:00:00 |
| ZUNERA HEIGHTS | 786 MICRON BUILDERS & DEVELOPERS | 101/ 2 3 4 5 12 | 30-12-2022 00:00:00 |
| Tulsi Aagman | RAJ GROUP | S No 36 H No-1,2,3 S No-37 H No-1 S No-40 H No-5 | 30-04-2025 00:00:00 |
| Raheja Solaris-1 | Raheja Universal (Pvt.) Ltd. | Gen-2/1/B | 30-12-2026 00:00:00 |
| SHREE VIGHNESHWAR HEIGHTS | MAHESH SHYAMSUNDAR GOYAL | 114/5/3/3,115/1,115/2 | 31-03-2027 00:00:00 |
| VAIBHAV HORIZON | Vaibhav Siddhi Construction Co. | 563 4 Pt/4 Pt/4 Pt | 24-09-2023 00:00:00 |
| ARAMUS RESIDENCY | ARAMUS REALTY LLP | 34A | 30-12-2023 00:00:00 |
| Palava Florea - A to D | Lodha Developers Limited | 61 Pt 62 Pt Village Khoni | 31-07-2023 00:00:00 |
| MOUNTAIN VIEW | MADHAV BUILDSPACE | Survey No 10 Hissa No 10/3 | 30-06-2029 00:00:00 |
| JAGDAMBA CO OP HOUSING SOCIETY LTD | SAI CONSTRUCTION | Survey No. 26/2/A/30, Plot No. 28 Village Shirgaon | 31-12-2027 00:00:00 |
| Sankheshwar Plaza | VNG Enterprises | Survey No 50/3 | 31-12-2026 00:00:00 |
| SHREE GAYATRIDEEP | OM SAI CONSTRUCTION | S. No. 48, H. No. 4, P. No.1 | 30-04-2027 00:00:00 |
| Chandraprabha Heights | Adwait constructions | Cts No . 11963 To 11967 | 30-06-2022 00:00:00 |
| SAI DARSHAN - F | SHREE SAI ASSOCIATES | Gut No.112/A | 30-06-2022 00:00:00 |
| Lodha iThink B | Lodha Developers Limited | 166 1Bpt | 28-02-2022 00:00:00 |
| NEELKANTH PALM PRESIDENT | NEELKANTH INFRATECH | Plot No 10 Sectot 11 Ghansoli | 31-12-2029 00:00:00 |
| Garden Estate Phase -II | SHREE BALAJI DEVELOPERS | Survey No. 46, Hissa No. 12/1 | 31-03-2025 00:00:00 |
| Parvati Niwas | AADARSH DEVELOPERS | Cst No 27/1B, 27/1C Tikka No 22 | 31-12-2025 00:00:00 |
| Purva | GNP DEVELOPERS | 58/66/14C And 58/66/15 Plot No 14 And 15 | 31-12-2019 00:00:00 |
| Foresta & Fiora | Lodha Developers Limited | 53/3,65/15A, 65/15B | 28-08-2023 00:00:00 |
| Runwal Gardens Phase 4 Bldg No. 33-34 | Runwal Residency Private Limited | Survey Nos 4/5Pt, 5/1Pt, 5/2Pt, 5/3Pt, 5/4Pt, 5/5Pt | 30-06-2025 00:00:00 |
| SAHARA RESIDENCY | SAHARA RESIDENCY | Survey No 20 Hissa No 9 | 31-12-2024 00:00:00 |
| KRISHNA GALAXY | KRISHNA BUILDERS & DEVELOPERS | Survey No 42 Hissa No 2 | 30-06-2023 00:00:00 |
| VILLA SMARAN | OM VILLA BUILDTECH LLP | Cts No 1194E And Cts No 1194A Sector 29 | 30-03-2024 00:00:00 |
| Virat Mansion | Neelyog Developers | Cts No 9907,9908 To 9913 | 30-12-2022 00:00:00 |
| Deep Jyot | Deep Realtors | S.No.63, H. No.3 | 30-06-2023 00:00:00 |
| PRINCE AVENUE | SHAKTI DEVELOPERS | Survey Number 15 Hissa 4A 4B | 02-09-2023 00:00:00 |
| Savitri Smruti | Adwait constructions | 9028A , 9029 To 9031 | 30-06-2022 00:00:00 |
| North MLCP Shop | Lodha Developers Limited | 98 Pt | 31-07-2020 00:00:00 |
| Runwal Gardens Phase 2 Bldg no 13-17 | Runwal Residency Private Limited | Survey Nos. 9/1 To 9/8Pt, 12/7Pt, 12/8Pt, 12/9Pt, 12/10Pt, 12/11Pt, 12/12Pt,12/13Pt, 14/2Apt 14/2B Pt 14/4Pt | 30-06-2025 00:00:00 |
| SHUBHAM RESIDENCY | SHUBHAM REALTY | Plot No 79,Sector 21 | 30-06-2025 00:00:00 |
| SHREE MAHALAXMI RESIDENCY | SHREE GAJANAN BUILDERS AND DEVELOPERS | S No 93 / H No A, S No 94 | 31-07-2028 00:00:00 |
| Thane Project | LODHA DEVELOPERS LIMITED | 144/1 Part | 31-07-2029 00:00:00 |
| Vardhaman Enclave | Vardhaman Builders | 260/3 | 31-12-2025 00:00:00 |
| REGENCY SARVAM PHASE 13 | REGENCY NIRMAN LTD | Mauje - Manda S No42/1,42/2,42/3,42/4A/1, 42/4A/2,42/5,42/6, 47/1,50/1A,50/2, Mauje - Titwala S No201/1,220/1,223/1 | 31-12-2025 00:00:00 |
| Raheja Lunaris-1 - Callisto | Raheja Universal (Pvt.) Ltd. | Plot No. Gen-2/1/B Part-1 | 31-12-2030 00:00:00 |
| 9PBR TOWER C2 | MISTRY CONSTRUCTION CO. PVT. LTD. | Pocket D & E Sector -60, Nerul | 31-12-2028 00:00:00 |
| S.S. RESIDENCY | AL SIRAJ CONSTRUCTION | 106 | 31-12-2025 00:00:00 |
| Sunteck FORESTWorld 3 | SUNTECK REALTY HOLDINGS PVT LTD | 311Pt | 31-12-2026 00:00:00 |
| Swanand Bliss Phase - II | M/S NITYANAND REALTORS | Survey No. 58 Hissa No. 4/3 | 30-06-2025 00:00:00 |
| Shiv Aangan Residency | DHANANJAY DEVELOPERS | Survey No 40 Hissa No 5/2 And 5/6 | 30-03-2025 00:00:00 |
| NANA PATIL RESIDENCY | QUALITY BUILDERS & DEVELOPERS | Pardi No 3, Hissa No 1, Hissa No 2 | 31-01-2021 00:00:00 |
| SATYAM ORCHID | GIRIJA INFRASTRUCTURE | Plot No 10 | 30-12-2021 00:00:00 |
| Vardhaman Tower Building Nos. 6 & 7 | Vardhaman Property Developers | Plot Bearing Surveyno.26Hissa No1(Part) | 31-12-2023 00:00:00 |
| ZIRCON HEIGHTS | IQBAL ABDUL RAUF PUNJABI | 59/1, 83/5 Paiki, Cts No 4829 | 31-12-2024 00:00:00 |