Project overview
Satyam Solaris is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800035156. Satyam Solaris is located at Deonar, Cts Number 254 B. This is a New being developed by Bm Infra.
Satyam Solaris has 2 BHK, 3 BHK & 4 BHK Apartments with carpet areas ranging from 1191 to 940 Sq.ft. Carpet. The Project has total 67 of which 53 are currently available for sale.
Satyam Solaris is being developed on a total land area of 26996 Sq.ft. out of which 2713 Sq.ft. i.e 10% is reserved for recreational purposes. Satyam Solaris has 2 Wings / Towers Wing A Commercial,Wing B
| Project | Developer | Location | Possession |
-
Project:
Satyam Solaris
-
Location:
-
Deonar, Cts Number 254 B
-
Const. Stage:
New
-
Possession:
31 Dec 2024
-
Developer:
Bm Infra
-
Phone:
-
Address:
-
Jayshree House
| MAHA REARA No: |
P51800035156 |
| Project Type |
Others |
| RERA Project Status |
New |
| Architect |
Shashikant Laxman Jadhav |
| Funding Bank |
ICICI BANK LIMITED |
| Proposed Possession |
31 Dec 2024 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
10 May 2022 |
| Last Retrived |
26 Jul 2025 |
Satyam Solaris QR Code
Satyam Solaris
MahaRERA - P51800035156
| Type | Area |
| Office space | 153.63 Sq.mts. ( 1654 Sq.ft. ) |
| Office space | 170.95 Sq.mts. ( 1840 Sq.ft. ) |
| STORE | 9.5 Sq.mts. ( 102 Sq.ft. ) |
| STORE | 14.01 Sq.mts. ( 151 Sq.ft. ) |
| 2 BHK | 50 Sq.mts. ( 538 Sq.ft. ) |
| 3 BHK | 78.09 Sq.mts. ( 841 Sq.ft. ) |
| 3 BHK | 78.75 Sq.mts. ( 848 Sq.ft. ) |
| 3 BHK | 86.94 Sq.mts. ( 936 Sq.ft. ) |
| 3 BHK | 87.36 Sq.mts. ( 940 Sq.ft. ) |
| 4 BHK | 110.63 Sq.mts. ( 1191 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Satyam Solarislast updated on 26 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
As Per Requirment |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Provided Along With Genset |
|
|
|
As Per Drawing |
Fire Protection And Fire Safety
Requirements40% completed
|
|
As Per Cfo |
Landscaping & Tree Planting
|
|
As Per Requirement |
|
|
|
As Per Requirmet |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
As Drainagr Noc |
Solid Waste Management And Disposal
|
|
As Per Requirement |
Storm Water Drains60% completed
|
|
As Per Mpe Drawings |
|
|
|
As Per Requirement |
Treatment And Disposal Of Sewage And Sullage Water
|
|
As Per Sanction |
Water Conservation, Rain water Harvesting
|
|
As Per Drawing |
|
|
|
Bmc And Borewell |
Buildings / Wings in Satyam Solaris
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Satyam Solaris by Bm Infralast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
67
apartments in total
Saleable Area Statistics (Sq. ft.)
55160
Total
Total 67 apartments in project. 14 apartments booked. 20% apartments booked.
Total 55160 Sq.ft. saleable area. 9418 saleable area booked.
17% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing A Commercial | Dec 2024 | 4 | 1 | 2 | 0 | 3 | 0 | 15 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| Office space | 153.63 Sq.mts. ( 1654 Sq.ft. ) | 1 | |
| Office space | 170.95 Sq.mts. ( 1840 Sq.ft. ) | 1 | |
| STORE | 9.5 Sq.mts. ( 102 Sq.ft. ) | 1 | |
| STORE | 14.01 Sq.mts. ( 151 Sq.ft. ) | 1 | |
4 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Wing A Commercial | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing B | Dec 2024 | 17 | 1 | 2 | 1 | 3 | 0 | 96 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 2 BHK | 50 Sq.mts. ( 538 Sq.ft. ) | 16 | |
| 3 BHK | 78.09 Sq.mts. ( 841 Sq.ft. ) | 10 | |
| 3 BHK | 78.75 Sq.mts. ( 848 Sq.ft. ) | 6 | |
| 3 BHK | 86.94 Sq.mts. ( 936 Sq.ft. ) | 20 | |
| 3 BHK | 87.36 Sq.mts. ( 940 Sq.ft. ) | 10 | |
| 4 BHK | 110.63 Sq.mts. ( 1191 Sq.ft. ) | 1 | |
63 total apartments / 14 apartments booked. 22% apartments booked. |
| Work Description in Building Wing B | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
Channel Partners Registered by Developer
Bm Infra
for Project
Satyam Solaris
last updated on
26 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |