Project overview

Satyam Sheela is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700000943. Satyam Sheela is located at Sno 73-1B And 72-4. This is a Ongoing being developed by Shree Satyam Group.

Satyam Sheela has 1 BHK Apartments with carpet areas ranging from 269 to 269 Sq.ft. Carpet. The Project has total 340 of which 145 are currently available for sale.

Satyam Sheela is being developed on a total land area of 72334 Sq.ft. out of which 7213 Sq.ft. i.e 10% is reserved for recreational purposes. Satyam Sheela has 3 Wings / Towers Type A Wing A-B,Type B Wing C-D-E,Type C Wing F-G-H

ProjectDeveloperLocationPossession
Jeevan LifestylesJeevan EnterprisesS N 148 / 13/1531-03-2019 00:00:00
Marathon Nagari Nx Vigo DMarathon Realty Pvt Ltd79/3Pt. 83/10Pt.30-06-2019 00:00:00
Marathon Nagari Nx Vitoria DMarathon Realty Pvt Ltd79/3Pt. 83/10Pt.31-12-2019 00:00:00
Vedant VastuVedant VentureSurvey No. 63, Hissa No. 4A8, Plot No. 831-12-2018 00:00:00
Panvelkar Estate - RockfordVijay Ramchandra PanvelkarSurvey No 43 Survey No 44 Hissa No 2 Survey No 44 Hissa No 331-12-2019 00:00:00
Satyam SheelaShree Satyam GroupSno 73-1B And 72-430-12-2022 00:00:00
Prachi ResidencyPrachi DevelopersS No 42 H No 1A Plot 4 And S No 42 H No 230-12-2024 00:00:00
Shree Viraj Residency Wing C Phase -IiShree Viraj EnterprisesSurvey No 63 H No 5A Plot No 1 To 7, Survey No 63 H No 630-12-2022 00:00:00
Shiv ParadiseShiv CorporationPlot No 14 & 15 S No 45 H No 1/A/17 And 1 /A/1831-12-2025 00:00:00
Shivshakti OasisShivshakti Genesis71/531-12-2026 00:00:00
Satyam Sheela Wing FShreeji DevelopersSurvey No 72/4 And Survey No 73/1/B, Shirgaon,Badlapur-42150331-07-2026 00:00:00
Pg VatikaGurukrupa EnterprisesSurvey No 45 Hissa No 1 And 2 Village Mankivali, Badlapur East Ambernath Thane 42150331-12-2026 00:00:00
Saishyam ArcadeShubh BuildspaceSurvey No 20, Hissa No 2,431-12-2025 00:00:00
Panvelkar Estate - Stanford - Phase-IiPanvelkar Infrastructures Private LimitedSurvey No 42 H No 125-05-2022 00:00:00
Padmaprabha Co Op Hsg SocietyShree Mahaveer EnterprisesSurvey No 46 Plot No 23 24 H No 6A9 6A10 P30-04-2018 00:00:00
Jijabai ParkDnyaneshwar Mauli Builder & Developers83/1031-12-2018 00:00:00
Raj HeightBhavani Enterprises98/131-12-2019 00:00:00
Dev LuxuriaDev VenturesSurvey No-74 Hissa No 530-06-2019 00:00:00
Parijatak Phase I A And B WingVarad BuildersSno.44/1/A/2 Sno.46H No.6/A/8 Plot 22 Sno 46 Hno.6/A/9 Plot No 23Sno 46 H No 6/A/10 Plot No 2430-06-2025 00:00:00
Kartik HomesKartik EnterprisesS No 74 H No 2 S No 74 H No 331-12-2024 00:00:00
Om Yashwant PlazaOmprakash Ramchandra PandeyS.No.97B, H.No.131-12-2018 00:00:00
Kalp NisargBls Ventures81/3A 3B30-03-2022 00:00:00
Aryan One Wing I And JKonark Lifespaces701,702,711,751,752,753,755,761,762,763,77,783,799,791031-10-2018 00:00:00
Aryan One Wing G And HKonark Lifespaces70/1,70/2,71/1,75/1 ,75/2,75/3,75/5,75/6,76/1,76/2,76/3,77,78/3,79/9,79/1031-07-2018 00:00:00
Mohan Willows IMohan Lifespaces Llp66,67/1A,67/Ib30-06-2018 00:00:00
Nav Balaji Co-Op Hsg. Soc. Ltd.Ruturaj DevelopersSurvey No 29/A31-12-2025 00:00:00
Mauli ParkM/S. Mauli DevelopersSurvey No 83 Hissa No 1531-03-2028 00:00:00
Shiv Paradise Wing CShiv CorporationPlot No 14 & 15 Village Shirgaon, Survey No 45 H No 1/A/17 & 1/A/18, Survey No 45 H No 1/B31-12-2026 00:00:00
Surval HeightsGayatri DevelopersSurvey No 46 H No 11/12 And S No 83 H No 7/831-12-2023 00:00:00
Sarveshwar Co-Op Hsg SocDalal BuildscapeTaluka Ambernath30-06-2024 00:00:00
Panvelkar Estate - Stanford - Phase Ii - R1 - BPanvelkar Infrastructures Private LimitedSurvey No 42 Hissa No 131-12-2024 00:00:00
Sharmila ResidencyAnnapurna Enterprises46, Hissa No 331-03-2025 00:00:00
Panvelkar Estate - Greenford - E WingPanvelkar Infrastructures Private LimitedSurvey No 42 Hissa No 2 And 331-12-2025 00:00:00
Audumbar DarshanAudumbar EnterprisesSurvey No 55 H No 3/A/10 Plot No 231-01-2024 00:00:00
Arihant Anmol Phase IiArihant Vatika Realty Private LimitedSurvey No. 67, 68 And 6930-09-2020 00:00:00
Mohan Willows IiMohan Lifespaces Llp6431-12-2018 00:00:00
Surval HeightsGayatri DevelopersSr No 46 H No 11 And 12 S No 83 H No 7 And 831-12-2018 00:00:00
Ved HeightsOm RealityS.No. 96, H. No. 231-12-2026 00:00:00
Ram RiveraS No 29/A/3 Plot No 13 And 1430-09-2025 00:00:00
Park One Phase IiShree Laxmi EnterprisesSurvey No. 125, H.No. 1/A31-12-2027 00:00:00
Project Details
  • Project:
    Satyam Sheela
  • Location:
  • Sno 73-1B And 72-4
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    Shree Satyam Group
  • Phone:
  • Address:
  • Satyam
Project RERA Details
MAHA REARA No: P51700000943
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Raj Associates Partner Mr Sandhya Rajesh Khambayat
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 30 Dec 2022
Revised Possession 30 Dec 2022
Extended Possession
Litigations No Litigations
Last Modified 25 Jul 2017
Last Retrived 26 Jul 2025
Satyam Sheela QR Code
Satyam Sheela
MahaRERA - P51700000943
Apartment Details & Configuration
TypeArea
1RK19.26 Sq.mts. ( 207 Sq.ft. )
1RK19.28 Sq.mts. ( 208 Sq.ft. )
1RK19.33 Sq.mts. ( 208 Sq.ft. )
1RK19.35 Sq.mts. ( 208 Sq.ft. )
1RK19.65 Sq.mts. ( 212 Sq.ft. )
1RK19.75 Sq.mts. ( 213 Sq.ft. )
1RK20.62 Sq.mts. ( 222 Sq.ft. )
1 BHK25 Sq.mts. ( 269 Sq.ft. )
1 BHK26.4 Sq.mts. ( 284 Sq.ft. )
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )
1 BHK27.21 Sq.mts. ( 293 Sq.ft. )
1 BHK28.13 Sq.mts. ( 303 Sq.ft. )
1 BHK28.66 Sq.mts. ( 308 Sq.ft. )
2 BHK39.1 Sq.mts. ( 421 Sq.ft. )
2 BHK39.56 Sq.mts. ( 426 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Satyam Sheelalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Completed
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Work Completed
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed For Wing A-B-C-D-E
Landscaping & Tree Planting100% completed
95% Complete
Work Completed
Open Parking100% completed
95% Complete
Work Completed For Wing C-D-E
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Septic Tank Until Drainage Line Is Laid By Kbmc
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting100% completed
95% Complete
Completed For Usage Of Wing A- B-C-D-E
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Work Completed For Wing A-B-C-D-E
Water Supply100% completed
95% Complete
Supply From Maharashtra Jeevan Pradhikaran
Buildings / Wings in Satyam Sheela
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Satyam Sheela by Shree Satyam Grouplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

72334 Sq. ft.

Project Area

7213 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

340 apartments in total
Total
340
Booked
195
Available
145

Saleable Area Statistics (Sq. ft.)

89222 Total
Total
89222
Booked
46754
Available
42469
Total 340 apartments in project. 195 apartments booked. 57% apartments booked.
Total 89222 Sq.ft. saleable area. 46754 saleable area booked.
52% area booked.

Type A Wing A-B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type A Wing A-BJan 190081010200
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK19.26 Sq.mts. ( 207 Sq.ft. )16
16 Booked100% Booked
100% Booked
1RK19.28 Sq.mts. ( 208 Sq.ft. )14
14 Booked100% Booked
100% Booked
1RK19.33 Sq.mts. ( 208 Sq.ft. )48
48 Booked100% Booked
100% Booked
1RK19.35 Sq.mts. ( 208 Sq.ft. )16
16 Booked100% Booked
100% Booked
1RK19.65 Sq.mts. ( 212 Sq.ft. )16
15 Booked93% Booked
93% Booked
1RK19.75 Sq.mts. ( 213 Sq.ft. )16
16 Booked100% Booked
100% Booked
1RK20.62 Sq.mts. ( 222 Sq.ft. )8
8 Booked100% Booked
100% Booked
134 total apartments / 133 apartments booked. 99% apartments booked.
Work Description in Building Type A Wing A-BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Type B Wing C-D-E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type B Wing C-D-EDec 202191010206
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25 Sq.mts. ( 269 Sq.ft. )16
11 Booked68% Booked
68% Booked
1 BHK26.4 Sq.mts. ( 284 Sq.ft. )18
13 Booked72% Booked
72% Booked
1 BHK27.12 Sq.mts. ( 292 Sq.ft. )17
12 Booked70% Booked
70% Booked
1 BHK27.21 Sq.mts. ( 293 Sq.ft. )9
6 Booked66% Booked
66% Booked
1 BHK28.13 Sq.mts. ( 303 Sq.ft. )8
6 Booked75% Booked
75% Booked
1 BHK28.66 Sq.mts. ( 308 Sq.ft. )9
7 Booked77% Booked
77% Booked
2 BHK39.1 Sq.mts. ( 421 Sq.ft. )9
2 Booked22% Booked
22% Booked
2 BHK39.56 Sq.mts. ( 426 Sq.ft. )18
5 Booked27% Booked
27% Booked
104 total apartments / 62 apartments booked. 59% apartments booked.
Work Description in Building Type B Wing C-D-ECompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Type C Wing F-G-H

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type C Wing F-G-HJan 190091010201
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25 Sq.mts. ( 269 Sq.ft. )102
None Booked0% Booked
0% Booked
102 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Type C Wing F-G-HCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Shree Satyam Group
for Project
Satyam Sheela
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation