Project overview

Satyam is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800045715. Satyam is located at 73/1 To 3, 73. This is a New being developed by Poddar Infracon Private Limited.

Satyam has 1 BHK & 2 BHK Apartments with carpet areas ranging from 451 to 806 Sq.ft. Carpet. The Project has total 39 of which 10 are currently available for sale.

Satyam is being developed on a total land area of 11390 Sq.ft. Satyam has 1 Wings / Towers Satyam

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Satyam
  • Location:
  • 73/1 To 3, 73
  • Const. Stage:
    New
  • Possession:
    31 Aug 2025
Developer Details

  • Developer:
    Poddar Infracon Private Limited
  • Phone:
  • Address:
  • Shah Industrial Estate
Project RERA Details
MAHA REARA No: P51800045715
Project Type Residential / Group Housing
RERA Project Status New
Architect Niten P Dedhia
Funding Bank HDFC BANK
Proposed Possession 31 Aug 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 06 Jun 2022
Last Retrived 26 Jul 2025
Satyam QR Code
Satyam
MahaRERA - P51800045715
Apartment Details & Configuration
TypeArea
1 BHK41.93 Sq.mts. ( 451 Sq.ft. )
2 BHK54.88 Sq.mts. ( 591 Sq.ft. )
2 BHK60.77 Sq.mts. ( 654 Sq.ft. )
2 BHK61.45 Sq.mts. ( 661 Sq.ft. )
2 BHK68.7 Sq.mts. ( 739 Sq.ft. )
2 BHK71.3 Sq.mts. ( 767 Sq.ft. )
2 BHK74.88 Sq.mts. ( 806 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Satyamlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
0
Energy management
Na
Fire Protection And Fire Safety Requirements
0
Landscaping & Tree Planting
0
Open Parking
0
Sewerage (Chamber, Lines, Septic Tank , STP)
0
Solid Waste Management And Disposal
0
Storm Water Drains
0
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
0
Water Supply
0
Buildings / Wings in Satyam
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Satyam by Poddar Infracon Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

11390 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

39 apartments in total
Total
39
Booked
29
Available
10

Saleable Area Statistics (Sq. ft.)

25843 Total
Total
25843
Booked
19364
Available
6479
Total 39 apartments in project. 29 apartments booked. 74% apartments booked.
Total 25843 Sq.ft. saleable area. 19364 saleable area booked.
75% area booked.

Satyam

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
SatyamAug 202513101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK41.93 Sq.mts. ( 451 Sq.ft. )6
3 Booked50% Booked
50% Booked
2 BHK54.88 Sq.mts. ( 591 Sq.ft. )6
6 Booked100% Booked
100% Booked
2 BHK60.77 Sq.mts. ( 654 Sq.ft. )8
7 Booked87% Booked
87% Booked
2 BHK61.45 Sq.mts. ( 661 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK68.7 Sq.mts. ( 739 Sq.ft. )7
6 Booked85% Booked
85% Booked
2 BHK71.3 Sq.mts. ( 767 Sq.ft. )9
5 Booked55% Booked
55% Booked
2 BHK74.88 Sq.mts. ( 806 Sq.ft. )2
2 Booked100% Booked
100% Booked
39 total apartments / 29 apartments booked. 74% apartments booked.
Work Description in Building SatyamCompletion
Basement (if any)
work-in-progress90% done
90% Booked
Excavation
work-in-progress95% done
95% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress20% done
20% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
work-in-progress90% done
90% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress70% done
70% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress85% done
85% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress90% done
90% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress65% done
65% Booked
Channel Partners
Channel Partners Registered by Developer
Poddar Infracon Private Limited
for Project
Satyam
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation