Project overview

Satya Jeevan Co.-Op. Hsg. Society is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700012181. Satya Jeevan Co.-Op. Hsg. Society is located at Thane, 421004. This is a On-Going Project being developed by Mrp Infrastructure.

Satya Jeevan Co.-Op. Hsg. Society has GARAGE 01, GARAGE 02, GARAGE 03, GARAGE 04, GARAGE 05, GARAGE 06, GARAGE 07, RESIDENTIAL, SHOP 01, SHOP 02, SHOP 03, SHOP 04, SHOP 05, SHOP 06 & SHOP 07 Apartments with carpet areas ranging from 230 to 570 Sq.ft. Carpet. The Project has total 34 of which 15 are currently available for sale.

Satya Jeevan Co.-Op. Hsg. Society is being developed on a total land area of 7176 Sq.ft. Satya Jeevan Co.-Op. Hsg. Society has 1 Wings / Towers Satya Jeevan Co Op Hsg Society

ProjectDeveloperLocationPossession
Sai Majestic ParkMaruti Developers2341331-01-2026 00:00:00
Regency PrimeDhaaniya EnterprisesNear Kali Mata Mandir31-12-2027 00:00:00
Vimal Raj ResidencyMs Om Shivam Builders And DevelopersCts No. 30306, Chalta No. 194,195,195A24-12-2024 00:00:00
Ganga ResidencyMr Ravi Yallappa VhatkarU No 81 Chalta No 152 152 A Cts No 31116 Sheet No 22 Ulhasnagar 42100431-12-2025 00:00:00
Jenny HeightsGhanshyam Ramchand Bathija20785B01-06-2023 00:00:00
Millano HeightsChimnani ConstructionsCd Hold Land Of Room No 1095, Cts No 2114231-12-2024 00:00:00
Manvi HeightsVeena Surendra Murpani2391631-12-2023 00:00:00
Maruti ParadiseHaresh Girdharilal GulrajaniCts No. 23231, 3070230-06-2024 00:00:00
Vaishnavi VillaSrushti Enterprises And Rohini EnterprisesThane31-08-2023 00:00:00
Sai Vijay HeritageVijay Lalsingh ThakurChalta No 213 217 Cts No 21084 B 21085 B 21086 B31-03-2025 00:00:00
Project Details
  • Project:
    Satya Jeevan Co.-Op. Hsg. Society
  • Location:
  • Thane, 421004
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Mar 2019
Developer Details

  • Developer:
    Mrp Infrastructure
  • Phone:
  • Address:
  • Shop No. 4 Basement, Tilsons Shopping, Section-17, Shivaji Chowk, Kalyan-Ambernath Road, 421003
Project RERA Details
MAHA REARA No: P51700012181
Project Type Residential
RERA Project Status On-Going Project
Funding Bank THE KALYAN JANTA SAHKARI BANK LTD
Proposed Possession 31 Mar 2019
Revised Possession 31 Mar 2019
Extended Possession
Litigations No Litigations
Last Modified 19 Oct 2021
Last Retrived 28 Jul 2025
Satya Jeevan Co.-Op. Hsg. Society QR Code
Satya Jeevan Co.-Op. Hsg. Society
MahaRERA - P51700012181
Apartment Details & Configuration
TypeArea
GARAGE 0133.9 Sq.mts. ( 365 Sq.ft. )
GARAGE 0230.19 Sq.mts. ( 325 Sq.ft. )
GARAGE 0327.87 Sq.mts. ( 300 Sq.ft. )
GARAGE 0427.4 Sq.mts. ( 295 Sq.ft. )
GARAGE 0526.48 Sq.mts. ( 285 Sq.ft. )
GARAGE 0621.37 Sq.mts. ( 230 Sq.ft. )
GARAGE 0730.67 Sq.mts. ( 330 Sq.ft. )
RESIDENTIAL41.35 Sq.mts. ( 445 Sq.ft. )
RESIDENTIAL50.18 Sq.mts. ( 540 Sq.ft. )
RESIDENTIAL50.65 Sq.mts. ( 545 Sq.ft. )
RESIDENTIAL52.97 Sq.mts. ( 570 Sq.ft. )
SHOP 0133.92 Sq.mts. ( 365 Sq.ft. )
SHOP 0230.2 Sq.mts. ( 325 Sq.ft. )
SHOP 0327.88 Sq.mts. ( 300 Sq.ft. )
SHOP 0427.41 Sq.mts. ( 295 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Satya Jeevan Co.-Op. Hsg. Societylast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Meter Room Only
Energy management
Led Lights
Fire Protection And Fire Safety Requirements
As Per Fire N.O.C.
Landscaping & Tree Planting
As Per Plan
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Only Septic Tank
Solid Waste Management And Disposal
Na
Storm Water Drains
Not Started
Street Lighting
Not Started
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Not Started
Water Supply
Not Started
Buildings / Wings in Satya Jeevan Co.-Op. Hsg. Society
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Satya Jeevan Co.-Op. Hsg. Society by Mrp Infrastructurelast updated on 28 Jul 2025 as per information obtained from MARA RERA.

7176 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

34 apartments in total
Total
34
Booked
19
Available
15

Saleable Area Statistics (Sq. ft.)

14763 Total
Total
14763
Booked
8652
Available
6111
Total 34 apartments in project. 19 apartments booked. 55% apartments booked.
Total 14763 Sq.ft. saleable area. 8652 saleable area booked.
59% area booked.

Satya Jeevan Co Op Hsg Society

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Satya Jeevan Co Op Hsg SocietyJan 19007111001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
GARAGE 0133.9 Sq.mts. ( 365 Sq.ft. )1
1 Booked100% Booked
100% Booked
GARAGE 0230.19 Sq.mts. ( 325 Sq.ft. )1
1 Booked100% Booked
100% Booked
GARAGE 0327.87 Sq.mts. ( 300 Sq.ft. )1
1 Booked100% Booked
100% Booked
GARAGE 0427.4 Sq.mts. ( 295 Sq.ft. )1
None Booked0% Booked
0% Booked
GARAGE 0526.48 Sq.mts. ( 285 Sq.ft. )1
None Booked0% Booked
0% Booked
GARAGE 0621.37 Sq.mts. ( 230 Sq.ft. )1
None Booked0% Booked
0% Booked
GARAGE 0730.67 Sq.mts. ( 330 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL41.35 Sq.mts. ( 445 Sq.ft. )5
2 Booked40% Booked
40% Booked
RESIDENTIAL50.18 Sq.mts. ( 540 Sq.ft. )5
3 Booked60% Booked
60% Booked
RESIDENTIAL50.65 Sq.mts. ( 545 Sq.ft. )5
5 Booked100% Booked
100% Booked
RESIDENTIAL52.97 Sq.mts. ( 570 Sq.ft. )5
2 Booked40% Booked
40% Booked
SHOP 0133.92 Sq.mts. ( 365 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 0230.2 Sq.mts. ( 325 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 0327.88 Sq.mts. ( 300 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 0427.41 Sq.mts. ( 295 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP 0526.48 Sq.mts. ( 285 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP 0621.37 Sq.mts. ( 230 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP 0730.67 Sq.mts. ( 330 Sq.ft. )1
None Booked0% Booked
0% Booked
34 total apartments / 19 apartments booked. 55% apartments booked.
Work Description in Building Satya Jeevan Co Op Hsg SocietyCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress97% done
97% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Mrp Infrastructure
for Project
Satya Jeevan Co.-Op. Hsg. Society
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation