Project overview

Saraswati Niwas is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900048130. Saraswati Niwas is located at 1741. This is a New being developed by Sugee Twenty Three Developers Llp.

Saraswati Niwas has 1 BHK, 1RK & 3 BHK Apartments with carpet areas ranging from 1151 to 462 Sq.ft. Carpet. The Project has total 12 of which 4 are currently available for sale.

Saraswati Niwas is being developed on a total land area of 4698 Sq.ft. Saraswati Niwas has 1 Wings / Towers Saraswati Niwas

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Saraswati Niwas
  • Location:
  • 1741
  • Const. Stage:
    New
  • Possession:
    30 Apr 2026
Developer Details

  • Developer:
    Sugee Twenty Three Developers Llp
  • Phone:
  • Address:
  • Nirlon House
Project RERA Details
MAHA REARA No: P51900048130
Project Type Residential / Group Housing
RERA Project Status New
Architect Mr. Prajeet Prasad
Funding Bank STATE BANK OF INDIA
Proposed Possession 30 Apr 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 12 Dec 2022
Last Retrived 26 Jul 2025
Saraswati Niwas QR Code
Saraswati Niwas
MahaRERA - P51900048130
Apartment Details & Configuration
TypeArea
1 BHK42.9 Sq.mts. ( 462 Sq.ft. )
1RK20.59 Sq.mts. ( 222 Sq.ft. )
1RK22.66 Sq.mts. ( 244 Sq.ft. )
3 BHK106.93 Sq.mts. ( 1151 Sq.ft. )
3 BHK107.29 Sq.mts. ( 1155 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Saraswati Niwaslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Approval
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Approval
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Approval
Solid Waste Management And Disposal
Na
Storm Water Drains
As Per Approval
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
As Per Regulation
Water Supply
As Per Regulation
Buildings / Wings in Saraswati Niwas
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Saraswati Niwas by Sugee Twenty Three Developers Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

4698 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

12 apartments in total
Total
12
Booked
8
Available
4

Saleable Area Statistics (Sq. ft.)

9443 Total
Total
9443
Booked
7365
Available
2078
Total 12 apartments in project. 8 apartments booked. 66% apartments booked.
Total 9443 Sq.ft. saleable area. 7365 saleable area booked.
78% area booked.

Saraswati Niwas

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Saraswati NiwasApr 202616101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK42.9 Sq.mts. ( 462 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK20.59 Sq.mts. ( 222 Sq.ft. )3
2 Booked66% Booked
66% Booked
1RK22.66 Sq.mts. ( 244 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK106.93 Sq.mts. ( 1151 Sq.ft. )3
2 Booked66% Booked
66% Booked
3 BHK107.29 Sq.mts. ( 1155 Sq.ft. )4
4 Booked100% Booked
100% Booked
12 total apartments / 8 apartments booked. 66% apartments booked.
Work Description in Building Saraswati NiwasCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress40% done
40% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress75% done
75% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress70% done
70% Booked
Stilt Floor
work-in-progress35% done
35% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress86% done
86% Booked
Channel Partners
Channel Partners Registered by Developer
Sugee Twenty Three Developers Llp
for Project
Saraswati Niwas
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation