Saraswati Devi Krupa is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700053444. Saraswati Devi Krupa is located at 2977,2978,2979. This is a New being developed by Yogiraj Heritage.

Saraswati Devi Krupa has 1 BHK, 1RK & 2 BHK Apartments with carpet areas ranging from 396 to 741 Sq.ft. Carpet. The Project has total 40 of which 22 are currently available for sale.

Saraswati Devi Krupa is being developed on a total land area of 8100 Sq.ft. Saraswati Devi Krupa has 2 Wings / Towers Devi Krupa-Building No 2,Saraswati Krupa-Building No 1

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Saraswati Devi Krupa
  • Location:
  • 2977,2978,2979
  • Const. Stage:
    New
  • Possession:
    31 Jul 2026
Developer Details

  • Developer:
    Yogiraj Heritage
  • Phone:
  • Address:
  • Nagnath Chs
Project RERA Details
MAHA REARA No: P51700053444
Project Type Residential / Group Housing
RERA Project Status New
Architect A One Architects
Funding Bank THE THANE BHARAT SAHAKARI BANK LIMITED
Proposed Possession 31 Jul 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 01 Nov 2023
Last Retrived 26 Jul 2025
Saraswati Devi Krupa QR Code
Saraswati Devi Krupa
MahaRERA - P51700053444
Apartment Details & Configuration
TypeArea
1 BHK47.67 Sq.mts. ( 513 Sq.ft. )
2 BHK62.14 Sq.mts. ( 669 Sq.ft. )
2 BHK66.26 Sq.mts. ( 713 Sq.ft. )
3 BHK81.15 Sq.mts. ( 873 Sq.ft. )
3 BHK94.34 Sq.mts. ( 1015 Sq.ft. )
1 BHK49.06 Sq.mts. ( 528 Sq.ft. )
1 BHK54 Sq.mts. ( 581 Sq.ft. )
1RK36.8 Sq.mts. ( 396 Sq.ft. )
2 BHK66.37 Sq.mts. ( 714 Sq.ft. )
2 BHK68.87 Sq.mts. ( 741 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Saraswati Devi Krupalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
In Later Scope Of Work
Solid Waste Management And Disposal
Na
Storm Water Drains
In Later Scope Of Work
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
In Later Scope Of Work
Buildings / Wings in Saraswati Devi Krupa
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Saraswati Devi Krupa by Yogiraj Heritagelast updated on 26 Jul 2025 as per information obtained from MARA RERA.

8100 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

40 apartments in total
Total
40
Booked
18
Available
22

Saleable Area Statistics (Sq. ft.)

26210 Total
Total
26210
Booked
11054
Available
15156
Total 40 apartments in project. 18 apartments booked. 45% apartments booked.
Total 26210 Sq.ft. saleable area. 11054 saleable area booked.
42% area booked.

Devi Krupa-Building No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Devi Krupa-Building No 2Jul 202671010024
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK47.67 Sq.mts. ( 513 Sq.ft. )5
3 Booked60% Booked
60% Booked
2 BHK62.14 Sq.mts. ( 669 Sq.ft. )5
None Booked0% Booked
0% Booked
2 BHK66.26 Sq.mts. ( 713 Sq.ft. )5
4 Booked80% Booked
80% Booked
3 BHK81.15 Sq.mts. ( 873 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK94.34 Sq.mts. ( 1015 Sq.ft. )2
None Booked0% Booked
0% Booked
19 total apartments / 7 apartments booked. 36% apartments booked.
Work Description in Building Devi Krupa-Building No 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress40% done
40% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Saraswati Krupa-Building No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Saraswati Krupa-Building No 1Jul 202671010019
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK49.06 Sq.mts. ( 528 Sq.ft. )6
4 Booked66% Booked
66% Booked
1 BHK54 Sq.mts. ( 581 Sq.ft. )6
4 Booked66% Booked
66% Booked
1RK36.8 Sq.mts. ( 396 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK66.37 Sq.mts. ( 714 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK68.87 Sq.mts. ( 741 Sq.ft. )7
3 Booked42% Booked
42% Booked
21 total apartments / 11 apartments booked. 52% apartments booked.
Work Description in Building Saraswati Krupa-Building No 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress40% done
40% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Yogiraj Heritage
for Project
Saraswati Devi Krupa
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation