Project overview

Saptaratna Towers is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800011864. Saptaratna Towers is located at 33/12. This is a Ongoing being developed by Raja Constructions Company.

Saptaratna Towers has 1 BHK, 2 BHK, 2.5 BHK, 3 BHK & 4.5 BHK Apartments with carpet areas ranging from 1479 to 1029 Sq.ft. Carpet. The Project has total 191 of which 2 are currently available for sale.

Saptaratna Towers is being developed on a total land area of 63906 Sq.ft. out of which 6511 Sq.ft. i.e 10% is reserved for recreational purposes. Saptaratna Towers has 3 Wings / Towers Saptaratna Towers A Wing,Saptaratna Towers B Wing,Saptaratna Towers C Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Saptaratna Towers
  • Location:
  • 33/12
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2017
Developer Details

  • Developer:
    Raja Constructions Company
  • Phone:
  • Address:
  • Pooja
Project RERA Details
MAHA REARA No: P51800011864
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Mr Priyank Bhatt D P Associates
Funding Bank ICICI BANK LIMITED
Proposed Possession 31 Dec 2017
Revised Possession 31 Dec 2017
Extended Possession
Litigations No Litigations
Last Modified 31 Aug 2017
Last Retrived 26 Jul 2025
Saptaratna Towers QR Code
Saptaratna Towers
MahaRERA - P51800011864
Apartment Details & Configuration
TypeArea
1 BHK42.4 Sq.mts. ( 456 Sq.ft. )
2 BHK55.08 Sq.mts. ( 593 Sq.ft. )
2 BHK57.27 Sq.mts. ( 616 Sq.ft. )
2 BHK58.55 Sq.mts. ( 630 Sq.ft. )
3 BHK64.55 Sq.mts. ( 695 Sq.ft. )
3 BHK65.13 Sq.mts. ( 701 Sq.ft. )
3 BHK65.42 Sq.mts. ( 704 Sq.ft. )
3 BHK71.65 Sq.mts. ( 771 Sq.ft. )
3 BHK72.45 Sq.mts. ( 780 Sq.ft. )
3 BHK74.98 Sq.mts. ( 807 Sq.ft. )
3 BHK79.02 Sq.mts. ( 851 Sq.ft. )
3 BHK79.14 Sq.mts. ( 852 Sq.ft. )
3 BHK79.24 Sq.mts. ( 853 Sq.ft. )
3 BHK79.6 Sq.mts. ( 857 Sq.ft. )
3 BHK83.68 Sq.mts. ( 901 Sq.ft. )
3 BHK84.43 Sq.mts. ( 909 Sq.ft. )
3 BHK84.51 Sq.mts. ( 910 Sq.ft. )
3 BHK85.47 Sq.mts. ( 920 Sq.ft. )
4 BHK101.83 Sq.mts. ( 1096 Sq.ft. )
4 BHK104.59 Sq.mts. ( 1126 Sq.ft. )
6 BHK168.86 Sq.mts. ( 1818 Sq.ft. )
2 BHK56.17 Sq.mts. ( 605 Sq.ft. )
3 BHK65.64 Sq.mts. ( 707 Sq.ft. )
3 BHK66.91 Sq.mts. ( 720 Sq.ft. )
3 BHK74.87 Sq.mts. ( 806 Sq.ft. )
3 BHK78.91 Sq.mts. ( 849 Sq.ft. )
3 BHK79.03 Sq.mts. ( 851 Sq.ft. )
4 BHK98.94 Sq.mts. ( 1065 Sq.ft. )
4 BHK98.95 Sq.mts. ( 1065 Sq.ft. )
4 BHK99.85 Sq.mts. ( 1075 Sq.ft. )
1 BHK44.79 Sq.mts. ( 482 Sq.ft. )
2 BHK61.75 Sq.mts. ( 665 Sq.ft. )
2 BHK69.68 Sq.mts. ( 750 Sq.ft. )
2.5 BHK88.46 Sq.mts. ( 952 Sq.ft. )
3 BHK95.62 Sq.mts. ( 1029 Sq.ft. )
3 BHK73.81 Sq.mts. ( 794 Sq.ft. )
4.5 BHK137.38 Sq.mts. ( 1479 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Saptaratna Towerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Work Completed
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
As Per Tata Power Noc
Energy management100% completed
95% Complete
Solar Panel
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Final Ceo Noc
Landscaping & Tree Planting100% completed
95% Complete
As Per Tree Noc
Open Parking100% completed
95% Complete
Completed
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
As Per Dcc
Solid Waste Management And Disposal100% completed
95% Complete
As Per Consultant Report
Storm Water Drains100% completed
95% Complete
As Per Swd
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Work Completed
Water Conservation, Rain water Harvesting100% completed
95% Complete
Work Completed
Water Supply100% completed
95% Complete
Work Completed
Buildings / Wings in Saptaratna Towers
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Saptaratna Towers by Raja Constructions Companylast updated on 26 Jul 2025 as per information obtained from MARA RERA.

63906 Sq. ft.

Project Area

6511 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

191 apartments in total
Total
191
Booked
189
Available
2

Saleable Area Statistics (Sq. ft.)

144763 Total
Total
144763
Booked
143262
Available
1500
Total 191 apartments in project. 189 apartments booked. 98% apartments booked.
Total 144763 Sq.ft. saleable area. 143262 saleable area booked.
99% area booked.

Saptaratna Towers A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Saptaratna Towers A WingJan 1900171012071
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK42.4 Sq.mts. ( 456 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK55.08 Sq.mts. ( 593 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK57.27 Sq.mts. ( 616 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK58.55 Sq.mts. ( 630 Sq.ft. )9
9 Booked100% Booked
100% Booked
3 BHK64.55 Sq.mts. ( 695 Sq.ft. )7
7 Booked100% Booked
100% Booked
3 BHK65.13 Sq.mts. ( 701 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK65.42 Sq.mts. ( 704 Sq.ft. )8
8 Booked100% Booked
100% Booked
3 BHK71.65 Sq.mts. ( 771 Sq.ft. )7
7 Booked100% Booked
100% Booked
3 BHK72.45 Sq.mts. ( 780 Sq.ft. )6
6 Booked100% Booked
100% Booked
3 BHK74.98 Sq.mts. ( 807 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK79.02 Sq.mts. ( 851 Sq.ft. )3
3 Booked100% Booked
100% Booked
3 BHK79.14 Sq.mts. ( 852 Sq.ft. )3
3 Booked100% Booked
100% Booked
3 BHK79.24 Sq.mts. ( 853 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK79.6 Sq.mts. ( 857 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK83.68 Sq.mts. ( 901 Sq.ft. )3
3 Booked100% Booked
100% Booked
3 BHK84.43 Sq.mts. ( 909 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK84.51 Sq.mts. ( 910 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK85.47 Sq.mts. ( 920 Sq.ft. )2
2 Booked100% Booked
100% Booked
4 BHK101.83 Sq.mts. ( 1096 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK104.59 Sq.mts. ( 1126 Sq.ft. )1
1 Booked100% Booked
100% Booked
6 BHK168.86 Sq.mts. ( 1818 Sq.ft. )1
1 Booked100% Booked
100% Booked
63 total apartments / 63 apartments booked. 100% apartments booked.
Work Description in Building Saptaratna Towers A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Saptaratna Towers B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Saptaratna Towers B WingJan 1900171012091
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK56.17 Sq.mts. ( 605 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK57.27 Sq.mts. ( 616 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK58.55 Sq.mts. ( 630 Sq.ft. )9
9 Booked100% Booked
100% Booked
3 BHK65.64 Sq.mts. ( 707 Sq.ft. )7
7 Booked100% Booked
100% Booked
3 BHK66.91 Sq.mts. ( 720 Sq.ft. )9
9 Booked100% Booked
100% Booked
3 BHK74.87 Sq.mts. ( 806 Sq.ft. )15
15 Booked100% Booked
100% Booked
3 BHK78.91 Sq.mts. ( 849 Sq.ft. )4
4 Booked100% Booked
100% Booked
3 BHK79.03 Sq.mts. ( 851 Sq.ft. )5
5 Booked100% Booked
100% Booked
3 BHK79.6 Sq.mts. ( 857 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK83.68 Sq.mts. ( 901 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK84.43 Sq.mts. ( 909 Sq.ft. )3
3 Booked100% Booked
100% Booked
3 BHK85.47 Sq.mts. ( 920 Sq.ft. )2
2 Booked100% Booked
100% Booked
4 BHK98.94 Sq.mts. ( 1065 Sq.ft. )2
2 Booked100% Booked
100% Booked
4 BHK98.95 Sq.mts. ( 1065 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK99.85 Sq.mts. ( 1075 Sq.ft. )3
3 Booked100% Booked
100% Booked
65 total apartments / 65 apartments booked. 100% apartments booked.
Work Description in Building Saptaratna Towers B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Saptaratna Towers C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Saptaratna Towers C WingJan 19001810128592
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK44.79 Sq.mts. ( 482 Sq.ft. )20
20 Booked100% Booked
100% Booked
2 BHK61.75 Sq.mts. ( 665 Sq.ft. )10
10 Booked100% Booked
100% Booked
2 BHK69.68 Sq.mts. ( 750 Sq.ft. )13
11 Booked84% Booked
84% Booked
2.5 BHK88.46 Sq.mts. ( 952 Sq.ft. )5
5 Booked100% Booked
100% Booked
3 BHK95.62 Sq.mts. ( 1029 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK73.81 Sq.mts. ( 794 Sq.ft. )12
12 Booked100% Booked
100% Booked
4.5 BHK137.38 Sq.mts. ( 1479 Sq.ft. )2
2 Booked100% Booked
100% Booked
63 total apartments / 61 apartments booked. 96% apartments booked.
Work Description in Building Saptaratna Towers C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Raja Constructions Company
for Project
Saptaratna Towers
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation