Project overview

Sanjari Phase 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000049917. Sanjari Phase 2 is located at 401208, Palghar, Kaman Road. This is a New Project being developed by Amin Chotaliya.

Sanjari Phase 2 has GALA Apartments with carpet areas ranging from 1105 to 1047 Sq.ft. Carpet. The Project has total 14 of which 14 are currently available for sale.

Sanjari Phase 2 is being developed on a total land area of 48083 Sq.ft. Sanjari Phase 2 has 1 Wings / Towers Sanjari Phase 2

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Sanjari Phase 2
  • Location:
  • 401208, Palghar, Kaman Road
  • Const. Stage:
    New Project
  • Possession:
    31 Mar 2026
Developer Details

  • Developer:
    Amin Chotaliya
  • Phone:
  • Address:
  • 33, Sanjari Industrial Estate, Kaman Road, Flora Hotel, Kaman Road, 401208
Project RERA Details
MAHA REARA No: P99000049917
Project Type Industrial
RERA Project Status New Project
Funding Bank Punjab and Sind Bank
Proposed Possession 31 Mar 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 10 Jan 2024
Last Retrived 28 Jul 2025
Sanjari Phase 2 QR Code
Sanjari Phase 2
MahaRERA - P99000049917
Apartment Details & Configuration
TypeArea
GALA60.665 Sq.mts. ( 653 Sq.ft. )
GALA75.065 Sq.mts. ( 808 Sq.ft. )
GALA75.71 Sq.mts. ( 815 Sq.ft. )
GALA97.26 Sq.mts. ( 1047 Sq.ft. )
GALA102.65 Sq.mts. ( 1105 Sq.ft. )
GALA111.4836 Sq.mts. ( 1200 Sq.ft. )
GALA120.774 Sq.mts. ( 1300 Sq.ft. )
GALA139.26 Sq.mts. ( 1499 Sq.ft. )
GALA165.646 Sq.mts. ( 1783 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sanjari Phase 2last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Water Supply
0
Water Conservation, Rain water Harvesting
0
Treatment And Disposal Of Sewage And Sullage Water
Na
Street Lighting
0
Storm Water Drains
0
Solid Waste Management And Disposal
0
Sewerage (Chamber, Lines, Septic Tank , STP)
Septic Tank Shall Be Provided Instead Of Stp
Open Parking
146 Open Parking
Landscaping & Tree Planting
0
Fire Protection And Fire Safety Requirements
0
Energy management
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electric Meter Room Shall Be Provided
Community Buildings
Na
Aggregate area of recreational Open Space
Na
Buildings / Wings in Sanjari Phase 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sanjari Phase 2 by Amin Chotaliyalast updated on 28 Jul 2025 as per information obtained from MARA RERA.

48083 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

14 apartments in total
Total
14
Booked
0
Available
14

Saleable Area Statistics (Sq. ft.)

17298 Total
Total
17298
Booked
0
Available
17298
Total 14 apartments in project. 0 apartments booked. 0% apartments booked.
Total 17298 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Sanjari Phase 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sanjari Phase 2Mar 2026100001460
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
GALA60.665 Sq.mts. ( 653 Sq.ft. )1
None Booked0% Booked
0% Booked
GALA75.065 Sq.mts. ( 808 Sq.ft. )2
None Booked0% Booked
0% Booked
GALA75.71 Sq.mts. ( 815 Sq.ft. )1
None Booked0% Booked
0% Booked
GALA97.26 Sq.mts. ( 1047 Sq.ft. )1
None Booked0% Booked
0% Booked
GALA102.65 Sq.mts. ( 1105 Sq.ft. )1
None Booked0% Booked
0% Booked
GALA111.4836 Sq.mts. ( 1200 Sq.ft. )1
None Booked0% Booked
0% Booked
GALA120.774 Sq.mts. ( 1300 Sq.ft. )1
None Booked0% Booked
0% Booked
GALA139.26 Sq.mts. ( 1499 Sq.ft. )4
None Booked0% Booked
0% Booked
GALA165.646 Sq.mts. ( 1783 Sq.ft. )2
None Booked0% Booked
0% Booked
14 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Sanjari Phase 2Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Amin Chotaliya
for Project
Sanjari Phase 2
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation