Project overview

Sani Mascot is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800007030. Sani Mascot is located at Cts 107. This is a Ongoing being developed by Sani Mascot Developers.

Sani Mascot has 1 BHK & 2 BHK Apartments with carpet areas ranging from 525 to 855 Sq.ft. Carpet. The Project has total 81 of which 61 are currently available for sale.

Sani Mascot is being developed on a total land area of 100093 Sq.ft. out of which 6095 Sq.ft. i.e 6% is reserved for recreational purposes. Sani Mascot has 2 Wings / Towers Sani Towers A,Sani Towers B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Sani Mascot
  • Location:
  • Cts 107
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2024
Developer Details

  • Developer:
    Sani Mascot Developers
  • Phone:
  • Address:
  • A K Mom Mahal
Project RERA Details
MAHA REARA No: P51800007030
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect K Zaman
Funding Bank CANARA BANK
Proposed Possession 30 Dec 2024
Revised Possession 30 Dec 2024
Extended Possession
Litigations No Litigations
Last Modified 26 May 2025
Last Retrived 26 Jul 2025
Sani Mascot QR Code
Sani Mascot
MahaRERA - P51800007030
Apartment Details & Configuration
TypeArea
2 BHK68.86 Sq.mts. ( 741 Sq.ft. )
2 BHK69.45 Sq.mts. ( 748 Sq.ft. )
2 BHK74.37 Sq.mts. ( 801 Sq.ft. )
1 BHK48.8 Sq.mts. ( 525 Sq.ft. )
2 BHK75.49 Sq.mts. ( 813 Sq.ft. )
2 BHK79.45 Sq.mts. ( 855 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sani Mascotlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space50% completed
50% Complete
Paved Rg Done
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
To Be Done
Energy management
Na
Fire Protection And Fire Safety Requirements
To Be Done
Landscaping & Tree Planting
To Be Done
Open Parking
To Be Done
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Sewerage Connection Already Connected With Mcgm
Solid Waste Management And Disposal
Na
Storm Water Drains
To Be Connected
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
To Be Done
Water Supply50% completed
50% Complete
Borewell Done Water Connection After Oc
Buildings / Wings in Sani Mascot
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sani Mascot by Sani Mascot Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

100093 Sq. ft.

Project Area

6095 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

81 apartments in total
Total
81
Booked
20
Available
61

Saleable Area Statistics (Sq. ft.)

60207 Total
Total
60207
Booked
15241
Available
44966
Total 81 apartments in project. 20 apartments booked. 24% apartments booked.
Total 60207 Sq.ft. saleable area. 15241 saleable area booked.
25% area booked.

Sani Towers A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sani Towers AJan 190061000012
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK68.86 Sq.mts. ( 741 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK69.45 Sq.mts. ( 748 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK74.37 Sq.mts. ( 801 Sq.ft. )12
None Booked0% Booked
0% Booked
24 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Sani Towers ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked

Sani Towers B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sani Towers BDec 20231910133716
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK48.8 Sq.mts. ( 525 Sq.ft. )19
5 Booked26% Booked
26% Booked
2 BHK75.49 Sq.mts. ( 813 Sq.ft. )19
5 Booked26% Booked
26% Booked
2 BHK79.45 Sq.mts. ( 855 Sq.ft. )19
10 Booked52% Booked
52% Booked
57 total apartments / 20 apartments booked. 35% apartments booked.
Work Description in Building Sani Towers BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress85% done
85% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress80% done
80% Booked
Sanitary Fittings within the flats / premises
work-in-progress30% done
30% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Sani Mascot Developers
for Project
Sani Mascot
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation