Sanghvi S3 Ecocity Woods is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900006575. Sanghvi S3 Ecocity Woods is located at S No 102/26 And 88/13 Village Mire And S No 11/1/2 Village Mahajanwadi. This is a Ongoing being developed by Sanghvi Premises Pvt. Ltd..

Sanghvi S3 Ecocity Woods has 1 BHK, 2 BHK & Shop Apartments with carpet areas ranging from 1112 to 983 Sq.ft. Carpet. The Project has total 318 of which 65 are currently available for sale.

Sanghvi S3 Ecocity Woods is being developed on a total land area of 33928 Sq.ft. Sanghvi S3 Ecocity Woods has 2 Wings / Towers Woods A,Woods B

ProjectDeveloperLocationPossession
127 Raj Homes A WingRaj HomesSurvey No./ Hissa No. 49(127)/10,11,1230-09-2025 00:00:00
S3 SkyriseS3 Smart Spaces Private LimitedS No 102/26 And 88/13 Of Village Mire And S No 11/1 And 11/2 Of Village Mahajanwadi Taluka And District Thane31-12-2027 00:00:00
Kasturi BlossomSiddhivinayak EnterpriseOld Survey No. 2131-12-2027 00:00:00
Crescent Wtc (Western Trade Center)Crescent Shelters4152, 4153, 4316, 4351, 4352, 4354, 4355,4356,4357, 4358, 4359, 4360, 4404, 440530-06-2027 00:00:00
Aaradhya Highpark - Project 1 Of Phase IMan Vastucon LlpS. No. 92 - Corresponding New S. No. 13-130-03-2025 00:00:00
Aaradhya Highpark - Project 2 Of Phase IMan Vastucon LlpS. No 92 Corresponding New S. No. 13/130-03-2025 00:00:00
Magic Meera HeightsMagic Star DevelopersS.No 141/2(Old)12/2(New)30-12-2025 00:00:00
127 Raj Homes B And C WingRaj HomesSurvey No./Hissa No.49(127)/10,11,1231-12-2026 00:00:00
127 Raj Homes D WingRaj Homes49(127)1,2,3,5,6,8,10,11,1231-12-2026 00:00:00
Project Details
  • Project:
    Sanghvi S3 Ecocity Woods
  • Location:
  • S No 102/26 And 88/13 Village Mire And S No 11/1/2 Village Mahajanwadi
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Sanghvi Premises Pvt. Ltd.
  • Phone:
  • Address:
  • Sanjana Mansion
Project RERA Details
MAHA REARA No: P51900006575
Project Type Others
RERA Project Status Ongoing
Architect Bac Planners & Engineers Pvt Ltd
Funding Bank ICICI BANK LIMITED
Proposed Possession 30 Dec 2023
Revised Possession 30 Dec 2023
Extended Possession 29 Dec 2024
Litigations No Litigations
Last Modified 10 Nov 2023
Last Retrived 26 Jul 2025
Sanghvi S3 Ecocity Woods QR Code
Sanghvi S3 Ecocity Woods
MahaRERA - P51900006575
Apartment Details & Configuration
TypeArea
1 BHK33.46 Sq.mts. ( 360 Sq.ft. )
1 BHK36.42 Sq.mts. ( 392 Sq.ft. )
1 BHK45.65 Sq.mts. ( 491 Sq.ft. )
2 BHK55.53 Sq.mts. ( 598 Sq.ft. )
2 BHK68.75 Sq.mts. ( 740 Sq.ft. )
2 BHK69.63 Sq.mts. ( 749 Sq.ft. )
Shop37.94 Sq.mts. ( 408 Sq.ft. )
Shop44.02 Sq.mts. ( 474 Sq.ft. )
Shop14.76 Sq.mts. ( 159 Sq.ft. )
Shop17.43 Sq.mts. ( 188 Sq.ft. )
Shop20.11 Sq.mts. ( 216 Sq.ft. )
Shop20.24 Sq.mts. ( 218 Sq.ft. )
Shop26.02 Sq.mts. ( 280 Sq.ft. )
Shop29.7 Sq.mts. ( 320 Sq.ft. )
Shop45.75 Sq.mts. ( 492 Sq.ft. )
1 BHK44.18 Sq.mts. ( 476 Sq.ft. )
Shop88.96 Sq.mts. ( 958 Sq.ft. )
Shop90.4 Sq.mts. ( 973 Sq.ft. )
Shop91.29 Sq.mts. ( 983 Sq.ft. )
Shop103.31 Sq.mts. ( 1112 Sq.ft. )
Shop518.41 Sq.mts. ( 5580 Sq.ft. )
Shop45.86 Sq.mts. ( 494 Sq.ft. )
Shop37.8 Sq.mts. ( 407 Sq.ft. )
Shop38.07 Sq.mts. ( 410 Sq.ft. )
Shop41.73 Sq.mts. ( 449 Sq.ft. )
Shop34.12 Sq.mts. ( 367 Sq.ft. )
Shop14.73 Sq.mts. ( 159 Sq.ft. )
Shop17.72 Sq.mts. ( 191 Sq.ft. )
Shop20.68 Sq.mts. ( 223 Sq.ft. )
Shop20.97 Sq.mts. ( 226 Sq.ft. )
Shop22.83 Sq.mts. ( 246 Sq.ft. )
Shop25.51 Sq.mts. ( 275 Sq.ft. )
Shop27.21 Sq.mts. ( 293 Sq.ft. )
Shop29.45 Sq.mts. ( 317 Sq.ft. )
Shop29.77 Sq.mts. ( 320 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sanghvi S3 Ecocity Woodslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings100% completed
95% Complete
Club House
Electrical Meter Room, Sub-Station, Receiving Station90% completed
90% Complete
As Per Plan
Energy management
Solar Wh
Fire Protection And Fire Safety Requirements70% completed
70% Complete
As Per Plan
Landscaping & Tree Planting50% completed
50% Complete
As Per Plan
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)80% completed
80% Complete
Stp Wip
Solid Waste Management And Disposal
Na
Storm Water Drains60% completed
60% Complete
As Per Plan
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water50% completed
50% Complete
As Per Plan
Water Conservation, Rain water Harvesting80% completed
80% Complete
As Per Plan
Water Supply
By Mbmc After Oc
Buildings / Wings in Sanghvi S3 Ecocity Woods
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sanghvi S3 Ecocity Woods by Sanghvi Premises Pvt. Ltd.last updated on 26 Jul 2025 as per information obtained from MARA RERA.

33928 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

318 apartments in total
Total
318
Booked
253
Available
65

Saleable Area Statistics (Sq. ft.)

157360 Total
Total
157360
Booked
120085
Available
37275
Total 318 apartments in project. 253 apartments booked. 79% apartments booked.
Total 157360 Sq.ft. saleable area. 120085 saleable area booked.
76% area booked.

Woods A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Woods ADec 2022271011045
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.46 Sq.mts. ( 360 Sq.ft. )35
35 Booked100% Booked
100% Booked
1 BHK36.42 Sq.mts. ( 392 Sq.ft. )38
38 Booked100% Booked
100% Booked
1 BHK45.65 Sq.mts. ( 491 Sq.ft. )13
None Booked0% Booked
0% Booked
2 BHK55.53 Sq.mts. ( 598 Sq.ft. )38
38 Booked100% Booked
100% Booked
2 BHK68.75 Sq.mts. ( 740 Sq.ft. )12
6 Booked50% Booked
50% Booked
2 BHK69.63 Sq.mts. ( 749 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop37.94 Sq.mts. ( 408 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop44.02 Sq.mts. ( 474 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.76 Sq.mts. ( 159 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop17.43 Sq.mts. ( 188 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.11 Sq.mts. ( 216 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.24 Sq.mts. ( 218 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop26.02 Sq.mts. ( 280 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop29.7 Sq.mts. ( 320 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop45.75 Sq.mts. ( 492 Sq.ft. )1
None Booked0% Booked
0% Booked
147 total apartments / 117 apartments booked. 79% apartments booked.
Work Description in Building Woods ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress85% done
85% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress60% done
60% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress60% done
60% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress85% done
85% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress70% done
70% Booked
Sanitary Fittings within the flats / premises
work-in-progress70% done
70% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress85% done
85% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
work-in-progress85% done
85% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Woods B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Woods BDec 2022271011041
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.46 Sq.mts. ( 360 Sq.ft. )35
35 Booked100% Booked
100% Booked
1 BHK36.42 Sq.mts. ( 392 Sq.ft. )38
38 Booked100% Booked
100% Booked
1 BHK44.18 Sq.mts. ( 476 Sq.ft. )14
7 Booked50% Booked
50% Booked
1 BHK45.65 Sq.mts. ( 491 Sq.ft. )13
7 Booked53% Booked
53% Booked
2 BHK55.53 Sq.mts. ( 598 Sq.ft. )38
36 Booked94% Booked
94% Booked
2 BHK68.75 Sq.mts. ( 740 Sq.ft. )12
11 Booked91% Booked
91% Booked
2 BHK69.63 Sq.mts. ( 749 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop88.96 Sq.mts. ( 958 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop90.4 Sq.mts. ( 973 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop91.29 Sq.mts. ( 983 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop103.31 Sq.mts. ( 1112 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop518.41 Sq.mts. ( 5580 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop45.86 Sq.mts. ( 494 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop37.8 Sq.mts. ( 407 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop38.07 Sq.mts. ( 410 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop41.73 Sq.mts. ( 449 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop34.12 Sq.mts. ( 367 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.73 Sq.mts. ( 159 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop17.72 Sq.mts. ( 191 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.68 Sq.mts. ( 223 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.97 Sq.mts. ( 226 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop22.83 Sq.mts. ( 246 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop25.51 Sq.mts. ( 275 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop27.21 Sq.mts. ( 293 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop29.45 Sq.mts. ( 317 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop29.77 Sq.mts. ( 320 Sq.ft. )1
None Booked0% Booked
0% Booked
171 total apartments / 136 apartments booked. 79% apartments booked.
Work Description in Building Woods BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress85% done
85% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress60% done
60% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress60% done
60% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress85% done
85% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress70% done
70% Booked
Sanitary Fittings within the flats / premises
work-in-progress70% done
70% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress85% done
85% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
work-in-progress85% done
85% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Sanghvi Premises Pvt. Ltd.
for Project
Sanghvi S3 Ecocity Woods
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation