Project overview

Samta is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800019087. Samta is located at Fp No 144. This is a New being developed by Green Tree Lifescapes Llp.

Samta has 1 BHK, 2 BHK A, 2 BHK B, 3 BHK A, 3 BHK B, 3 BHK C & 3 BHK D Apartments with carpet areas ranging from 464 to 989 Sq.ft. Carpet. The Project has total 23 of which 23 are currently available for sale.

Samta is being developed on a total land area of 7481 Sq.ft. Samta has 1 Wings / Towers Samta

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Samta
  • Location:
  • Fp No 144
  • Const. Stage:
    New
  • Possession:
    01 Aug 2022
Developer Details

  • Developer:
    Green Tree Lifescapes Llp
  • Phone:
  • Address:
  • 39 Gundivali
Project RERA Details
MAHA REARA No: P51800019087
Project Type Residential / Group Housing
RERA Project Status New
Architect Hemal Sanghavi
Funding Bank HDFC BANK
Proposed Possession 01 Aug 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 04 Jan 2019
Last Retrived 26 Jul 2025
Samta QR Code
Samta
MahaRERA - P51800019087
Apartment Details & Configuration
TypeArea
1 BHK43.14 Sq.mts. ( 464 Sq.ft. )
2 BHK A65.04 Sq.mts. ( 700 Sq.ft. )
2 BHK B68.66 Sq.mts. ( 739 Sq.ft. )
3 BHK A81.6 Sq.mts. ( 878 Sq.ft. )
3 BHK B91.39 Sq.mts. ( 984 Sq.ft. )
3 BHK C91.85 Sq.mts. ( 989 Sq.ft. )
3 BHK D78.79 Sq.mts. ( 848 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Samtalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Not Started
Energy management
Na
Fire Protection And Fire Safety Requirements
Not Started
Landscaping & Tree Planting
Na
Mechanical parking system
Not Started
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Not Started
Solid Waste Management And Disposal20% completed
20% Complete
Shall Be Complied As Per Swm Noc
Storm Water Drains
Not Started
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Not Started
Water Supply
After Completion Of Building
Buildings / Wings in Samta
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Samta by Green Tree Lifescapes Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

7481 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

23 apartments in total
Total
23
Booked
0
Available
23

Saleable Area Statistics (Sq. ft.)

17881 Total
Total
17881
Booked
0
Available
17881
Total 23 apartments in project. 0 apartments booked. 0% apartments booked.
Total 17881 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Samta

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
SamtaJan 2021141010035
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK43.14 Sq.mts. ( 464 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK A65.04 Sq.mts. ( 700 Sq.ft. )11
None Booked0% Booked
0% Booked
2 BHK B68.66 Sq.mts. ( 739 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK A81.6 Sq.mts. ( 878 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK B91.39 Sq.mts. ( 984 Sq.ft. )5
None Booked0% Booked
0% Booked
3 BHK C91.85 Sq.mts. ( 989 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK D78.79 Sq.mts. ( 848 Sq.ft. )1
None Booked0% Booked
0% Booked
23 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building SamtaCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Green Tree Lifescapes Llp
for Project
Samta
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation