Project overview

Samruddhi Residency Phase-1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000020901. Samruddhi Residency Phase-1 is located at Palghar. This is a New Project being developed by Dharmi Constructions.

Samruddhi Residency Phase-1 has FLAT Apartments with carpet areas ranging from 193 to 268 Sq.ft. Carpet. The Project has total 85 of which 58 are currently available for sale.

Samruddhi Residency Phase-1 is being developed on a total land area of 32292 Sq.ft. out of which 3229 Sq.ft. i.e 10% is reserved for recreational purposes. Samruddhi Residency Phase-1 has 3 Wings / Towers Building No-3,Building No-4,Building No-5

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Samruddhi Residency Phase-1
  • Location:
  • Palghar
  • Const. Stage:
    New Project
  • Possession:
    30 May 2024
Developer Details

  • Developer:
    Dharmi Constructions
  • Phone:
  • Address:
  • Shop No-3, Raut Arcade, Tembhikhodave Road, Opp Bus Depot, Saphale (W), 401102
Project RERA Details
MAHA REARA No: P99000020901
Project Type Residential
RERA Project Status New Project
Funding Bank HDFC Bank
Proposed Possession 30 May 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 17 Apr 2023
Last Retrived 28 Jul 2025
Samruddhi Residency Phase-1 QR Code
Samruddhi Residency Phase-1
MahaRERA - P99000020901
Apartment Details & Configuration
TypeArea
2 BHK50.4 Sq.mts. ( 543 Sq.ft. )
FLAT27.99 Sq.mts. ( 301 Sq.ft. )
FLAT28.15 Sq.mts. ( 303 Sq.ft. )
FLAT28.55 Sq.mts. ( 307 Sq.ft. )
FLAT29.08 Sq.mts. ( 313 Sq.ft. )
FLAT31.1 Sq.mts. ( 335 Sq.ft. )
FLAT33.94 Sq.mts. ( 365 Sq.ft. )
FLAT34.25 Sq.mts. ( 369 Sq.ft. )
FLAT34.55 Sq.mts. ( 372 Sq.ft. )
FLAT20.15 Sq.mts. ( 217 Sq.ft. )
FLAT26.44 Sq.mts. ( 285 Sq.ft. )
FLAT26.85 Sq.mts. ( 289 Sq.ft. )
FLAT27.57 Sq.mts. ( 297 Sq.ft. )
FLAT41.18 Sq.mts. ( 443 Sq.ft. )
FLAT50.5 Sq.mts. ( 544 Sq.ft. )
FLAT17.94 Sq.mts. ( 193 Sq.ft. )
FLAT22.07 Sq.mts. ( 238 Sq.ft. )
FLAT22.45 Sq.mts. ( 242 Sq.ft. )
FLAT24.91 Sq.mts. ( 268 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Samruddhi Residency Phase-1last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Open Space Available
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electric Meter Room To Be Provided
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Available
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Provided
Solid Waste Management And Disposal
Na
Storm Water Drains
Yet To Be Started
Street Lighting
Will Be Provided
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting Will Be Done
Water Supply100% completed
95% Complete
Borewell Provided
Buildings / Wings in Samruddhi Residency Phase-1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Samruddhi Residency Phase-1 by Dharmi Constructionslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

32292 Sq. ft.

Project Area

3229 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

85 apartments in total
Total
85
Booked
27
Available
58

Saleable Area Statistics (Sq. ft.)

28156 Total
Total
28156
Booked
10176
Available
17980
Total 85 apartments in project. 27 apartments booked. 31% apartments booked.
Total 28156 Sq.ft. saleable area. 10176 saleable area booked.
36% area booked.

Building No-3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No-3May 20234101021
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK50.4 Sq.mts. ( 543 Sq.ft. )4
None Booked0% Booked
0% Booked
FLAT27.99 Sq.mts. ( 301 Sq.ft. )1
None Booked0% Booked
0% Booked
FLAT28.15 Sq.mts. ( 303 Sq.ft. )1
1 Booked100% Booked
100% Booked
FLAT28.55 Sq.mts. ( 307 Sq.ft. )1
1 Booked100% Booked
100% Booked
FLAT29.08 Sq.mts. ( 313 Sq.ft. )1
None Booked0% Booked
0% Booked
FLAT31.1 Sq.mts. ( 335 Sq.ft. )4
2 Booked50% Booked
50% Booked
FLAT33.94 Sq.mts. ( 365 Sq.ft. )4
None Booked0% Booked
0% Booked
FLAT34.25 Sq.mts. ( 369 Sq.ft. )12
10 Booked83% Booked
83% Booked
FLAT34.55 Sq.mts. ( 372 Sq.ft. )1
1 Booked100% Booked
100% Booked
29 total apartments / 15 apartments booked. 51% apartments booked.
Work Description in Building Building No-3Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress60% done
60% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress58% done
58% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress30% done
30% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress80% done
80% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress50% done
50% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress60% done
60% Booked

Building No-4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No-4May 20234101021
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
FLAT20.15 Sq.mts. ( 217 Sq.ft. )1
1 Booked100% Booked
100% Booked
FLAT26.44 Sq.mts. ( 285 Sq.ft. )4
None Booked0% Booked
0% Booked
FLAT26.85 Sq.mts. ( 289 Sq.ft. )1
None Booked0% Booked
0% Booked
FLAT27.57 Sq.mts. ( 297 Sq.ft. )1
None Booked0% Booked
0% Booked
FLAT31.1 Sq.mts. ( 335 Sq.ft. )1
1 Booked100% Booked
100% Booked
FLAT34.25 Sq.mts. ( 369 Sq.ft. )16
6 Booked37% Booked
37% Booked
FLAT41.18 Sq.mts. ( 443 Sq.ft. )1
1 Booked100% Booked
100% Booked
FLAT50.5 Sq.mts. ( 544 Sq.ft. )4
3 Booked75% Booked
75% Booked
29 total apartments / 12 apartments booked. 41% apartments booked.
Work Description in Building Building No-4Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress60% done
60% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress58% done
58% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress30% done
30% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress80% done
80% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress50% done
50% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress60% done
60% Booked

Building No-5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No-5May 20234101041
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
FLAT17.94 Sq.mts. ( 193 Sq.ft. )3
None Booked0% Booked
0% Booked
FLAT22.07 Sq.mts. ( 238 Sq.ft. )8
None Booked0% Booked
0% Booked
FLAT22.45 Sq.mts. ( 242 Sq.ft. )15
None Booked0% Booked
0% Booked
FLAT24.91 Sq.mts. ( 268 Sq.ft. )1
None Booked0% Booked
0% Booked
27 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No-5Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Dharmi Constructions
for Project
Samruddhi Residency Phase-1
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation