Project overview
Samruddhi Residency Phase-1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000020901. Samruddhi Residency Phase-1 is located at Palghar. This is a New Project being developed by Dharmi Constructions.
Samruddhi Residency Phase-1 has FLAT Apartments with carpet areas ranging from 193 to 268 Sq.ft. Carpet. The Project has total 85 of which 58 are currently available for sale.
Samruddhi Residency Phase-1 is being developed on a total land area of 32292 Sq.ft. out of which 3229 Sq.ft. i.e 10% is reserved for recreational purposes. Samruddhi Residency Phase-1 has 3 Wings / Towers Building No-3,Building No-4,Building No-5
| Project | Developer | Location | Possession |
-
Developer:
Dharmi Constructions
-
Phone:
-
Address:
-
Shop No-3, Raut Arcade, Tembhikhodave Road, Opp Bus Depot, Saphale (W), 401102
| MAHA REARA No: |
P99000020901 |
| Project Type |
Residential |
| RERA Project Status |
New Project |
| Funding Bank |
HDFC Bank |
| Proposed Possession |
30 May 2024 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
17 Apr 2023 |
| Last Retrived |
28 Jul 2025 |
Samruddhi Residency Phase-1 QR Code
Samruddhi Residency Phase-1
MahaRERA - P99000020901
| Type | Area |
| 2 BHK | 50.4 Sq.mts. ( 543 Sq.ft. ) |
| FLAT | 27.99 Sq.mts. ( 301 Sq.ft. ) |
| FLAT | 28.15 Sq.mts. ( 303 Sq.ft. ) |
| FLAT | 28.55 Sq.mts. ( 307 Sq.ft. ) |
| FLAT | 29.08 Sq.mts. ( 313 Sq.ft. ) |
| FLAT | 31.1 Sq.mts. ( 335 Sq.ft. ) |
| FLAT | 33.94 Sq.mts. ( 365 Sq.ft. ) |
| FLAT | 34.25 Sq.mts. ( 369 Sq.ft. ) |
| FLAT | 34.55 Sq.mts. ( 372 Sq.ft. ) |
| FLAT | 20.15 Sq.mts. ( 217 Sq.ft. ) |
| FLAT | 26.44 Sq.mts. ( 285 Sq.ft. ) |
| FLAT | 26.85 Sq.mts. ( 289 Sq.ft. ) |
| FLAT | 27.57 Sq.mts. ( 297 Sq.ft. ) |
| FLAT | 41.18 Sq.mts. ( 443 Sq.ft. ) |
| FLAT | 50.5 Sq.mts. ( 544 Sq.ft. ) |
| FLAT | 17.94 Sq.mts. ( 193 Sq.ft. ) |
| FLAT | 22.07 Sq.mts. ( 238 Sq.ft. ) |
| FLAT | 22.45 Sq.mts. ( 242 Sq.ft. ) |
| FLAT | 24.91 Sq.mts. ( 268 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Samruddhi Residency Phase-1last updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Open Space Available |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Electric Meter Room To Be Provided |
|
|
|
Na |
Fire Protection And Fire Safety
Requirements
|
|
Na |
Landscaping & Tree Planting
|
|
Na |
|
|
|
Available |
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
|
|
Provided |
Solid Waste Management And Disposal
|
|
Na |
|
|
|
Yet To Be Started |
|
|
|
Will Be Provided |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting
|
|
Rain Water Harvesting Will Be Done |
Water Supply100% completed
|
|
Borewell Provided |
Buildings / Wings in Samruddhi Residency Phase-1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Samruddhi Residency Phase-1 by Dharmi Constructionslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
85
apartments in total
Saleable Area Statistics (Sq. ft.)
28156
Total
Total 85 apartments in project. 27 apartments booked. 31% apartments booked.
Total 28156 Sq.ft. saleable area. 10176 saleable area booked.
36% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building No-3 | May 2023 | 4 | 1 | 0 | 1 | 0 | 2 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 2 BHK | 50.4 Sq.mts. ( 543 Sq.ft. ) | 4 | |
| FLAT | 27.99 Sq.mts. ( 301 Sq.ft. ) | 1 | |
| FLAT | 28.15 Sq.mts. ( 303 Sq.ft. ) | 1 | |
| FLAT | 28.55 Sq.mts. ( 307 Sq.ft. ) | 1 | |
| FLAT | 29.08 Sq.mts. ( 313 Sq.ft. ) | 1 | |
| FLAT | 31.1 Sq.mts. ( 335 Sq.ft. ) | 4 | |
| FLAT | 33.94 Sq.mts. ( 365 Sq.ft. ) | 4 | |
| FLAT | 34.25 Sq.mts. ( 369 Sq.ft. ) | 12 | |
| FLAT | 34.55 Sq.mts. ( 372 Sq.ft. ) | 1 | |
29 total apartments / 15 apartments booked. 51% apartments booked. |
| Work Description in Building Building No-3 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building No-4 | May 2023 | 4 | 1 | 0 | 1 | 0 | 2 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| FLAT | 20.15 Sq.mts. ( 217 Sq.ft. ) | 1 | |
| FLAT | 26.44 Sq.mts. ( 285 Sq.ft. ) | 4 | |
| FLAT | 26.85 Sq.mts. ( 289 Sq.ft. ) | 1 | |
| FLAT | 27.57 Sq.mts. ( 297 Sq.ft. ) | 1 | |
| FLAT | 31.1 Sq.mts. ( 335 Sq.ft. ) | 1 | |
| FLAT | 34.25 Sq.mts. ( 369 Sq.ft. ) | 16 | |
| FLAT | 41.18 Sq.mts. ( 443 Sq.ft. ) | 1 | |
| FLAT | 50.5 Sq.mts. ( 544 Sq.ft. ) | 4 | |
29 total apartments / 12 apartments booked. 41% apartments booked. |
| Work Description in Building Building No-4 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building No-5 | May 2023 | 4 | 1 | 0 | 1 | 0 | 4 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| FLAT | 17.94 Sq.mts. ( 193 Sq.ft. ) | 3 | |
| FLAT | 22.07 Sq.mts. ( 238 Sq.ft. ) | 8 | |
| FLAT | 22.45 Sq.mts. ( 242 Sq.ft. ) | 15 | |
| FLAT | 24.91 Sq.mts. ( 268 Sq.ft. ) | 1 | |
27 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Building No-5 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Dharmi Constructions
for Project
Samruddhi Residency Phase-1
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |