Project overview

Samaira Residency is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000032801. Samaira Residency is located at Survey No 75. This is a New being developed by Av Crystal Space.

Samaira Residency has 1 BHK & 2 BHK Apartments with carpet areas ranging from 299 to 422 Sq.ft. Carpet. The Project has total 109 of which 10 are currently available for sale.

Samaira Residency is being developed on a total land area of 5448 Sq.ft. Samaira Residency has 1 Wings / Towers C Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Samaira Residency
  • Location:
  • Survey No 75
  • Const. Stage:
    New
  • Possession:
    31 Dec 2026
Developer Details

  • Developer:
    Av Crystal Space
  • Phone:
  • Address:
  • Sanskruti Apartment
Project RERA Details
MAHA REARA No: P99000032801
Project Type Residential / Group Housing
RERA Project Status New
Architect Sanat Mehta And Associates
Funding Bank AXIS BANK
Proposed Possession 31 Dec 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 29 Jan 2022
Last Retrived 28 Jul 2025
Samaira Residency QR Code
Samaira Residency
MahaRERA - P99000032801
Apartment Details & Configuration
TypeArea
1 BHK27.77 Sq.mts. ( 299 Sq.ft. )
1 BHK28.65 Sq.mts. ( 308 Sq.ft. )
2 BHK39.22 Sq.mts. ( 422 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Samaira Residencylast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Water Supply35% completed
35% Complete
Vvcmc Charges Paid
Water Conservation, Rain water Harvesting50% completed
50% Complete
0
Treatment And Disposal Of Sewage And Sullage Water50% completed
50% Complete
0
Street Lighting
Na
Storm Water Drains50% completed
50% Complete
0
Solid Waste Management And Disposal50% completed
50% Complete
0
Sewerage (Chamber, Lines, Septic Tank , STP)50% completed
50% Complete
0
Open Parking
Na
Landscaping & Tree Planting50% completed
50% Complete
0
Fire Protection And Fire Safety Requirements50% completed
50% Complete
0
Energy management
0
Electrical Meter Room, Sub-Station, Receiving Station10% completed
10% Complete
0
Community Buildings
Na
Aggregate area of recreational Open Space
Na
Buildings / Wings in Samaira Residency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Samaira Residency by Av Crystal Spacelast updated on 28 Jul 2025 as per information obtained from MARA RERA.

5448 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

109 apartments in total
Total
109
Booked
99
Available
10

Saleable Area Statistics (Sq. ft.)

36535 Total
Total
36535
Booked
33252
Available
3283
Total 109 apartments in project. 99 apartments booked. 90% apartments booked.
Total 36535 Sq.ft. saleable area. 33252 saleable area booked.
91% area booked.

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingDec 2026241010019
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.77 Sq.mts. ( 299 Sq.ft. )28
25 Booked89% Booked
89% Booked
1 BHK28.65 Sq.mts. ( 308 Sq.ft. )53
48 Booked90% Booked
90% Booked
2 BHK39.22 Sq.mts. ( 422 Sq.ft. )28
26 Booked92% Booked
92% Booked
109 total apartments / 99 apartments booked. 90% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress29% done
29% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress45% done
45% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Av Crystal Space
for Project
Samaira Residency
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation