Project overview

Sai Yashodhan Bldg No. 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000005416. Sai Yashodhan Bldg No. 2 is located at 145. This is a Ongoing being developed by Deepak Sadanand Hanchate.

Sai Yashodhan Bldg No. 2 has 1 BHK & 2 BHK Apartments with carpet areas ranging from 379 to 591 Sq.ft. Carpet. The Project has total 63 of which 26 are currently available for sale.

Sai Yashodhan Bldg No. 2 is being developed on a total land area of 18531 Sq.ft. Sai Yashodhan Bldg No. 2 has 2 Wings / Towers Wing A,Wing B

ProjectDeveloperLocationPossession
Veer 2Veer Global Infraconstruction Limited154/A, 185, 18731-12-2019 00:00:00
Triveni LotusTrivenilandspacePalghar30-06-2018 00:00:00
Parasnath NagariShreenath EnterprisesUmroli31-08-2022 00:00:00
Mahadeep Building No. 1 Type A And Type A 2 Wing A And Wing BMahadeep Builders And DevelopersSurvey No. 154/A. 185, 18731-12-2019 00:00:00
Mukunda ParkSurendrakumar SinghVillage Umroli, Taluka Palghar Dist. Palghar, 40140431-12-2019 00:00:00
Abhishek ApartmentSandeep Vyas40140430-12-2022 00:00:00
Swapnalok Residency Phase Ii Riddhi Building Wing B And CDhanesh Chand PatwaGut No 462/B30-12-2020 00:00:00
Comfort Residency Bldg 4 Wing A And Bldg 5 Wing AComfort InfraPlot Bearing Gut No 19530-03-2022 00:00:00
Parasnath TownshipShreenath Enterprises392 393 394A 394B31-03-2020 00:00:00
Veer - 4Veer Global Infraconstruction Limited184/A30-09-2020 00:00:00
Swapnalok Residency Phase IiAshapura Builders & DevelopersGhut No 46231-12-2018 00:00:00
Gokul Dham AptSaakar EnterprisesGut No 154/B,184/2,18506-12-2019 00:00:00
Adore Gardens Bldg No 2 And 3Satgharebuildcon Pvt.Ltd61 And 6230-12-2025 00:00:00
Ideal Park Bldg No 2Shree Ganesh EnterprisesUmroli East31-10-2019 00:00:00
Ideal ResidencyShree Shiv Shakti Builders And DevelopersStation Road30-06-2022 00:00:00
Building No.1, Ideal Garden, Type B1B, Wing BRajkumar Vishwakarma401404, Umroli, Palghar31-07-2019 00:00:00
Adore GardensAdore Realty LlpPalghar, Umroli, 40140430-12-2024 00:00:00
Ideal GardenShree Shiv Kripa Builders &Amp; Developer401404, Palghar, Umroli Road30-12-2019 00:00:00
Adore-4Ananta ContructionOpp. Umroli Station30-09-2020 00:00:00
Vrindhavan ComplexHolystone Construction Private Limited12630-12-2023 00:00:00
Ideal Avenue Building No 3 Type B1d Wing BShree Sai Samarth Builders And DevelopersSurvey No 179, 180, 18130-12-2022 00:00:00
Pratham ResidencyCreative ConstructionsPlot No.2/Survey Number 131/301-09-2018 00:00:00
Sai Yashodhan Bldg No.1Deepak Sadanand Hanchate14231-03-2018 00:00:00
Ideal ResidencyIdeal PropertiesPalghar30-06-2022 00:00:00
Rajmandir GardensRaj Mandir RealityGut No-79, 80A, 80B30-12-2023 00:00:00
Vajreshwari ApartmentShree Adeshwar BuildcomGut No 19330-12-2022 00:00:00
Nest LotusNest Enterprises13331-12-2018 00:00:00
Gunaji Vasudeo ComplexPurshotam Gopaldas SehwaniG57ut No31-12-2019 00:00:00
Abhishek AppartmentOm Shri Sai ConstructionStation Road31-12-2020 00:00:00
Parasnath Garden-S No 182-3 196-7Shreenath EnterprisesUmroli31-08-2022 00:00:00
Diya EnclaveMegha Shah401404, Palghar31-10-2017 00:00:00
Parasnath Garden- Sno 200-1-2Shreenath EnterprisesS No 200-201-202-Umaroli30-09-2026 00:00:00
Godavari ParkGanesh Krupa DevelopersS N 71/B/130-06-2022 00:00:00
Shiv PlazaGanesh Thakur20930-12-2022 00:00:00
Shiv KrupaShivaay RealtyGut No.184/A, Village Umroli, District Palghar28-11-2022 00:00:00
MalharHarikrishna EnterprisesS N 7731-01-2021 00:00:00
Ideal Avenue ,Bldg No.3,A-WingSnehal Arnest DcunhaGut No. 179.180,18131-01-2021 00:00:00
Sai Yashodhan Bldg No. 2Deepak Sadanand Hanchate14531-12-2018 00:00:00
Aadeshwar-2Shree Adeshwar Buildcom154/A, 185,18730-12-2020 00:00:00
Sadguru EmpireGuru Prasad Construction CompanyPalghar, 40140431-12-2024 00:00:00
Ajayraj ExcellencyAjayraj Realtors Pvt Ltd401404, Palghar31-07-2018 00:00:00
Sai HeightsShree Sai Shradha Developers19531-12-2029 00:00:00
Mahavir ArcadeMahavir Developers And RealtorsGut No. 170 31-12-2028 00:00:00
Veer 10Veer Global Infraconstruction Limited184/A30-12-2023 00:00:00
Jai Mataji ApartmentJai Mataji DevelopersSurvey No.18331-12-2027 00:00:00
Anand ViharAman RealtorsG No 234/331-12-2026 00:00:00
Central ParkS. P. EnterprisesGut No. 241/1, 2, 3, 5, 6, 731-12-2028 00:00:00
Project Details
  • Project:
    Sai Yashodhan Bldg No. 2
  • Location:
  • 145
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2018
Developer Details

  • Developer:
    Deepak Sadanand Hanchate
  • Phone:
  • Address:
  • Sunshine Commercial Complex
Project RERA Details
MAHA REARA No: P99000005416
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Ajay Wade
Funding Bank IDBI BANK
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession 29 Dec 2025
Litigations No Litigations
Last Modified 31 Jan 2024
Last Retrived 28 Jul 2025
Sai Yashodhan Bldg No. 2 QR Code
Sai Yashodhan Bldg No. 2
MahaRERA - P99000005416
Apartment Details & Configuration
TypeArea
1 BHK31.78 Sq.mts. ( 342 Sq.ft. )
1 BHK33.08 Sq.mts. ( 356 Sq.ft. )
1 BHK38.83 Sq.mts. ( 418 Sq.ft. )
1RK22.74 Sq.mts. ( 245 Sq.ft. )
2 BHK54.77 Sq.mts. ( 590 Sq.ft. )
Shop7.17 Sq.mts. ( 77 Sq.ft. )
Shop11.6 Sq.mts. ( 125 Sq.ft. )
Shop14.21 Sq.mts. ( 153 Sq.ft. )
Shop19.77 Sq.mts. ( 213 Sq.ft. )
1 BHK35.2 Sq.mts. ( 379 Sq.ft. )
1 BHK39.67 Sq.mts. ( 427 Sq.ft. )
2 BHK54.9 Sq.mts. ( 591 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sai Yashodhan Bldg No. 2last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
0
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
0
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
0
Solid Waste Management And Disposal
0
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
0
Water Supply
0
Buildings / Wings in Sai Yashodhan Bldg No. 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sai Yashodhan Bldg No. 2 by Deepak Sadanand Hanchatelast updated on 28 Jul 2025 as per information obtained from MARA RERA.

18531 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

63 apartments in total
Total
63
Booked
37
Available
26

Saleable Area Statistics (Sq. ft.)

25875 Total
Total
25875
Booked
14651
Available
11224
Total 63 apartments in project. 37 apartments booked. 58% apartments booked.
Total 25875 Sq.ft. saleable area. 14651 saleable area booked.
57% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing ADec 20234101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.78 Sq.mts. ( 342 Sq.ft. )3
2 Booked66% Booked
66% Booked
1 BHK33.08 Sq.mts. ( 356 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK38.83 Sq.mts. ( 418 Sq.ft. )24
13 Booked54% Booked
54% Booked
1RK22.74 Sq.mts. ( 245 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK54.77 Sq.mts. ( 590 Sq.ft. )4
2 Booked50% Booked
50% Booked
Shop7.17 Sq.mts. ( 77 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop11.6 Sq.mts. ( 125 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop14.21 Sq.mts. ( 153 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop19.77 Sq.mts. ( 213 Sq.ft. )1
1 Booked100% Booked
100% Booked
38 total apartments / 23 apartments booked. 60% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress80% done
80% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress60% done
60% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BDec 20234101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.2 Sq.mts. ( 379 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK38.83 Sq.mts. ( 418 Sq.ft. )16
9 Booked56% Booked
56% Booked
1 BHK39.67 Sq.mts. ( 427 Sq.ft. )4
2 Booked50% Booked
50% Booked
2 BHK54.9 Sq.mts. ( 591 Sq.ft. )4
3 Booked75% Booked
75% Booked
25 total apartments / 14 apartments booked. 56% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress60% done
60% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress60% done
60% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Deepak Sadanand Hanchate
for Project
Sai Yashodhan Bldg No. 2
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation