Project overview

Sai World is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700034155. Sai World is located at Survey No 181 H No 2/3/4/A. This is a New being developed by Pinnacle Corporation.

Sai World has 1 BHK & 1RK Apartments with carpet areas ranging from 220 to 342 Sq.ft. Carpet. The Project has total 112 of which 18 are currently available for sale.

Sai World is being developed on a total land area of 27933 Sq.ft. Sai World has 2 Wings / Towers C Wing,D Wing

ProjectDeveloperLocationPossession
Vishnu Vatika Wing A And B Phase IVishnu VatikaS No 131 Hissa 2 And 431-10-2019 00:00:00
Prime Balaji HeightPrime Housing421503, Thane31-12-2019 00:00:00
Ganpati ResidencyGanpati ResidencySurvey No 139 Hissa No 3B30-12-2023 00:00:00
Project Details
  • Project:
    Sai World
  • Location:
  • Survey No 181 H No 2/3/4/A
  • Const. Stage:
    New
  • Possession:
    31 Mar 2026
Developer Details

  • Developer:
    Pinnacle Corporation
  • Phone:
  • Address:
  • Shreeji Centre
Project RERA Details
MAHA REARA No: P51700034155
Project Type Residential / Group Housing
RERA Project Status New
Architect Pramod V Patil And Associates
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 31 Mar 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 24 Mar 2022
Last Retrived 26 Jul 2025
Sai World QR Code
Sai World
MahaRERA - P51700034155
Apartment Details & Configuration
TypeArea
1 BHK30.84 Sq.mts. ( 332 Sq.ft. )
1 BHK31.2 Sq.mts. ( 336 Sq.ft. )
1 BHK32.17 Sq.mts. ( 346 Sq.ft. )
1RK21.35 Sq.mts. ( 230 Sq.ft. )
1 BHK31.79 Sq.mts. ( 342 Sq.ft. )
1RK20.44 Sq.mts. ( 220 Sq.ft. )
1RK21.37 Sq.mts. ( 230 Sq.ft. )
1RK21.39 Sq.mts. ( 230 Sq.ft. )
1RK21.5 Sq.mts. ( 231 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sai Worldlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
At The Time Of Possession
Electrical Meter Room, Sub-Station, Receiving Station50% completed
50% Complete
Before Completion
Energy management
Solar Energy To Be Provided
Fire Protection And Fire Safety Requirements
Before Completion
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Stp Not Provided Only Septic Tank At Possession
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Before Completion
Water Supply
After Completion
Buildings / Wings in Sai World
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sai World by Pinnacle Corporationlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

27933 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

112 apartments in total
Total
112
Booked
94
Available
18

Saleable Area Statistics (Sq. ft.)

33273 Total
Total
33273
Booked
28752
Available
4521
Total 112 apartments in project. 94 apartments booked. 83% apartments booked.
Total 33273 Sq.ft. saleable area. 28752 saleable area booked.
86% area booked.

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingMar 20268101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.84 Sq.mts. ( 332 Sq.ft. )7
6 Booked85% Booked
85% Booked
1 BHK31.2 Sq.mts. ( 336 Sq.ft. )21
18 Booked85% Booked
85% Booked
1 BHK32.17 Sq.mts. ( 346 Sq.ft. )14
14 Booked100% Booked
100% Booked
1RK21.35 Sq.mts. ( 230 Sq.ft. )7
5 Booked71% Booked
71% Booked
49 total apartments / 43 apartments booked. 87% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D WingMar 20268101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.2 Sq.mts. ( 336 Sq.ft. )21
21 Booked100% Booked
100% Booked
1 BHK31.79 Sq.mts. ( 342 Sq.ft. )7
7 Booked100% Booked
100% Booked
1RK20.44 Sq.mts. ( 220 Sq.ft. )7
3 Booked42% Booked
42% Booked
1RK21.37 Sq.mts. ( 230 Sq.ft. )14
7 Booked50% Booked
50% Booked
1RK21.39 Sq.mts. ( 230 Sq.ft. )7
7 Booked100% Booked
100% Booked
1RK21.5 Sq.mts. ( 231 Sq.ft. )7
6 Booked85% Booked
85% Booked
63 total apartments / 51 apartments booked. 80% apartments booked.
Work Description in Building D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Pinnacle Corporation
for Project
Sai World
last updated on 26 Jul 2025 as per information obtained from MARA RERA.