Project overview

Sai Tirth Phase Ii is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700034566. Sai Tirth Phase Ii is located at Fs6kvy5noojvw+/Jc02uh8yq+Uxmw1pan7q/Oodcntqi+Bnpkf1rum2wywftuqpc. This is a New being developed by Pinnacle Corporation.

Sai Tirth Phase Ii has 1 BHK, 1RK & 2 BHK Apartments with carpet areas ranging from 241 to 445 Sq.ft. Carpet. The Project has total 48 of which 3 are currently available for sale.

Sai Tirth Phase Ii is being developed on a total land area of 24004 Sq.ft. Sai Tirth Phase Ii has 2 Wings / Towers Jamuna Wing C,Jamuna Wing D

ProjectDeveloperLocationPossession
Usha Kiran Residency F1 F2Stalwart Impex Pvt LtdDvhm9gcfbb9bkkfwzbjz+Nl2zrneit1svcpvji2vscs2lawfm6kvg+Wihcb8gwes31-12-2018 00:00:00
Panvelkar Nisarg Phase-IPanvelkar Realty Private Limited/O4ghhppssvem5hgolfowsjc56tvhm2hw+Ro6u8mieq=30-12-2018 00:00:00
Shivshakti GreensShivshakti RealityIcbqfwj66tddzlszbg+W0nbki8hjxlaqrfmowncz92f8ptqi8pwpmlji7owtprvt30-12-2022 00:00:00
Evergreen Residency Wing A,B,D,EBalaji ConstructionJiezya7eqrld+Ae6dsir2musy0c0o788suaidqwwr8tcuj4/Pud8sif+Jzxrxqkvc/0Rmas2z22cllszndvwia==30-12-2022 00:00:00
Godrej Vihaa Phase 5K. R. Real Estate Pvt. Ltd.Thane, 42150230-12-2031 00:00:00
Samruddhi Evergreen-Phase-4BPoddar Housing And Development LimitedVoxc+48Njbiw1p7ft2mvkdwrmjzxzhprx3zg2+Lchw4=31-03-2019 00:00:00
Usha Kiran Residency Wing E1 E2 E3Usha Construction CoDvhm9gcfbb9bkkfwzbjz+Nl2zrneit1svcpvji2vscs2lawfm6kvg+Wihcb8gwes31-12-2017 00:00:00
Dhruvika EnclaveManoyadnya DevelopersOuezdnty4ohcmsanpfko3g==30-09-2020 00:00:00
Sarvesh Dream CitySai Shradha Developers68Cwvrs9tc2maedxzodhsxjljgjsbcogebysglq+//0=28-11-2022 00:00:00
Neelkanth JyotPrapti EnterprisesAs23fknch11xz+Qlagfsyg==30-06-2019 00:00:00
Vrindavan NiketanPrakash Bhojraj ShewaniJ3jbfqxikgmjysbh5qwels9vnxhai/Opicfmj4vyydfmspgaerubsqamfxnvc/G131-12-2018 00:00:00
Daimond LifespaceEkveera Skyliner Construction Co Private LimitedOirdiwyal6eq6gx49jo6sq==31-12-2018 00:00:00
Ekveera GardensPradeep DhuleThane, 42150331-12-2018 00:00:00
Daimond Lifespace Wing 4Ekveera Skyliner Construction Co Private Limited421503, Thane31-12-2019 00:00:00
Sky Gardens At Godrej VihaaK. R. Real Estate Pvt. Ltd.Llqanehpj8lilu+Ujvj7fjnrtomzzbxhtzjzze2fvjfcufbqkq4h0lgmcuaa0ndik5jqhr1u3vtadooczjmtea==30-12-2023 00:00:00
Panvelkar Estate - Stanford - Phase Ii - R1 - BPanvelkar Infrastructures Private LimitedNexw1kqjz30klsijsmktmw/Aqzsyb21toggis/Jjxkg=31-12-2024 00:00:00
Sharmila ResidencyAnnapurna EnterprisesNpqzdnr01ptheyob8oj0kg==31-03-2025 00:00:00
Panvelkar Estate - Greenford - E WingPanvelkar Infrastructures Private LimitedJps36namcovpv+Xnkreumbxf3aqvjwb6p89owduwrmu=31-12-2025 00:00:00
Samruddhi Evergreens-Phase-4APoddar Housing And Development LimitedQ2bcjwn7temxjscq98zmqg==31-03-2018 00:00:00
AMBAR VAASTU PHASE-II, C-WINGBALAJI HOMESSurvey No 37, Hissa No 1,2,3/1/A, 3/1/B31-03-2027 00:00:00
Dashmesh HeightsDashmesh InfrastructureOwinrgnf395h/Jt0iqszgeizirgw0jantde9fsukpmm=31-12-2029 00:00:00
Tulsi AawasRaj GroupTteukdfhuycpc6db1eupjkpw11zzipqlttepqnips4g=31-12-2024 00:00:00
Dashmesh EmpireDashmesh InfrastructureRzjkoocd5ip8b5yqgq7vww==30-06-2027 00:00:00
Tulsi AaradhanaRaj GroupJnlhn/Av5b17krvykuljgvn6az3brfmd6j+J6oo/8Obzlvke7wytouzmq7vtcwor31-12-2025 00:00:00
Panvelkar Greens - Phase IEshan DevelopersMkqzw6fstvrelosvxubm1xwsacpcwg1i9usnvh+Orv68/Pcse1l7xphriy+Km3dc31-12-2025 00:00:00
Dashmesh Crystal Phase 2Dashmesh Infrastructure3Pclorwmazpeuvkd8e1wlq==30-06-2024 00:00:00
Sai Tirth Phase IiPinnacle CorporationFs6kvy5noojvw+/Jc02uh8yq+Uxmw1pan7q/Oodcntqi+Bnpkf1rum2wywftuqpc31-03-2025 00:00:00
SiddhicitySiddhitech Homes Private LimitedLnqnecvnbhzosyyyjdvjga==30-06-2018 00:00:00
Siddhicity Phase-VSiddhitech Homes Private LimitedMcg9e5dlujk86filvw5ozv3addy0+Pk5rebowndckcrvgillmylyx0vqbiefjppx31-12-2019 00:00:00
Adiraj CrystalShree Adiraj Laxmi Builders Pvt. LtdThane, 42150331-12-2017 00:00:00
Sai ResidencySai Raj DevelopersRegk1zwun3vb5rlxhc29e6tnf20egqo8vusy6n7ysw4=30-12-2021 00:00:00
Matoshree ParkShree Trupati Balaji RealtorsG4hxr3mgprwxt7mu99j0n3tobzs/Kiwtqy96yem1z61k6jmtcm+Vbaas6ip69wxf30-08-2018 00:00:00
Uma Ashish B WingParasiya DevelopesB0tnbv/8Sa9wf6malhfthkcg4xr/Dlmocliqkdpd/Me=31-07-2018 00:00:00
Godrej Vihaa Phase 2K. R. Real Estate Pvt. Ltd.Vidxitxiuyxgxdpujwaw/85Xalxkcjqm2zqfwmqtcab1zp5nphmaehr5qiuzdhl214-08-2022 00:00:00
Godrej Vihaa Phase 1K. R. Real Estate Pvt. Ltd.Qafwulltxctdnwnvlzlufl8k5xvsahyiln7sqxu+Xh8l0+6Ofxxqxri7j+Jbyhipfgzkyhd5l2zwb0qcpqclpg==30-07-2022 00:00:00
Arihant Anmol Phase IiArihant Vatika Realty Private Limited0Zjajbw0dqrwpvkhky0jbgw3qqtja4cy5dcvwqyvra4=30-09-2020 00:00:00
Panvelkar Nisarg Phase Ii Building A2Panvelkar Realty Pvt LtdEwhelomnrunhio6fw7xrxlv/8Ji3apuxgbdsvlgltxj7yl3ptgcf5r+Gv8vefcky31-12-2026 00:00:00
Nano CityPinnacle Spm GroupPhsolf3thqiwun7058jpsipwc7uupe5zvadgib4t/Ug=31-12-2027 00:00:00
SHREE HILL RESIDENCYSADGURU CORPORATIONS. No. 76, Hissa No. 1131-03-2026 00:00:00
Panvelkar Nisarg Phase - IiPanvelkar Realty Private Limited0Wskjw13rxvl2ovlkl1f9kknfqnef56y2icexzisgskyqvxcs+Jhgcckh3d0xv9x30-06-2023 00:00:00
Blossom HeightShiv Sai ConstructionsNgbixk6xqdkv0pqu7gtdgw==31-12-2024 00:00:00
Shree Sadguru KrupaShree Sai Aashray Developers31-12-2026 00:00:00
Panvelkar Bhoomi Building No 5,6,7,8,9Panvelkar BhoomiC8rdvdolywf5z3eptnppaglcexexo0nytz9fmb8fads=31-12-2025 00:00:00
Sai CastlePinnakle Lifespaces Llp31-12-2028 00:00:00
Sai MatoshreeUnnadhra Lifespaces Llp31-12-2028 00:00:00
Uma VatikaUma CreativeTnk5fn63fca9j335f5olbixbrqzqffno7iaugdi/Fzi=30-06-2019 00:00:00
Dashmesh CrystalDashmesh InfrastructureW7fehctxxfcehmhvaasaag==30-12-2023 00:00:00
Deep DharaM/S. Deepali Infracon Llp3Rshi+Ss9fobyp/Cw/Qrjw/Soj7mo6qobcp8628li9y=31-12-2025 00:00:00
Tulsi AanantaShree DevelopersDwhg/T1craxi/7Iqkv+Imtunrcqrbz6z8g01hm2nfbvkcwcqcrcpoy54j+Fhgkcl31-12-2028 00:00:00
Patels MeadowsTrishul EnterprisesErfgtcofxylgtf0jkmp/Oinpv0adrjgx/L9v8e+/Rhu=31-12-2029 00:00:00
Platinum Sagar Jewel Wing D And EPlatinum Sagar HomesPldzmco81zwt/Gteq0v1jxepb5rei92xtxdozrswaklm0iuuqh3rnox+8Jsqa+4L3dukn/Z53wdrhtpvb8ir2a==30-05-2019 00:00:00
Shree Uma Shankar ApartmentShree Sai Aashray DevelopersRhxdzqvutmqmostaeqiyhv/Mj5lsnepx5+3Znh87g30=31-03-2018 00:00:00
Project Details
  • Project:
    Sai Tirth Phase Ii
  • Location:
  • Fs6kvy5noojvw+/Jc02uh8yq+Uxmw1pan7q/Oodcntqi+Bnpkf1rum2wywftuqpc
  • Const. Stage:
    New
  • Possession:
    31 Mar 2025
Developer Details

  • Developer:
    Pinnacle Corporation
  • Phone:
  • Address:
  • Shreeji Centre
Project RERA Details
MAHA REARA No: P51700034566
Project Type Residential / Group Housing
RERA Project Status New
Architect Pramod V Patil And Associates
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 31 Mar 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 11 Apr 2022
Last Retrived 13 Feb 2026
Sai Tirth Phase Ii QR Code
Sai Tirth Phase Ii
MahaRERA - P51700034566
Apartment Details & Configuration
TypeArea
1 BHK30.27 Sq.mts. ( 326 Sq.ft. )
1 BHK31.1 Sq.mts. ( 335 Sq.ft. )
1RK21.07 Sq.mts. ( 227 Sq.ft. )
1RK21.33 Sq.mts. ( 230 Sq.ft. )
1 BHK33.82 Sq.mts. ( 364 Sq.ft. )
1RK22.43 Sq.mts. ( 241 Sq.ft. )
2 BHK41.38 Sq.mts. ( 445 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sai Tirth Phase Iilast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
At The Time Of Possession
Electrical Meter Room, Sub-Station, Receiving Station50% completed
50% Complete
Before Completion
Energy management
Solar Enrgy To Be Provided
Fire Protection And Fire Safety Requirements
Before Completion
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Stp Not Provided Only Septic Tank At Possession
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Before Completion
Water Supply
After Completion
Buildings / Wings in Sai Tirth Phase Ii
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sai Tirth Phase Ii by Pinnacle Corporationlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

24004 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

48 apartments in total
Total
48
Booked
45
Available
3

Saleable Area Statistics (Sq. ft.)

14456 Total
Total
14456
Booked
13449
Available
1007
Total 48 apartments in project. 45 apartments booked. 93% apartments booked.
Total 14456 Sq.ft. saleable area. 13449 saleable area booked.
93% area booked.

Jamuna Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Jamuna Wing CMar 20257101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.27 Sq.mts. ( 326 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK31.1 Sq.mts. ( 335 Sq.ft. )6
5 Booked83% Booked
83% Booked
1RK21.07 Sq.mts. ( 227 Sq.ft. )6
5 Booked83% Booked
83% Booked
1RK21.33 Sq.mts. ( 230 Sq.ft. )6
6 Booked100% Booked
100% Booked
24 total apartments / 22 apartments booked. 91% apartments booked.
Work Description in Building Jamuna Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress70% done
70% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress80% done
80% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Jamuna Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Jamuna Wing DMar 20257101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.82 Sq.mts. ( 364 Sq.ft. )6
6 Booked100% Booked
100% Booked
1RK22.43 Sq.mts. ( 241 Sq.ft. )12
12 Booked100% Booked
100% Booked
2 BHK41.38 Sq.mts. ( 445 Sq.ft. )6
5 Booked83% Booked
83% Booked
24 total apartments / 23 apartments booked. 95% apartments booked.
Work Description in Building Jamuna Wing DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress70% done
70% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress80% done
80% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Pinnacle Corporation
for Project
Sai Tirth Phase Ii
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation