Project overview

Sai Savali Building A1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000026399. Sai Savali Building A1 is located at 62 Part 2. This is a New being developed by Mayfair Enterprises.

Sai Savali Building A1 has 1 BHK, 1RK, 2 BHK & Shop Apartments with carpet areas ranging from 129 to 98 Sq.ft. Carpet. The Project has total 39 of which 12 are currently available for sale.

Sai Savali Building A1 is being developed on a total land area of 43056 Sq.ft. out of which 4318 Sq.ft. i.e 10% is reserved for recreational purposes. Sai Savali Building A1 has 1 Wings / Towers Sai Savali Building A1

ProjectDeveloperLocationPossession
Master BuildconMaster BuildconGut No 27 Plot No 1630-03-2022 00:00:00
Sai Tirth Phase IPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KasturiJ.K.InfraS R No 130 Hissa No 330-12-2024 00:00:00
Bhakti ParkShivkrupa Enterprises730-03-2023 00:00:00
Priti ApartmentMahesh Mahadu Tare579 To 583 , 604 A And B30-12-2022 00:00:00
Raj Regalia Phase-1AAmrut Laxmi DevelopersS No. 54/3/E, 55/2, 55/330-06-2023 00:00:00
Sai PurabWestern Arch Developers9/1/230-09-2023 00:00:00
Akshar EvannaM/S Akshar Om ConstructionPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B And B1Rassaz Infrastructure Private Limited369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
Dipti Sky City Phase 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
Snehal Paradise Wing AM/S Krishna DevelopersS No 2A H No 2B31-01-2020 00:00:00
Shree RajRajententerprisesSr No 39 H No 530-04-2019 00:00:00
Lodha Quality Home Tower 4Macrotech Developers Limited32/10P, 32/15P, 32/14P30-09-2024 00:00:00
Vishwajeet Pink CityGulabrao Baburao Karanjule PatilGut No.48, Plot No.15,19,23,24,25,26,27 And 3730-05-2025 00:00:00
Spm Lake City Phase Ii Part 1Kothari & Deshmukh Landmark LlpSurvey No 56 Hissa No 230-01-2026 00:00:00
Mohankheda GreensRajeshkumar Moolchand RupawatSurvey No 38 Hissa No 330-12-2023 00:00:00
Ozone GalaxyHallmark Infra Realty Llp64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
Shubham Galaxy - B WingNavkar Associates4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Shafique Khatimiti TowerRameez Shahnawaz MajeedCts 126430-12-2021 00:00:00
ElementsUma RealtyC. S. No. 27/130-12-2023 00:00:00
Shree Siddhivinayak Park Wing A1 And A2Satyashiv DevelopersS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
Swami Samarth ApartmentMhatre Developers1231A30-03-2023 00:00:00
Yashoghar ChsBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
Vishwajeet Precious Phase IAbhijeet PrideSurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
Shreeman Residency B And C WingOm EnterprisesSurvey No 1 Hissa No 14/2, 14/1/230-12-2029 00:00:00
ValenciaImpressionsC T S No 2065 To 2068, 1465 And 146630-06-2024 00:00:00
Silver Creast Wing -A Phase - IiShrikrishna EnterprisesS No 83 H No 1430-03-2026 00:00:00
Arjun VillaManohar Sahebrao Kadam192-J230-03-2022 00:00:00
Dosti Greater Thane - Phase 1Adrika Developers Private Limited9/4 Pt,7/8 Pt,7/1Pt, 11/25Pt,11/23Pt,12/19Pt,7/13Pt,11/17Pt,11/12Pt,11/13Pt,11/7Pt,11/1Pt,11/8Pt,11/18Pt,11/19A Pt,11/19B Pt,11/15Pt,11/16Pt,11/14Pt,11/11Pt,12/9Pt,11/21Pt01-04-2026 00:00:00
Regency Park Iii Building No 2Johar Hasan ZojwallaCts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
Seasons SaharaSamarth Sai Builders & DevelopersS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/S Vedant Chetana Enterprises NxS No.380, Cts No 133230-12-2023 00:00:00
PadmanabhYash Govinda Build Infra LlpTika No.10, C.T.S No.222B24-10-2023 00:00:00
Orchid A To LPalava Dwellers Pvt Ltd27Pt And 139/2 Pt30-06-2018 00:00:00
Tanisha HeightsM/S. Balaji DevelopersCts No. 1962-197230-03-2023 00:00:00
Gayatri EleganceGayatrikripa Developers Private LimitedOld Survey No. 229, Hissa No. 1330-12-2025 00:00:00
Shree Saishraddha Apartment Building AShree Saishraddha EnterprisesSurvey No 9/3 And 16/130-03-2023 00:00:00
Pinnacolo NxSkd Realty LlpOld S.No.445,New S.No.12930-06-2025 00:00:00
Akshar Business Park- Phase IiiAkshar DevelopersPlot No. 3, Sector-2531-07-2022 00:00:00
Swaraj OrchidM/S Crystal HomesSurvey No 25 Hissa No 230-12-2022 00:00:00
Surya ComplexM/S. Jai Santoshi Maa EnterprisesS. No. 102, H. No.2, 3 Pt, 5, 17, 1830-06-2023 00:00:00
Navare PlazaOm Developers8028 8029 803028-08-2022 00:00:00
Sai HeritageMitra HomesSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
Shree Girijatmak Co Op Hou Soc LtdShree Saraswati DevelopersOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
Vimal ShreeRitesh Ramesh JainOld Sno 215 Hno 1 New Sno 198 Hno 130-12-2023 00:00:00
Sai PalacePravin Narasi Manani3630-06-2022 00:00:00
Saishiv ComplexSaishiv ConstructionSurvey No 54 By 3 Hissa No 1 And 230-12-2023 00:00:00
Siyara IconShakti Realty1/34/35/36/44/79/3/80/131-12-2025 00:00:00
SpectrumKulin Enterprises3445-3454, 3455-347401-12-2024 00:00:00
Liana CMacrotech Developers Limited65 /15 A (Pt)31-03-2026 00:00:00
Sai LeelaSaijyotbuilders&DevelopersPlot No 20 Sector 30D30-06-2024 00:00:00
Shiv HeightsBalaji DevelopersSurvey No.15 Hissa No 731-03-2023 00:00:00
Shree Sai Saburi Apartment-Building BShree Saishraddha EnterprisesSurvey No 9/3 And 16/131-03-2025 00:00:00
Mount CasaNagraj Mutha108B,112A/3, 113B31-12-2026 00:00:00
Upper Thane-Casa EdenMacrotech Developers Limited55/12 A31-03-2026 00:00:00
Omkar HeightsOmkar Builders & DevelopersCts No 114831-03-2024 00:00:00
Jay ResidencyMukesh Vithal GiteS.No. 111/H.No. 2/1/3/531-12-2024 00:00:00
Seven HeightsOvais Mudabbir BardiS No 15/1 20/2 Plot No 4 And Cts No 383831-12-2025 00:00:00
Jardino AMacrotech Developers Limited62/2 P, 62/3 P And 65/5C P31-08-2027 00:00:00
19 EastMoreshwar Developers5230-12-2025 00:00:00
Reliance GoldGolden EnterprisesS No 58/1/4 S No 59/128-02-2028 00:00:00
Basera HeightsKamruddin Hasmullah SiddiqueOld Sno 223/5 221/1 New Sno 191/5 190/130-03-2024 00:00:00
Upper Thane-Iris Wing AMacrotech Developers Limited293/1 And 293/331-12-2027 00:00:00
Jivdani BuildingMildstone Enterprises Llp133231-12-2024 00:00:00
Yashraj HeightsVikrant Vikas Raikar731-01-2025 00:00:00
Siddhivinayak GardensA1 Buildcon991, 2, 3 And 1001830-12-2024 00:00:00
Shree ShaliniJay Service And ConsultantCts No 251 And 252A30-09-2023 00:00:00
M Square It ParkPaper FlutingsA241 And A24230-03-2024 00:00:00
Vardhaman Tower Building Nos. 6 & 7Vardhaman Property DevelopersPlot Bearing Surveyno.26Hissa No1(Part)31-12-2023 00:00:00
Zircon HeightsIqbal Abdul Rauf Punjabi59/1, 83/5 Paiki, Cts No 482931-12-2024 00:00:00
Shree Ganesh SymphonyPawar GroupS. No.172, H.No.1/801-12-2025 00:00:00
Trimurti GardenSai Narayan DevelopersSurvey No 126 Hissa No 130-12-2025 00:00:00
Tulsi Aahan - B WingRaj GroupS No 39, H No 1,230-12-2022 00:00:00
Joshi ArcadeMeera DevelopersSurvey No 34-1/12, Hissa No. 3, Plot No. 731-03-2026 00:00:00
Sai Narayana ResidencyMm Landmark Realty LlpS.No.1431-12-2025 00:00:00
Balaji AnnexM/S Om Swayambhu Siddhivinayak Builders And DevelopersSurvey No 93/3, 93/4, 93/530-12-2026 00:00:00
Arya ArianaAshapura Corporation5664/A30-03-2024 00:00:00
GajananGk BuildconB6330-06-2023 00:00:00
Shree Ram Co Operative Housing Society LimitedSantosh Vasant ChitnisS No 704/2 706/6 Old , 286/2 294/6 Cts No 821 And 82231-03-2025 00:00:00
Yashshree Co.Op.Hsg.SocNitant Narendra DesaiSurvey No. 28, Hissa No. 3/2/K30-09-2025 00:00:00
Vaishnavi HightsVaishnavi Builders & Developers58,H No.1 P.No. 1 & 224-06-2024 00:00:00
Empire Industrial Centrum Phase-IiiEmpire Industries Limited22R30-03-2026 00:00:00
Empire Industrial Centrum Phase-IvEmpire Industries Limited2230-03-2025 00:00:00
Seasons Sahara Building No 2Samarth Sai Builders & DevelopersS No 24/2 At Village Adavli-Dhokli Taluka Ambernath And S No 34/10, 34/11, 34/12 At Village Pisavli Taluka Kalyan30-12-2024 00:00:00
Fatima Enclave- C WingRais Aziz Qureshi46/4 , 46/531-12-2025 00:00:00
Shree Prabhucharan Chs.LtdShree Prabhucharan Co-Op Housing Society66/5/6731-03-2024 00:00:00
Aastha OmkarAastha RealtorsS. No. 56, H. No. 35/D/2B/1 To 35/D/2B/14 And H. No. 35/D/2B/15/131-12-2026 00:00:00
Rajeshwari Residency Phase IiShree Siddhi ConstructionSurvey No 30/2, 30/3/2/1, 30/3/2/230-03-2025 00:00:00
Pinnacle RoyalPinnacle InfraGut No41, Hissa No 20, Plot No 1530-03-2023 00:00:00
Kohinoor AashiyanaKgi Realty Private Limited24/3 37/130-10-2024 00:00:00
Fiora EMacrotech Developers Limited260/1A (Pt)31-03-2026 00:00:00
Savaliya HeightsShree Savaliya Homes LlpOld Sno 477 New Sno 119 Hno 131-12-2026 00:00:00
Ramakant ArcadeVastu EnterprisesCts No. 244, 25431-05-2023 00:00:00
Platinum Square B 1Radmin Developers & Consultants Private Limited21/2,21/3/1,22/1/2,1/3,1/5,1/6,1/830-05-2025 00:00:00
Aditya NishantPremnarayan Shukla14229-01-2023 00:00:00
Ten X Habitat Raymond Realty Tower JRaymond Limited126B 1/1 Part, 129/1 Part30-06-2025 00:00:00
Nana Patil RoyalM/S. J. R. Y. EnterprisesPardi No 3/1, 3/230-09-2022 00:00:00
Elite 2 ShopsPalava Dwellers Private Limited97 Pt 150/4 Pt31-07-2020 00:00:00
Elite 1 ShopPalava Dwellers Private Limited96/2 Pt, 97 Pt31-07-2020 00:00:00
Cyber Square - 1Greenscape It Park LlpD-102,D-103 &D-10431-03-2027 00:00:00
Delta LuxuriaShreenathji Organisers Pvt LtdPlot No 6130-04-2027 00:00:00
Giriraj SparshDura Vida Associates77 Tika No 18 Naupada30-06-2025 00:00:00
Regalia ShopsPalava Dwellers Private Limited96/2 Pt, 100/2 Pt31-07-2020 00:00:00
Urbano 2 ShopsPalava Dwellers Private Limited52 Pt ,And 144/9 Pt31-07-2020 00:00:00
New Shiv-Shakti ChsShree Laxmi DevelopersPlot 83 S No 7030-03-2023 00:00:00
Gami Industrial Park - C BuildingGolden Falcon Pacific LtdPlot No C-39A31-12-2024 00:00:00
Shreeji CloudShreeji Lifespaces InfrastructurePlot No 78, Sector 21 At Ulwe30-06-2026 00:00:00
Priyal AumShree Mauli Chs LtdPlot No 47 Sector 2601-06-2024 00:00:00
Chandrakant ResidencyAmogh ConstructionC.T.S No- 2 To 8 & C.T.S No- 169 To 178, C.T.S No- 295 To 30031-12-2027 00:00:00
Daisy Gardens Building No.13Ankita BuildersSurvey No 9, Hissa No 2A30-06-2026 00:00:00
Madhusudan Retreat TerracesMadhusudan Leisure HomesSurvey No 5031-12-2026 00:00:00
Rajoba SolitaireM/S. Gangadhar Associates58B/1A, Sector Ii, Tikka No. 2 Village Thane30-06-2026 00:00:00
Shree Gajanan Enterprises Rukhmini ChsShree Gajanan Enterprises Rukhmini ChsPlot No. 331-07-2026 00:00:00
Dosti West County - Phase 5 - Dosti Olive - Wing ADosti EnterprisesSurvey No 16/10/A/1(Pt), 16/9/A(Pt), 16/8/A(Pt)30-09-2028 00:00:00
Ganesh Villa ChslBhavani EnterprisesSurvey No 7A/4/A/330-06-2026 00:00:00
TiaraSagar EnterpriseS No 20 And Chalta No 2430-03-2024 00:00:00
Metro Aangan Phase - IMetro CreatorsS No 78 H No 7 P And 8 P30-12-2028 00:00:00
Prakruti SparshAvishkar BuildconS No 49, H No 10D30-12-2022 00:00:00
Panvelkar EmpireOm Sai Shraddha DevelopersSurvey No. 30/4 (P)30-06-2026 00:00:00
Om Sai One ParkInfini DevelopersCts 133/3 133/4 134/3 134/5 134/9 134/10 134/11 134/4/A 138/13/A 138/13/B 138/13/C31-12-2028 00:00:00
Ritz Phase - IiVikas Harakchand JainSurvey No. 39/5 Part, 6/1 Part And 6/2 Part.30-06-2024 00:00:00
Ganpati HeightsManoj Prabhakar PatilS. No 2 H No 23B30-05-2024 00:00:00
Omkar Darshan Co Op Hsg SocVinod Madhukar BhoirS No 26 H No 2A Plot No 430-06-2024 00:00:00
Sheth SupremeSheth Builders Private LimitedOld Survey No 159 Pt And New Survey No 20 Pt30-12-2024 00:00:00
One AksharAkshar RealtorsPlot No 730-12-2026 00:00:00
Vedant KalashShivalik DevelopersSurvey No 48 Hissa No 2 Plot No 5 And 630-03-2022 00:00:00
Mount View R4 To R7Himanshu Builders & DevelopersS No 67/3A 68/9B31-12-2023 00:00:00
Balaji VivantaMayur Enterprises Builders & DevelopersPlot No 3 ,Hissa No 1 ,2,3 ,4 Old Survey No 71 Hissa No 1,231-12-2023 00:00:00
Belvedere-B And CMacrotech Developers Limited212/7A Part 212/7B Part 212/7C Part 212/7D Part 212/7E Part 25/2A(Part) 25/2B(Part) 25/4(Part)30-11-2027 00:00:00
Sai Dream OneGls InfrastructuresS No.88, H No 6 & 731-12-2025 00:00:00
Neelkanth Palm AvenueNeelkanth InfratechPlot No-23 & 24, Sector-09 Ghansoli29-12-2029 00:00:00
Shreyas SapphireVinod Premjibhai TrapasiaPlot No- 1D-2 Sector-3A Karanjade Panvel Navi Mumbai31-03-2025 00:00:00
Upper Thane-Mlcp C ShopsMacrotech Developers Limited60/2 Part,60/1 Part31-12-2024 00:00:00
Innovative Infocom And It ParksInnovative Infocom & It Parks Private LimitedPlot No. Gen 71/1 And Gen 71/1/126-11-2027 00:00:00
Prem Ratna PlazaAditi Home MakerSurvey No 84 Hissa No 331-12-2027 00:00:00
Shreeram ResidencyRaghunath Kedari Phadtare690/330-12-2025 00:00:00
Jagjeet EnclaveJagjeet Shrusti Realtors29/1/C04-05-2024 00:00:00
Zunera Heights786 Micron Builders & Developers101/ 2 3 4 5 1230-12-2022 00:00:00
Krishna GalaxyKrishna Builders & DevelopersSurvey No 42 Hissa No 230-06-2023 00:00:00
Villa SmaranOm Villa Buildtech LlpCts No 1194E And Cts No 1194A Sector 2930-03-2024 00:00:00
Virat MansionNeelyog DevelopersCts No 9907,9908 To 991330-12-2022 00:00:00
Arnav Wing DPrashant Raghunath PatilGut No 55 Hissa No 131-12-2027 00:00:00
Smit VistaSmit Megastructures(Old) Survey No. 242/17, 18,, ( New) Survey No. 33/17, 1831-12-2029 00:00:00
Ram Smruti Chs LtdSai Prakash Builders And DevelopersPlot No 139 Cts No 392531-12-2026 00:00:00
Kamdhenu CrownKamdhenu GreenPlot No-6+7, Sector-19, Sanpada31-12-2029 00:00:00
Sai Geeta Apt.K K EnterprisesSurvey No 29, H N 5A, Plot No 7231-12-2023 00:00:00
Laxminarayan ParkJalaram InfraSurvey No 63 Hissa No331-12-2023 00:00:00
Mangaljyot Co Op Hsg Soc LtdShridhar Dattatray Patil8/B/1/2 And 9/B/1/331-12-2026 00:00:00
Neelkanth Palm PresidentNeelkanth InfratechPlot No 10 Sectot 11 Ghansoli31-12-2029 00:00:00
Garden Estate Phase -IiShree Balaji DevelopersSurvey No. 46, Hissa No. 12/131-03-2025 00:00:00
Parvati NiwasAadarsh DevelopersCst No 27/1B, 27/1C Tikka No 2231-12-2025 00:00:00
Dream AvenueDream Maruti RealtorsS No 15, H No 4 - S No 16, H No 331-12-2025 00:00:00
Kisan HeightsPravin Kisan BhoirS No 86/1/130-09-2027 00:00:00
Regency Sarvam Phase 12Regency Nirman LtdS No.42/1, 42/2, 42/3, 42/4A/1, 42/4A/2, 42/5, 42/6, 47/1, 50/1A, 50/2, 220/1, 201/1, 223/130-11-2024 00:00:00
Belvedere IMacrotech Developers Limited25/2A Part 25/2B Part31-07-2028 00:00:00
Jay Meghdoot ChslS R DevelopersS.No.46/H.No.6/A/13,Plot No.2731-12-2025 00:00:00
Foresta EMacrotech Developers Limited53/1(Part), 53/2(Part), 53/3(Part)31-08-2028 00:00:00
Paras Apartment Co-Op. Housing Society LtdShiv Infra1314, Village Kohoj-Khuntvali02-06-2027 00:00:00
Shubham ResidencyShubham RealtyPlot No 79,Sector 2130-06-2025 00:00:00
Shree Mahalaxmi ResidencyShree Gajanan Builders And DevelopersS No 93 / H No A, S No 9431-07-2028 00:00:00
Thane ProjectMacrotech Developers Limited144/1 Part31-07-2029 00:00:00
Thanekar CivicShree Swami Samarth EnterprisesS No 133, H No 209-04-2024 00:00:00
Saurabh ResidencyM/S Krishna Builders & DevelopersS No 77 , H No 2/1730-06-2024 00:00:00
Ved ParadiseKulkarni And Associates896631-12-2024 00:00:00
Unique Estate - IiUnique Shanti RealtorsOld S.No. 400 New S.No. 58 Hissa No. 2 And 330-06-2028 00:00:00
Musica ApartmentE I ConstructionCts No. 36 B/1, Tikka No.8 Sector 2 Congested31-12-2026 00:00:00
Royal VillasAdarsh EnterprisesCts No 3535, Plot No 7, Final Plot No 7 Mauje Bhiwandi31-12-2025 00:00:00
Sky ViewShreeji IconSurvey No 115, Hiisa No 6(P)30-11-2028 00:00:00
Omkar AvenueOmkar RealtorsCts No. 761 (Old Survey No.87/11 Plot No.11)31-03-2028 00:00:00
Century TwoCity InfraPlot No 22,Sector-0931-03-2028 00:00:00
Pokhriyal ParamountPokhriyal And AssociatesSurvey No. 127, Plot No. D31-12-2028 00:00:00
Vedant Palacia Phase Iv Wing B-BrutusTharwani PropertiesSr.No.16,Hissa No.431-12-2026 00:00:00
Delta StellarNoble Organics Pvt. Ltd.Plot No D-43/3 And D-43/431-12-2028 00:00:00
Mauli SadanMauli ConstructionCts 9039 To 904304-02-2024 00:00:00
Mukund VishnuShree Swami Samartha AssociatesTika No 12 Cst No 103A 2A 103A 2B Village Pachpakhadi30-12-2021 00:00:00
Anjani SparshGeeta Space Realtors249-2, 249-730-12-2020 00:00:00
Reliable ResidencyReliable InfraventuresPLOT NO 72 SC S NO 12, 130-04-2024 00:00:00
Aadi AarambhNirman Construction129/1 A And 129/1B28-02-2018 00:00:00
Shree Shambhav DarshanSwastik Enterprises2071 To 2075 Of Village Ghatkopar - Kirol30-12-2021 00:00:00
Mohan Nano Estates IiiMohan Lifespaces Llp24/1,24/2P,24/6P,24/8,24/9,25/1,25/231-12-2019 00:00:00
Building No. 2 Wings A And B AlpineSd Corporation Private Limited840 A/130-12-2020 00:00:00
Project Details
  • Project:
    Sai Savali Building A1
  • Location:
  • 62 Part 2
  • Const. Stage:
    New
  • Possession:
    15 Dec 2023
Developer Details

  • Developer:
    Mayfair Enterprises
  • Phone:
  • Address:
  • Kamal Pushpa
Project RERA Details
MAHA REARA No: P99000026399
Project Type Others
RERA Project Status New
Architect Odyssey Architects And Associates
Funding Bank BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession 15 Dec 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 05 Feb 2024
Last Retrived 28 Jul 2025
Sai Savali Building A1 QR Code
Sai Savali Building A1
MahaRERA - P99000026399
Apartment Details & Configuration
TypeArea
1 BHK40.07 Sq.mts. ( 431 Sq.ft. )
1 BHK40.49 Sq.mts. ( 436 Sq.ft. )
1 BHK41.45 Sq.mts. ( 446 Sq.ft. )
1RK25.11 Sq.mts. ( 270 Sq.ft. )
1RK25.9 Sq.mts. ( 279 Sq.ft. )
1RK28.17 Sq.mts. ( 303 Sq.ft. )
2 BHK59.08 Sq.mts. ( 636 Sq.ft. )
2 BHK59.2 Sq.mts. ( 637 Sq.ft. )
Shop9.11 Sq.mts. ( 98 Sq.ft. )
Shop11.99 Sq.mts. ( 129 Sq.ft. )
Shop12.88 Sq.mts. ( 139 Sq.ft. )
Shop20.11 Sq.mts. ( 216 Sq.ft. )
Shop23.81 Sq.mts. ( 256 Sq.ft. )
Shop24.29 Sq.mts. ( 261 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sai Savali Building A1last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space10% completed
10% Complete
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Work Completed
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting100% completed
95% Complete
Work Completed
Open Parking100% completed
95% Complete
Work Completed
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Work Completed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Work Completed
Street Lighting100% completed
95% Complete
Work Completed
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Na
Water Supply100% completed
95% Complete
Work Completed
Buildings / Wings in Sai Savali Building A1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sai Savali Building A1 by Mayfair Enterpriseslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

43056 Sq. ft.

Project Area

4318 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

39 apartments in total
Total
39
Booked
27
Available
12

Saleable Area Statistics (Sq. ft.)

17530 Total
Total
17530
Booked
13759
Available
3771
Total 39 apartments in project. 27 apartments booked. 69% apartments booked.
Total 17530 Sq.ft. saleable area. 13759 saleable area booked.
78% area booked.

Sai Savali Building A1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sai Savali Building A1Jun 20235101048
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.07 Sq.mts. ( 431 Sq.ft. )5
3 Booked60% Booked
60% Booked
1 BHK40.49 Sq.mts. ( 436 Sq.ft. )5
4 Booked80% Booked
80% Booked
1 BHK41.45 Sq.mts. ( 446 Sq.ft. )5
5 Booked100% Booked
100% Booked
1RK25.11 Sq.mts. ( 270 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK25.9 Sq.mts. ( 279 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK28.17 Sq.mts. ( 303 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK59.08 Sq.mts. ( 636 Sq.ft. )6
6 Booked100% Booked
100% Booked
2 BHK59.2 Sq.mts. ( 637 Sq.ft. )8
6 Booked75% Booked
75% Booked
Shop9.11 Sq.mts. ( 98 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop11.99 Sq.mts. ( 129 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.88 Sq.mts. ( 139 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.11 Sq.mts. ( 216 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop23.81 Sq.mts. ( 256 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop24.29 Sq.mts. ( 261 Sq.ft. )1
None Booked0% Booked
0% Booked
39 total apartments / 27 apartments booked. 69% apartments booked.
Work Description in Building Sai Savali Building A1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Mayfair Enterprises
for Project
Sai Savali Building A1
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation