Project overview

Sai Sansar is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800014906. Sai Sansar is located at 1274/1, Cts 1274, Plot No 427. This is a New being developed by Concrete Builders.

Sai Sansar has 3 BHK Apartments with carpet areas ranging from 1225 to 1248 Sq.ft. Carpet. The Project has total 24 of which 20 are currently available for sale.

Sai Sansar is being developed on a total land area of 10680 Sq.ft. Sai Sansar has 1 Wings / Towers Sai Sansar

ProjectDeveloperLocationPossession
Godrej PrimeGodrej Redevelopers (Mumbai) Pvt. Ltd.Cts Nos.53/Pt And 52/Pt30-05-2023 00:00:00
Satra HarmonyRrb Realtors Pvt Ltd.831 -Pt31-12-2019 00:00:00
Runwal Forest Tower 1-4Wheelabrator Alloy Castings LimitedPt.596-598, 602/1-9, 606/1-83, 605/1-17, 607A607d596/1-6, 601-606, 599A/1-81, 607/1-3130-04-2022 00:00:00
Project Details
  • Project:
    Sai Sansar
  • Location:
  • 1274/1, Cts 1274, Plot No 427
  • Const. Stage:
    New
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Concrete Builders
  • Phone:
  • Address:
  • Arenja Corner
Project RERA Details
MAHA REARA No: P51800014906
Project Type Residential / Group Housing
RERA Project Status New
Architect Vinayak Consultants
Funding Bank THE COSMOS CO OPERATIVE BANK LIMITED
Proposed Possession 30 Dec 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 11 Jan 2018
Last Retrived 26 Jul 2025
Sai Sansar QR Code
Sai Sansar
MahaRERA - P51800014906
Apartment Details & Configuration
TypeArea
3 BHK113.76 Sq.mts. ( 1225 Sq.ft. )
3 BHK115.9 Sq.mts. ( 1248 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sai Sansarlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
-
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
-
Landscaping & Tree Planting100% completed
95% Complete
-
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
-
Solid Waste Management And Disposal100% completed
95% Complete
-
Storm Water Drains100% completed
95% Complete
-
Street Lighting100% completed
95% Complete
-
SWIMMING POOL100% completed
95% Complete
-
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
-
Water Supply100% completed
95% Complete
-
Buildings / Wings in Sai Sansar
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sai Sansar by Concrete Builderslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

10680 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

24 apartments in total
Total
24
Booked
4
Available
20

Saleable Area Statistics (Sq. ft.)

29665 Total
Total
29665
Booked
4921
Available
24744
Total 24 apartments in project. 4 apartments booked. 16% apartments booked.
Total 29665 Sq.ft. saleable area. 4921 saleable area booked.
17% area booked.

Sai Sansar

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sai SansarDec 2022131011060
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK113.76 Sq.mts. ( 1225 Sq.ft. )12
3 Booked25% Booked
25% Booked
3 BHK115.9 Sq.mts. ( 1248 Sq.ft. )12
24 total apartments / 4 apartments booked. 16% apartments booked.
Work Description in Building Sai SansarCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Concrete Builders
for Project
Sai Sansar
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation