Project overview

Sai Proviso - Aashlesha is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700002842. Sai Proviso - Aashlesha is located at Plot N O 13 . This is a Ongoing being developed by Sai Proviso Developers.

Sai Proviso - Aashlesha has Office & Shops Apartments with carpet areas ranging from 272 to 786 Sq.ft. Carpet. The Project has total 100 of which 0 are currently available for sale.

Sai Proviso - Aashlesha is being developed on a total land area of 43880 Sq.ft. out of which 11418 Sq.ft. i.e 26% is reserved for recreational purposes. Sai Proviso - Aashlesha has 3 Wings / Towers Wing A,Wing B,Wing C

ProjectDeveloperLocationPossession
Green Valley Phase IGreen Developers63 Part, 64/2 Part, 66/2 Part01-04-2025 00:00:00
MannatWelkin DevelopersGhansoli10-04-2025 00:00:00
Satyam HarmonyArham Developers2910-10-2023 00:00:00
Satyam StellaSatyam Superstructures Private LimitedPlot No- 17, Sector- 3, Koparkhairane31-12-2027 00:00:00
Ev 23 Malibu WestEv Homes Constructions Pvt LtdPlot No.-6, Sector No.-23, Koparkhairane31-12-2029 00:00:00
Satyam SiciliaSunny Home MakersPlot No. 40, Sector No. 2031-12-2028 00:00:00
Gami TelonLal Gebi Infra Private LimitedPlot No 26, Sector 3, Village Ghansoli31-12-2029 00:00:00
Project Details
  • Project:
    Sai Proviso - Aashlesha
  • Location:
  • Plot N O 13
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Sai Proviso Developers
  • Phone:
  • Address:
  • Bhumiraj Costarica
Project RERA Details
MAHA REARA No: P51700002842
Project Type Others
RERA Project Status Ongoing
Architect Rajesh Rc
Funding Bank AXIS BANK
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession
Litigations No Litigations
Last Modified 04 Aug 2017
Last Retrived 26 Jul 2025
Sai Proviso - Aashlesha QR Code
Sai Proviso - Aashlesha
MahaRERA - P51700002842
Apartment Details & Configuration
TypeArea
2 BHK53.54 Sq.mts. ( 576 Sq.ft. )
2 BHK50.34 Sq.mts. ( 542 Sq.ft. )
2 BHKT49.68 Sq.mts. ( 535 Sq.ft. )
3 BHK61.03 Sq.mts. ( 657 Sq.ft. )
3 BHK61.23 Sq.mts. ( 659 Sq.ft. )
3 BHK62.24 Sq.mts. ( 670 Sq.ft. )
3 BHK62.33 Sq.mts. ( 671 Sq.ft. )
3 BHK63.18 Sq.mts. ( 680 Sq.ft. )
3 BHK64.5 Sq.mts. ( 694 Sq.ft. )
3 BHK65.74 Sq.mts. ( 708 Sq.ft. )
2 BHK53.41 Sq.mts. ( 575 Sq.ft. )
2 BHK54.04 Sq.mts. ( 582 Sq.ft. )
2 BHKT53.3 Sq.mts. ( 574 Sq.ft. )
2 BHKT54.16 Sq.mts. ( 583 Sq.ft. )
2 BHKT49.8 Sq.mts. ( 536 Sq.ft. )
2 BHKT50.23 Sq.mts. ( 541 Sq.ft. )
3 BHK59.93 Sq.mts. ( 645 Sq.ft. )
3 BHK63.26 Sq.mts. ( 681 Sq.ft. )
3 BHK63.49 Sq.mts. ( 683 Sq.ft. )
3 BHK66.94 Sq.mts. ( 721 Sq.ft. )
Office25.27 Sq.mts. ( 272 Sq.ft. )
Office25.6 Sq.mts. ( 276 Sq.ft. )
Office35.91 Sq.mts. ( 387 Sq.ft. )
Office63.46 Sq.mts. ( 683 Sq.ft. )
Office63.86 Sq.mts. ( 687 Sq.ft. )
Office65.99 Sq.mts. ( 710 Sq.ft. )
Shops68.41 Sq.mts. ( 736 Sq.ft. )
Shops68.96 Sq.mts. ( 742 Sq.ft. )
Shops68.99 Sq.mts. ( 743 Sq.ft. )
Shops69 Sq.mts. ( 743 Sq.ft. )
Shops69.08 Sq.mts. ( 744 Sq.ft. )
Shops73.05 Sq.mts. ( 786 Sq.ft. )
Shops35.6 Sq.mts. ( 383 Sq.ft. )
Shops35.77 Sq.mts. ( 385 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sai Proviso - Aashleshalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Na
Community Buildings100% completed
95% Complete
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Na
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Na
Landscaping & Tree Planting100% completed
95% Complete
Na
Open Parking100% completed
95% Complete
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Na
Water Supply100% completed
95% Complete
Na
Buildings / Wings in Sai Proviso - Aashlesha
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sai Proviso - Aashlesha by Sai Proviso Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

43880 Sq. ft.

Project Area

11418 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

100 apartments in total
Total
100
Booked
100
Available
0

Saleable Area Statistics (Sq. ft.)

59270 Total
Total
59270
Booked
59270
Available
0
Total 100 apartments in project. 100 apartments booked. 100% apartments booked.
Total 59270 Sq.ft. saleable area. 59270 saleable area booked.
100% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing ADec 2019222012369
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK53.54 Sq.mts. ( 576 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK50.34 Sq.mts. ( 542 Sq.ft. )10
10 Booked100% Booked
100% Booked
2 BHKT50.34 Sq.mts. ( 542 Sq.ft. )10
10 Booked100% Booked
100% Booked
2 BHKT49.68 Sq.mts. ( 535 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHKT53.54 Sq.mts. ( 576 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK61.03 Sq.mts. ( 657 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK61.23 Sq.mts. ( 659 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK62.24 Sq.mts. ( 670 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK62.33 Sq.mts. ( 671 Sq.ft. )8
8 Booked100% Booked
100% Booked
3 BHK63.18 Sq.mts. ( 680 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK64.5 Sq.mts. ( 694 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK65.74 Sq.mts. ( 708 Sq.ft. )1
1 Booked100% Booked
100% Booked
42 total apartments / 42 apartments booked. 100% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BDec 2019222012368
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK53.41 Sq.mts. ( 575 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK54.04 Sq.mts. ( 582 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK50.34 Sq.mts. ( 542 Sq.ft. )10
10 Booked100% Booked
100% Booked
2 BHKT50.34 Sq.mts. ( 542 Sq.ft. )10
10 Booked100% Booked
100% Booked
2 BHKT53.3 Sq.mts. ( 574 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHKT54.16 Sq.mts. ( 583 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHKT49.8 Sq.mts. ( 536 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHKT50.23 Sq.mts. ( 541 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK59.93 Sq.mts. ( 645 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK61.03 Sq.mts. ( 657 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK62.33 Sq.mts. ( 671 Sq.ft. )8
8 Booked100% Booked
100% Booked
3 BHK63.18 Sq.mts. ( 680 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK63.26 Sq.mts. ( 681 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK63.49 Sq.mts. ( 683 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK66.94 Sq.mts. ( 721 Sq.ft. )1
1 Booked100% Booked
100% Booked
42 total apartments / 42 apartments booked. 100% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CDec 20192101029
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Office25.27 Sq.mts. ( 272 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office25.6 Sq.mts. ( 276 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office35.91 Sq.mts. ( 387 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office63.46 Sq.mts. ( 683 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office63.86 Sq.mts. ( 687 Sq.ft. )3
3 Booked100% Booked
100% Booked
Office65.99 Sq.mts. ( 710 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shops68.41 Sq.mts. ( 736 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shops68.96 Sq.mts. ( 742 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shops68.99 Sq.mts. ( 743 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shops69 Sq.mts. ( 743 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shops69.08 Sq.mts. ( 744 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shops73.05 Sq.mts. ( 786 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shops35.6 Sq.mts. ( 383 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shops35.77 Sq.mts. ( 385 Sq.ft. )1
1 Booked100% Booked
100% Booked
16 total apartments / 16 apartments booked. 100% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Sai Proviso Developers
for Project
Sai Proviso - Aashlesha
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation