Project overview

Sai Kanhujipolice Sankul is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700016588. Sai Kanhujipolice Sankul is located at Survey No 56 Hiss No 36, Survey No 56 Hissa No 37A, Survey No 56 Hissa 37B. This is a New being developed by Harshad Balu Gawade.

Sai Kanhujipolice Sankul has 2 BHK Apartments with carpet areas ranging from 510 to 545 Sq.ft. Carpet. The Project has total 236 of which 124 are currently available for sale.

Sai Kanhujipolice Sankul is being developed on a total land area of 99029 Sq.ft. out of which 11943 Sq.ft. i.e 12% is reserved for recreational purposes. Sai Kanhujipolice Sankul has 5 Wings / Towers Building A,Building B,Building C,Building D,Building E

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Sai Kanhujipolice Sankul
  • Location:
  • Survey No 56 Hiss No 36, Survey No 56 Hissa No 37A, Survey No 56 Hissa 37B
  • Const. Stage:
    New
  • Possession:
    30 May 2024
Developer Details

  • Developer:
    Harshad Balu Gawade
  • Phone:
  • Address:
  • Sai Vitthal Tawer
Project RERA Details
MAHA REARA No: P51700016588
Project Type Residential / Group Housing
RERA Project Status New
Architect Shobhana Jayant Deshpande Of Creations
Funding Bank IDBI BANK
Proposed Possession 30 May 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 21 Jun 2024
Last Retrived 26 Jul 2025
Sai Kanhujipolice Sankul QR Code
Sai Kanhujipolice Sankul
MahaRERA - P51700016588
Apartment Details & Configuration
TypeArea
1 BHK33.61 Sq.mts. ( 362 Sq.ft. )
1 BHK33.63 Sq.mts. ( 362 Sq.ft. )
2 BHK47.42 Sq.mts. ( 510 Sq.ft. )
2 BHK47.44 Sq.mts. ( 511 Sq.ft. )
2 BHK50.49 Sq.mts. ( 543 Sq.ft. )
2 BHK50.61 Sq.mts. ( 545 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sai Kanhujipolice Sankullast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
0
CLUB HOUSE10% completed
10% Complete
Shared Across Multiple Phases Real Estate Project
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
--
Energy management
Solar Water Heater
Fire Protection And Fire Safety Requirements
--
Landscaping & Tree Planting
--
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
No Stp
Solid Waste Management And Disposal
Na
Storm Water Drains
--
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
--
Water Supply
--
Buildings / Wings in Sai Kanhujipolice Sankul
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sai Kanhujipolice Sankul by Harshad Balu Gawadelast updated on 26 Jul 2025 as per information obtained from MARA RERA.

99029 Sq. ft.

Project Area

11943 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

236 apartments in total
Total
236
Booked
112
Available
124

Saleable Area Statistics (Sq. ft.)

97979 Total
Total
97979
Booked
46383
Available
51596
Total 236 apartments in project. 112 apartments booked. 47% apartments booked.
Total 97979 Sq.ft. saleable area. 46383 saleable area booked.
47% area booked.

Building A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building AMay 20231110130013
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.61 Sq.mts. ( 362 Sq.ft. )25
15 Booked60% Booked
60% Booked
1 BHK33.63 Sq.mts. ( 362 Sq.ft. )25
12 Booked48% Booked
48% Booked
50 total apartments / 27 apartments booked. 54% apartments booked.
Work Description in Building Building ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress40% done
40% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress40% done
40% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress78% done
78% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress80% done
80% Booked
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
work-in-progress80% done
80% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress95% done
95% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building BMay 20231110140014
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.61 Sq.mts. ( 362 Sq.ft. )25
11 Booked44% Booked
44% Booked
1 BHK33.63 Sq.mts. ( 362 Sq.ft. )25
14 Booked56% Booked
56% Booked
50 total apartments / 25 apartments booked. 50% apartments booked.
Work Description in Building Building BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress40% done
40% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress40% done
40% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress78% done
78% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress80% done
80% Booked
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
work-in-progress80% done
80% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress95% done
95% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building CMay 20231110180018
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.61 Sq.mts. ( 362 Sq.ft. )30
12 Booked40% Booked
40% Booked
1 BHK33.63 Sq.mts. ( 362 Sq.ft. )30
12 Booked40% Booked
40% Booked
60 total apartments / 24 apartments booked. 40% apartments booked.
Work Description in Building Building CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress40% done
40% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress40% done
40% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress78% done
78% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress80% done
80% Booked
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
work-in-progress80% done
80% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress95% done
95% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building DMay 2023510150015
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK47.42 Sq.mts. ( 510 Sq.ft. )4
2 Booked50% Booked
50% Booked
2 BHK47.44 Sq.mts. ( 511 Sq.ft. )4
1 Booked25% Booked
25% Booked
2 BHK50.49 Sq.mts. ( 543 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK50.61 Sq.mts. ( 545 Sq.ft. )4
4 Booked100% Booked
100% Booked
16 total apartments / 7 apartments booked. 43% apartments booked.
Work Description in Building Building DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress40% done
40% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress40% done
40% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress78% done
78% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress80% done
80% Booked
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
work-in-progress80% done
80% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress95% done
95% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building EMay 20231110240024
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK47.42 Sq.mts. ( 510 Sq.ft. )15
9 Booked60% Booked
60% Booked
2 BHK47.44 Sq.mts. ( 511 Sq.ft. )15
9 Booked60% Booked
60% Booked
2 BHK50.49 Sq.mts. ( 543 Sq.ft. )15
10 Booked66% Booked
66% Booked
2 BHK50.61 Sq.mts. ( 545 Sq.ft. )15
60 total apartments / 29 apartments booked. 48% apartments booked.
Work Description in Building Building ECompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress40% done
40% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress40% done
40% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress78% done
78% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress80% done
80% Booked
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
work-in-progress80% done
80% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress95% done
95% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Harshad Balu Gawade
for Project
Sai Kanhujipolice Sankul
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation