Project overview
Sai Ishwar is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700012240. Sai Ishwar is located at 101/5. This is a Ongoing being developed by Mohan Kedarnath Krishnavanshi.
Sai Ishwar has 1 BHK FLAT Apartments with carpet areas ranging from 338 to 362 Sq.ft. Carpet. The Project has total 169 of which 37 are currently available for sale.
Sai Ishwar is being developed on a total land area of 69966 Sq.ft. out of which 6997 Sq.ft. i.e 10% is reserved for recreational purposes. Sai Ishwar has 7 Wings / Towers A Wing,B Wing,C Wing,D Wing,E Wing,F Wing,G Wing
| Project | Developer | Location | Possession |
-
Project:
Sai Ishwar
-
Location:
-
101/5
-
Const. Stage:
Ongoing
-
Possession:
30 Dec 2020
| MAHA REARA No: |
P51700012240 |
| Project Type |
Residential / Group Housing |
| RERA Project Status |
Ongoing |
| Architect |
Gurunathan Jayavel Mudaliyar |
| Funding Bank |
CENTRAL BANK OF INDIA |
| Proposed Possession |
30 Dec 2020 |
| Revised Possession |
30 Dec 2020 |
| Extended Possession |
30 Jun 2023 |
| Litigations |
No Litigations |
| Last Modified |
25 Aug 2022 |
| Last Retrived |
26 Jul 2025 |
Sai Ishwar QR Code
Sai Ishwar
MahaRERA - P51700012240
| Type | Area |
| 1 BHK | 35 Sq.mts. ( 377 Sq.ft. ) |
| 1 BHK FLAT | 36.46 Sq.mts. ( 392 Sq.ft. ) |
| 1 BHK FLAT | 38.67 Sq.mts. ( 416 Sq.ft. ) |
| 1 BHK FLAT | 31.93 Sq.mts. ( 344 Sq.ft. ) |
| 2 BHK FLAT | 46.54 Sq.mts. ( 501 Sq.ft. ) |
| 1 BHK FLAT | 35.55 Sq.mts. ( 383 Sq.ft. ) |
| 1 BHK FLAT | 38.88 Sq.mts. ( 419 Sq.ft. ) |
| 1 BHK FLAT | 32.12 Sq.mts. ( 346 Sq.ft. ) |
| 1 BHK FLAT | 34 Sq.mts. ( 366 Sq.ft. ) |
| 1 BHK FLAT | 36.92 Sq.mts. ( 397 Sq.ft. ) |
| 1 BHK FLAT | 37.19 Sq.mts. ( 400 Sq.ft. ) |
| 2 BHK FLAT | 51.79 Sq.mts. ( 557 Sq.ft. ) |
| 1 BHK | 36.14 Sq.mts. ( 389 Sq.ft. ) |
| 1 BHK FLAT | 36.91 Sq.mts. ( 397 Sq.ft. ) |
| 1 BHK FLAT | 32.46 Sq.mts. ( 349 Sq.ft. ) |
| 1 BHK FLAT | 31.38 Sq.mts. ( 338 Sq.ft. ) |
| 1 BHK FLAT | 32.07 Sq.mts. ( 345 Sq.ft. ) |
| 1 BHK FLAT | 32.65 Sq.mts. ( 351 Sq.ft. ) |
| 1 BHK FLAT | 33.61 Sq.mts. ( 362 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Sai Ishwarlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space90% completed
|
|
Work In Progress |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station100% completed
|
|
Work Completed |
|
|
|
Na |
Fire Protection And Fire Safety
Requirements
|
|
Na |
Landscaping & Tree Planting90% completed
|
|
Work In Progress |
|
|
|
Na |
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
|
|
Work Completed |
Solid Waste Management And Disposal
|
|
Na |
|
|
|
Na |
Street Lighting90% completed
|
|
Work In Progress |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting100% completed
|
|
Work Completed |
Water Supply95% completed
|
|
Work In Progress |
Buildings / Wings in Sai Ishwar
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sai Ishwar by Mohan Kedarnath Krishnavanshilast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
169
apartments in total
Saleable Area Statistics (Sq. ft.)
66495
Total
Total 169 apartments in project. 132 apartments booked. 78% apartments booked.
Total 66495 Sq.ft. saleable area. 51246 saleable area booked.
77% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| A Wing | Jun 2020 | 5 | 1 | 0 | 0 | 0 | 2 | 5 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 35 Sq.mts. ( 377 Sq.ft. ) | 10 | |
| 1 BHK FLAT | 36.46 Sq.mts. ( 392 Sq.ft. ) | 5 | |
| 1 BHK FLAT | 38.67 Sq.mts. ( 416 Sq.ft. ) | 4 | |
| 1 BHK FLAT | 31.93 Sq.mts. ( 344 Sq.ft. ) | 5 | |
| 2 BHK FLAT | 46.54 Sq.mts. ( 501 Sq.ft. ) | 5 | |
29 total apartments / 22 apartments booked. 75% apartments booked. |
| Work Description in Building A Wing | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| B Wing | Dec 2018 | 5 | 1 | 0 | 0 | 0 | 2 | 3 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK FLAT | 35.55 Sq.mts. ( 383 Sq.ft. ) | 2 | |
| 1 BHK FLAT | 38.88 Sq.mts. ( 419 Sq.ft. ) | 16 | |
18 total apartments / 11 apartments booked. 61% apartments booked. |
| Work Description in Building B Wing | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| C Wing | Dec 2018 | 5 | 1 | 0 | 0 | 0 | 2 | 3 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK FLAT | 35.55 Sq.mts. ( 383 Sq.ft. ) | 2 | |
| 1 BHK FLAT | 38.88 Sq.mts. ( 419 Sq.ft. ) | 16 | |
18 total apartments / 11 apartments booked. 61% apartments booked. |
| Work Description in Building C Wing | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| D Wing | Dec 2018 | 5 | 1 | 0 | 0 | 0 | 2 | 3 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK FLAT | 31.93 Sq.mts. ( 344 Sq.ft. ) | 5 | |
| 1 BHK FLAT | 35 Sq.mts. ( 377 Sq.ft. ) | 10 | |
| 1 BHK FLAT | 36.46 Sq.mts. ( 392 Sq.ft. ) | 5 | |
| 1 BHK FLAT | 38.67 Sq.mts. ( 416 Sq.ft. ) | 4 | |
| 2 BHK | 46.54 Sq.mts. ( 501 Sq.ft. ) | 5 | |
29 total apartments / 24 apartments booked. 82% apartments booked. |
| Work Description in Building D Wing | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| E Wing | Jan 2020 | 5 | 1 | 0 | 0 | 0 | 2 | 3 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK FLAT | 32.12 Sq.mts. ( 346 Sq.ft. ) | 5 | |
| 1 BHK FLAT | 34 Sq.mts. ( 366 Sq.ft. ) | 15 | |
| 1 BHK FLAT | 36.92 Sq.mts. ( 397 Sq.ft. ) | 9 | |
| 1 BHK FLAT | 37.19 Sq.mts. ( 400 Sq.ft. ) | 5 | |
| 2 BHK FLAT | 51.79 Sq.mts. ( 557 Sq.ft. ) | 4 | |
38 total apartments / 29 apartments booked. 76% apartments booked. |
| Work Description in Building E Wing | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| F Wing | Dec 2018 | 5 | 1 | 0 | 0 | 0 | 2 | 3 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 36.14 Sq.mts. ( 389 Sq.ft. ) | 5 | |
| 1 BHK FLAT | 36.91 Sq.mts. ( 397 Sq.ft. ) | 4 | |
| 1 BHK FLAT | 32.46 Sq.mts. ( 349 Sq.ft. ) | 10 | |
19 total apartments / 18 apartments booked. 94% apartments booked. |
| Work Description in Building F Wing | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| G Wing | Dec 2018 | 5 | 1 | 0 | 0 | 0 | 3 | 4 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK FLAT | 31.38 Sq.mts. ( 338 Sq.ft. ) | 4 | |
| 1 BHK FLAT | 32.07 Sq.mts. ( 345 Sq.ft. ) | 5 | |
| 1 BHK FLAT | 32.65 Sq.mts. ( 351 Sq.ft. ) | 5 | |
| 1 BHK FLAT | 33.61 Sq.mts. ( 362 Sq.ft. ) | 4 | |
18 total apartments / 17 apartments booked. 94% apartments booked. |
| Work Description in Building G Wing | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
Channel Partners Registered by Developer
Mohan Kedarnath Krishnavanshi
for Project
Sai Ishwar
last updated on
26 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |