Project overview

Sai Enclave is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000004529. Sai Enclave is located at Survey No 317 Hissa No 9 Hissa No 11 Hissa No 13. This is a Ongoing being developed by M/S. Radheya Construction Company.

Sai Enclave has 0 Apartments with carpet areas ranging from 0 to 0 Sq.ft. Carpet. The Project has total 220 of which 13 are currently available for sale.

Sai Enclave is being developed on a total land area of 95369 Sq.ft. out of which 9240 Sq.ft. i.e 10% is reserved for recreational purposes. Sai Enclave has 3 Wings / Towers A Wing,B Wing,C Wing

ProjectDeveloperLocationPossession
Sunteck West World 1, Tivri, Naigaon EastSunteck Realty Limited45/2A, 45/3A, 45/3B, 45/4, 45/6, 46/4-8, 47/1A, 47/3A, 47/3B, 47/4A, 47/5, 47/830-09-2023 00:00:00
Sunteck West World 2, Tivri, Naigaon EastSunteck Realty Limited45/2A, 45/3A, 45/3B, 45/4, 45/6, 46/4-8, 47/1A, 47/3A, 47/3B, 47/4A, 47/5, 47/830-12-2023 00:00:00
Ritu DreamsRitu RealitySurvey No 88 Hissa No 4 And 831-12-2018 00:00:00
PavitradhamPavitra Gruh Sahay Llp23, 24/1, 24/231-03-2018 00:00:00
Sai EnclaveM/S. Radheya Construction CompanySurvey No 317 Hissa No 9 Hissa No 11 Hissa No 1330-12-2021 00:00:00
Project Details
  • Project:
    Sai Enclave
  • Location:
  • Survey No 317 Hissa No 9 Hissa No 11 Hissa No 13
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2021
Developer Details

  • Developer:
    M/S. Radheya Construction Company
  • Phone:
  • Address:
  • Goyal Shopping Arcade
Project RERA Details
MAHA REARA No: P99000004529
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Mr Abhay Raut
Funding Bank SARASWAT COOPERATIVE BANK LIMITED
Proposed Possession 30 Dec 2021
Revised Possession 30 Dec 2021
Extended Possession
Litigations No Litigations
Last Modified 09 Aug 2017
Last Retrived 28 Jul 2025
Sai Enclave QR Code
Sai Enclave
MahaRERA - P99000004529
Apartment Details & Configuration
TypeArea
1 BHK31.75 Sq.mts. ( 342 Sq.ft. )
1 BHK31.76 Sq.mts. ( 342 Sq.ft. )
1 BHK37.09 Sq.mts. ( 399 Sq.ft. )
2 BHK46.28 Sq.mts. ( 498 Sq.ft. )
2 BHK49.49 Sq.mts. ( 533 Sq.ft. )
2 BHK50.61 Sq.mts. ( 545 Sq.ft. )
SHOP13.11 Sq.mts. ( 141 Sq.ft. )
1 BHK31.45 Sq.mts. ( 339 Sq.ft. )
1 BHK31.6 Sq.mts. ( 340 Sq.ft. )
1 BHK34.51 Sq.mts. ( 371 Sq.ft. )
1 BHK35.45 Sq.mts. ( 382 Sq.ft. )
1RK30 Sq.mts. ( 323 Sq.ft. )
00 Sq.mts. ( 0 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sai Enclavelast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
As Per Sanction Plan
Community Buildings100% completed
95% Complete
Cfc
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Noc Given By Fire Dept.
Landscaping & Tree Planting100% completed
95% Complete
As Per Tree Noc Given By Vvcmc
Open Parking100% completed
95% Complete
As Per Sanction Plan
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Septic Tank
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting
Un-Competed
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
As Per Report Given By The Consultant
Water Supply100% completed
95% Complete
Facility Will Start Once Vvcmc Water Supply Comm
Buildings / Wings in Sai Enclave
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sai Enclave by M/S. Radheya Construction Companylast updated on 28 Jul 2025 as per information obtained from MARA RERA.

95369 Sq. ft.

Project Area

9240 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

220 apartments in total
Total
220
Booked
207
Available
13

Saleable Area Statistics (Sq. ft.)

81522 Total
Total
81522
Booked
76380
Available
5142
Total 220 apartments in project. 207 apartments booked. 94% apartments booked.
Total 81522 Sq.ft. saleable area. 76380 saleable area booked.
94% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingJan 19001510107610
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.75 Sq.mts. ( 342 Sq.ft. )26
25 Booked96% Booked
96% Booked
1 BHK31.76 Sq.mts. ( 342 Sq.ft. )28
26 Booked92% Booked
92% Booked
1 BHK37.09 Sq.mts. ( 399 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK46.28 Sq.mts. ( 498 Sq.ft. )14
12 Booked85% Booked
85% Booked
2 BHK49.49 Sq.mts. ( 533 Sq.ft. )14
12 Booked85% Booked
85% Booked
2 BHK50.61 Sq.mts. ( 545 Sq.ft. )14
13 Booked92% Booked
92% Booked
SHOP13.11 Sq.mts. ( 141 Sq.ft. )12
11 Booked91% Booked
91% Booked
109 total apartments / 100 apartments booked. 91% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingJan 190015101023010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.45 Sq.mts. ( 339 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK31.6 Sq.mts. ( 340 Sq.ft. )14
14 Booked100% Booked
100% Booked
1 BHK31.75 Sq.mts. ( 342 Sq.ft. )26
25 Booked96% Booked
96% Booked
1 BHK34.51 Sq.mts. ( 371 Sq.ft. )14
14 Booked100% Booked
100% Booked
1 BHK35.45 Sq.mts. ( 382 Sq.ft. )28
27 Booked96% Booked
96% Booked
1RK30 Sq.mts. ( 323 Sq.ft. )28
26 Booked92% Booked
92% Booked
111 total apartments / 107 apartments booked. 96% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingJan 19000000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
00 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building C WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
M/S. Radheya Construction Company
for Project
Sai Enclave
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation