Project overview

Sai Enclave Building No.2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000035122. Sai Enclave Building No.2 is located at S.No.317 H.No.3, 6C,8, 9. This is a New being developed by M/S. Radheya Construction Company.

Sai Enclave Building No.2 has 1 BHK SALE & 2 BHK SALE Apartments with carpet areas ranging from 425 to 618 Sq.ft. Carpet. The Project has total 379 of which 358 are currently available for sale.

Sai Enclave Building No.2 is being developed on a total land area of 146175 Sq.ft. out of which 9405 Sq.ft. i.e 6% is reserved for recreational purposes. Sai Enclave Building No.2 has 3 Wings / Towers A Wing,B Wing,C Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Sai Enclave Building No.2
  • Location:
  • S.No.317 H.No.3, 6C,8, 9
  • Const. Stage:
    New
  • Possession:
    31 Dec 2029
Developer Details

  • Developer:
    M/S. Radheya Construction Company
  • Phone:
  • Address:
  • Goyal Shopping Arcade
Project RERA Details
MAHA REARA No: P99000035122
Project Type Residential / Group Housing
RERA Project Status New
Architect Abhay Raut
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2029
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 10 May 2022
Last Retrived 28 Jul 2025
Sai Enclave Building No.2 QR Code
Sai Enclave Building No.2
MahaRERA - P99000035122
Apartment Details & Configuration
TypeArea
1 BHK SALE39.45 Sq.mts. ( 425 Sq.ft. )
1 BHK SALE39.46 Sq.mts. ( 425 Sq.ft. )
1 BHK SALE39.81 Sq.mts. ( 429 Sq.ft. )
1 BHK SALE40.04 Sq.mts. ( 431 Sq.ft. )
1 BHK SALE44.64 Sq.mts. ( 481 Sq.ft. )
2 BHK SALE57.04 Sq.mts. ( 614 Sq.ft. )
2 BHK SALE57.45 Sq.mts. ( 618 Sq.ft. )
2 BHK SALE59.4 Sq.mts. ( 639 Sq.ft. )
2 BHK SALE59.43 Sq.mts. ( 640 Sq.ft. )
Office space310.81 Sq.mts. ( 3346 Sq.ft. )
Office space452.6 Sq.mts. ( 4872 Sq.ft. )
1 BHK SALE34.84 Sq.mts. ( 375 Sq.ft. )
1 BHK SALE39.38 Sq.mts. ( 424 Sq.ft. )
2 BHK SALE58.13 Sq.mts. ( 626 Sq.ft. )
1 BHK SALE39.69 Sq.mts. ( 427 Sq.ft. )
2 BHK SALE57.44 Sq.mts. ( 618 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sai Enclave Building No.2last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Water Supply
Wip
Water Conservation, Rain water Harvesting
Wip
Treatment And Disposal Of Sewage And Sullage Water
Wip
Street Lighting
Wip
Storm Water Drains
Wip
Solid Waste Management And Disposal
Wip
Sewerage (Chamber, Lines, Septic Tank , STP)
Wip
Open Parking
Na
Landscaping & Tree Planting
Wip
Fire Protection And Fire Safety Requirements
Wip
Energy management
Na
Electrical Meter Room, Sub-Station, Receiving Station
Wip
Community Buildings
Na
Aggregate area of recreational Open Space
Na
Buildings / Wings in Sai Enclave Building No.2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sai Enclave Building No.2 by M/S. Radheya Construction Companylast updated on 28 Jul 2025 as per information obtained from MARA RERA.

146175 Sq. ft.

Project Area

9405 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

379 apartments in total
Total
379
Booked
21
Available
358

Saleable Area Statistics (Sq. ft.)

185696 Total
Total
185696
Booked
10356
Available
175340
Total 379 apartments in project. 21 apartments booked. 5% apartments booked.
Total 185696 Sq.ft. saleable area. 10356 saleable area booked.
6% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingDec 202914101015553
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK SALE39.45 Sq.mts. ( 425 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK SALE39.46 Sq.mts. ( 425 Sq.ft. )38
None Booked0% Booked
0% Booked
1 BHK SALE39.81 Sq.mts. ( 429 Sq.ft. )21
None Booked0% Booked
0% Booked
1 BHK SALE40.04 Sq.mts. ( 431 Sq.ft. )42
1 BHK SALE44.64 Sq.mts. ( 481 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK SALE57.04 Sq.mts. ( 614 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK SALE57.45 Sq.mts. ( 618 Sq.ft. )20
None Booked0% Booked
0% Booked
2 BHK SALE59.4 Sq.mts. ( 639 Sq.ft. )16
None Booked0% Booked
0% Booked
2 BHK SALE59.43 Sq.mts. ( 640 Sq.ft. )2
2 Booked100% Booked
100% Booked
Office space310.81 Sq.mts. ( 3346 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space452.6 Sq.mts. ( 4872 Sq.ft. )1
None Booked0% Booked
0% Booked
149 total apartments / 14 apartments booked. 9% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingDec 20291410104955
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK SALE34.84 Sq.mts. ( 375 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK SALE39.38 Sq.mts. ( 424 Sq.ft. )69
None Booked0% Booked
0% Booked
1 BHK SALE39.45 Sq.mts. ( 425 Sq.ft. )43
None Booked0% Booked
0% Booked
2 BHK SALE58.13 Sq.mts. ( 626 Sq.ft. )23
None Booked0% Booked
0% Booked
138 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress22% done
22% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress33% done
33% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress20% done
20% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingDec 20291410106452
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK SALE39.45 Sq.mts. ( 425 Sq.ft. )46
1 BHK SALE39.69 Sq.mts. ( 427 Sq.ft. )23
None Booked0% Booked
0% Booked
2 BHK SALE57.44 Sq.mts. ( 618 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK SALE57.45 Sq.mts. ( 618 Sq.ft. )19
None Booked0% Booked
0% Booked
92 total apartments / 7 apartments booked. 7% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress33% done
33% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress25% done
25% Booked
Channel Partners
Channel Partners Registered by Developer
M/S. Radheya Construction Company
for Project
Sai Enclave Building No.2
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation