Project overview

Sai Darshan Type C is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000005978. Sai Darshan Type C is located at 1831. This is a Ongoing being developed by Dinesh Sadanand Bari.

Sai Darshan Type C has 2 BHK Apartments with carpet areas ranging from 561 to 664 Sq.ft. Carpet. The Project has total 12 of which 8 are currently available for sale.

Sai Darshan Type C is being developed on a total land area of 7804 Sq.ft. out of which 5221 Sq.ft. i.e 67% is reserved for recreational purposes. Sai Darshan Type C has 1 Wings / Towers Type C

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Sai Darshan Type C
  • Location:
  • 1831
  • Const. Stage:
    Ongoing
  • Possession:
    31 Mar 2018
Developer Details

  • Developer:
    Dinesh Sadanand Bari
  • Phone:
  • Address:
  • Omkar Swaroop
Project RERA Details
MAHA REARA No: P99000005978
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Nandadeep M Kokane & Associates
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 31 Mar 2018
Revised Possession 31 Mar 2018
Extended Possession
Litigations No Litigations
Last Modified 14 Aug 2017
Last Retrived 28 Jul 2025
Sai Darshan Type C QR Code
Sai Darshan Type C
MahaRERA - P99000005978
Apartment Details & Configuration
TypeArea
2 BHK52.12 Sq.mts. ( 561 Sq.ft. )
2 BHK61.72 Sq.mts. ( 664 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sai Darshan Type Clast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station50% completed
50% Complete
At The End Of Building Constuction
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
At The End Of Building Constuction
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)50% completed
50% Complete
At The End Of Building Constuction
Solid Waste Management And Disposal
Na
Storm Water Drains20% completed
20% Complete
At The End Of Building Constuction
Street Lighting5% completed
5% Complete
At The End Of Building Constuction
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
At The End Of Building Constuction
Water Supply50% completed
50% Complete
At The End Of Building Constuction
Buildings / Wings in Sai Darshan Type C
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sai Darshan Type C by Dinesh Sadanand Barilast updated on 28 Jul 2025 as per information obtained from MARA RERA.

7804 Sq. ft.

Project Area

5221 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

12 apartments in total
Total
12
Booked
4
Available
8

Saleable Area Statistics (Sq. ft.)

7766 Total
Total
7766
Booked
2554
Available
5211
Total 12 apartments in project. 4 apartments booked. 33% apartments booked.
Total 7766 Sq.ft. saleable area. 2554 saleable area booked.
33% area booked.

Type C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type CJan 19004101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK52.12 Sq.mts. ( 561 Sq.ft. )2
1 Booked50% Booked
50% Booked
2 BHK61.72 Sq.mts. ( 664 Sq.ft. )10
3 Booked30% Booked
30% Booked
12 total apartments / 4 apartments booked. 33% apartments booked.
Work Description in Building Type CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
work-in-progress95% done
95% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress48% done
48% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress60% done
60% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress60% done
60% Booked
Stilt Floor
work-in-progress70% done
70% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress75% done
75% Booked
Channel Partners
Channel Partners Registered by Developer
Dinesh Sadanand Bari
for Project
Sai Darshan Type C
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation