Project overview

Sai Complex is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000027789. Sai Complex is located at Surveyno.48, Hissa N0.9. This is a New being developed by Shree Ganesh Builders And Developers.

Sai Complex has 1 BHK, 2 BHK, Office space & Shop Apartments with carpet areas ranging from 110 to 954 Sq.ft. Carpet. The Project has total 62 of which 19 are currently available for sale.

Sai Complex is being developed on a total land area of 6792 Sq.ft. out of which 7784 Sq.ft. i.e 115% is reserved for recreational purposes. Sai Complex has 1 Wings / Towers Sai Complex

ProjectDeveloperLocationPossession
Dipti Sky City Phase 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
Snehal Paradise Wing AM/S Krishna DevelopersS No 2A H No 2B31-01-2020 00:00:00
Shree RajRajententerprisesSr No 39 H No 530-04-2019 00:00:00
Mohankheda GreensRajeshkumar Moolchand RupawatSurvey No 38 Hissa No 330-12-2023 00:00:00
Ozone GalaxyHallmark Infra Realty Llp64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
Shubham Galaxy - B WingNavkar Associates4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Shafique Khatimiti TowerRameez Shahnawaz MajeedCts 126430-12-2021 00:00:00
ElementsUma RealtyC. S. No. 27/130-12-2023 00:00:00
Shree Siddhivinayak Park Wing A1 And A2Satyashiv DevelopersS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
Master BuildconMaster BuildconGut No 27 Plot No 1630-03-2022 00:00:00
Sai Tirth Phase IPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KasturiJ.K.InfraS R No 130 Hissa No 330-12-2024 00:00:00
PadmanabhYash Govinda Build Infra LlpTika No.10, C.T.S No.222B24-10-2023 00:00:00
Orchid A To LPalava Dwellers Pvt Ltd27Pt And 139/2 Pt30-06-2018 00:00:00
Tanisha HeightsM/S. Balaji DevelopersCts No. 1962-197230-03-2023 00:00:00
Sai PurabWestern Arch Developers9/1/230-09-2023 00:00:00
Akshar EvannaM/S Akshar Om ConstructionPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B And B1Rassaz Infrastructure Private Limited369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
Vimal ShreeRitesh Ramesh JainOld Sno 215 Hno 1 New Sno 198 Hno 130-12-2023 00:00:00
Sai PalacePravin Narasi Manani3630-06-2022 00:00:00
Saishiv ComplexSaishiv ConstructionSurvey No 54 By 3 Hissa No 1 And 230-12-2023 00:00:00
Swami Samarth ApartmentMhatre Developers1231A30-03-2023 00:00:00
Yashoghar ChsBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
Vishwajeet Precious Phase IAbhijeet PrideSurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
Bhakti ParkShivkrupa Enterprises730-03-2023 00:00:00
Priti ApartmentMahesh Mahadu Tare579 To 583 , 604 A And B30-12-2022 00:00:00
Raj Regalia Phase-1AAmrut Laxmi DevelopersS No. 54/3/E, 55/2, 55/330-06-2023 00:00:00
Regency Park Iii Building No 2Johar Hasan ZojwallaCts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
Seasons SaharaSamarth Sai Builders & DevelopersS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/S Vedant Chetana Enterprises NxS No.380, Cts No 133230-12-2023 00:00:00
Lodha Quality Home Tower 4Macrotech Developers Limited32/10P, 32/15P, 32/14P30-09-2024 00:00:00
Vishwajeet Pink CityGulabrao Baburao Karanjule PatilGut No.48, Plot No.15,19,23,24,25,26,27 And 3730-05-2025 00:00:00
Spm Lake City Phase Ii Part 1Kothari & Deshmukh Landmark LlpSurvey No 56 Hissa No 230-01-2026 00:00:00
Navare PlazaOm Developers8028 8029 803028-08-2022 00:00:00
Sai HeritageMitra HomesSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
Shree Girijatmak Co Op Hou Soc LtdShree Saraswati DevelopersOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
TiaraSagar EnterpriseS No 20 And Chalta No 2430-03-2024 00:00:00
Metro Aangan Phase - IMetro CreatorsS No 78 H No 7 P And 8 P30-12-2028 00:00:00
Prakruti SparshAvishkar BuildconS No 49, H No 10D30-12-2022 00:00:00
Shreeman Residency B And C WingOm EnterprisesSurvey No 1 Hissa No 14/2, 14/1/230-12-2029 00:00:00
ValenciaImpressionsC T S No 2065 To 2068, 1465 And 146630-06-2024 00:00:00
Silver Creast Wing -A Phase - IiShrikrishna EnterprisesS No 83 H No 1430-03-2026 00:00:00
Sheth SupremeSheth Builders Private LimitedOld Survey No 159 Pt And New Survey No 20 Pt30-12-2024 00:00:00
One AksharAkshar RealtorsPlot No 730-12-2026 00:00:00
Vedant KalashShivalik DevelopersSurvey No 48 Hissa No 2 Plot No 5 And 630-03-2022 00:00:00
Shreeram ResidencyRaghunath Kedari Phadtare690/330-12-2025 00:00:00
Jagjeet EnclaveJagjeet Shrusti Realtors29/1/C04-05-2024 00:00:00
Zunera Heights786 Micron Builders & Developers101/ 2 3 4 5 1230-12-2022 00:00:00
Krishna GalaxyKrishna Builders & DevelopersSurvey No 42 Hissa No 230-06-2023 00:00:00
Villa SmaranOm Villa Buildtech LlpCts No 1194E And Cts No 1194A Sector 2930-03-2024 00:00:00
Virat MansionNeelyog DevelopersCts No 9907,9908 To 991330-12-2022 00:00:00
Shiv Aangan ResidencyDhananjay DevelopersSurvey No 40 Hissa No 5/2 And 5/630-03-2025 00:00:00
Nana Patil ResidencyQuality Builders & DevelopersPardi No 3, Hissa No 1, Hissa No 231-01-2021 00:00:00
Satyam OrchidGirija InfrastructurePlot No 1030-12-2021 00:00:00
Arjun VillaManohar Sahebrao Kadam192-J230-03-2022 00:00:00
Dosti Greater Thane - Phase 1Adrika Developers Private Limited9/4 Pt,7/8 Pt,7/1Pt, 11/25Pt,11/23Pt,12/19Pt,7/13Pt,11/17Pt,11/12Pt,11/13Pt,11/7Pt,11/1Pt,11/8Pt,11/18Pt,11/19A Pt,11/19B Pt,11/15Pt,11/16Pt,11/14Pt,11/11Pt,12/9Pt,11/21Pt01-04-2026 00:00:00
Sai Lake AtulyamMatoshree ConstructionOld 129/1/A Paiki-3 Plot No. 5, New 129/1/Sh/Plot No. 530-12-2025 00:00:00
Iris Mira Road EJeetendra Alias Ravi Amarnath Kapoor21/1, 24/230-12-2022 00:00:00
Sai EnclaveVighnaharta DevelopersSurvey No 57 Hissa No 1 And 2 Part30-12-2023 00:00:00
Gayatri EleganceGayatrikripa Developers Private LimitedOld Survey No. 229, Hissa No. 1330-12-2025 00:00:00
Shree Saishraddha Apartment Building AShree Saishraddha EnterprisesSurvey No 9/3 And 16/130-03-2023 00:00:00
Pinnacolo NxSkd Realty LlpOld S.No.445,New S.No.12930-06-2025 00:00:00
Mhatre CompoundLodha Developers Limited85/2 Pt30-06-2018 00:00:00
Aastha River ViewAastha Buildcon3 And 4 / Sec 1830-12-2022 00:00:00
Patels Prayosha - Pramukh SadanSahajanand DevelopersSurvey No 39A Hissa No 1A And 1B30-12-2023 00:00:00
Akshar Business Park- Phase IiiAkshar DevelopersPlot No. 3, Sector-2531-07-2022 00:00:00
Swaraj OrchidM/S Crystal HomesSurvey No 25 Hissa No 230-12-2022 00:00:00
Surya ComplexM/S. Jai Santoshi Maa EnterprisesS. No. 102, H. No.2, 3 Pt, 5, 17, 1830-06-2023 00:00:00
19 EastMoreshwar Developers5230-12-2025 00:00:00
Reliance GoldGolden EnterprisesS No 58/1/4 S No 59/128-02-2028 00:00:00
Basera HeightsKamruddin Hasmullah SiddiqueOld Sno 223/5 221/1 New Sno 191/5 190/130-03-2024 00:00:00
Siddhivinayak GardensA1 Buildcon991, 2, 3 And 1001830-12-2024 00:00:00
Shree ShaliniJay Service And ConsultantCts No 251 And 252A30-09-2023 00:00:00
M Square It ParkPaper FlutingsA241 And A24230-03-2024 00:00:00
Shree Ganesh SymphonyPawar GroupS. No.172, H.No.1/801-12-2025 00:00:00
Trimurti GardenSai Narayan DevelopersSurvey No 126 Hissa No 130-12-2025 00:00:00
Tulsi Aahan - B WingRaj GroupS No 39, H No 1,230-12-2022 00:00:00
Ritz Phase - IiVikas Harakchand JainSurvey No. 39/5 Part, 6/1 Part And 6/2 Part.30-06-2024 00:00:00
Ganpati HeightsManoj Prabhakar PatilS. No 2 H No 23B30-05-2024 00:00:00
Omkar Darshan Co Op Hsg SocVinod Madhukar BhoirS No 26 H No 2A Plot No 430-06-2024 00:00:00
Mount View R4 To R7Himanshu Builders & DevelopersS No 67/3A 68/9B31-12-2023 00:00:00
Balaji VivantaMayur Enterprises Builders & DevelopersPlot No 3 ,Hissa No 1 ,2,3 ,4 Old Survey No 71 Hissa No 1,231-12-2023 00:00:00
Balaji AnnexM/S Om Swayambhu Siddhivinayak Builders And DevelopersSurvey No 93/3, 93/4, 93/530-12-2026 00:00:00
Arya ArianaAshapura Corporation5664/A30-03-2024 00:00:00
GajananGk BuildconB6330-06-2023 00:00:00
Empire Industrial Centrum Phase-IiiEmpire Industries Limited22R30-03-2026 00:00:00
Empire Industrial Centrum Phase-IvEmpire Industries Limited2230-03-2025 00:00:00
Seasons Sahara Building No 2Samarth Sai Builders & DevelopersS No 24/2 At Village Adavli-Dhokli Taluka Ambernath And S No 34/10, 34/11, 34/12 At Village Pisavli Taluka Kalyan30-12-2024 00:00:00
Sai Geeta Apt.K K EnterprisesSurvey No 29, H N 5A, Plot No 7231-12-2023 00:00:00
Laxminarayan ParkJalaram InfraSurvey No 63 Hissa No331-12-2023 00:00:00
Mangaljyot Co Op Hsg Soc LtdShridhar Dattatray Patil8/B/1/2 And 9/B/1/331-12-2026 00:00:00
Rajeshwari Residency Phase IiShree Siddhi ConstructionSurvey No 30/2, 30/3/2/1, 30/3/2/230-03-2025 00:00:00
Pinnacle RoyalPinnacle InfraGut No41, Hissa No 20, Plot No 1530-03-2023 00:00:00
Kohinoor AashiyanaKgi Realty Private Limited24/3 37/130-10-2024 00:00:00
Dream AvenueDream Maruti RealtorsS No 15, H No 4 - S No 16, H No 331-12-2025 00:00:00
Kisan HeightsPravin Kisan BhoirS No 86/1/130-09-2027 00:00:00
Regency Sarvam Phase 12Regency Nirman LtdS No.42/1, 42/2, 42/3, 42/4A/1, 42/4A/2, 42/5, 42/6, 47/1, 50/1A, 50/2, 220/1, 201/1, 223/130-11-2024 00:00:00
HarmonyBuildman Construction225/831-12-2019 00:00:00
N G Valencia Phase IiRna Builders (Ng)S No 335/3 Part Old 338/10 New30-09-2020 00:00:00
VandanamMetro BuildconSurvey No 68Plot No 28 Hissa No 1P 3P 4P30-12-2021 00:00:00
Siyara IconShakti Realty1/34/35/36/44/79/3/80/131-12-2025 00:00:00
SpectrumKulin Enterprises3445-3454, 3455-347401-12-2024 00:00:00
Liana CMacrotech Developers Limited65 /15 A (Pt)31-03-2026 00:00:00
Vedant Palacia Phase Iv Wing B-BrutusTharwani PropertiesSr.No.16,Hissa No.431-12-2026 00:00:00
Delta StellarNoble Organics Pvt. Ltd.Plot No D-43/3 And D-43/431-12-2028 00:00:00
Mauli SadanMauli ConstructionCts 9039 To 904304-02-2024 00:00:00
Project Details
  • Project:
    Sai Complex
  • Location:
  • Surveyno.48, Hissa N0.9
  • Const. Stage:
    New
  • Possession:
    30 Jun 2025
Developer Details

  • Developer:
    Shree Ganesh Builders And Developers
  • Phone:
  • Address:
  • Shiv Shrushti Complex
Project RERA Details
MAHA REARA No: P99000027789
Project Type Others
RERA Project Status New
Architect Shree Consultants
Funding Bank IDBI BANK
Proposed Possession 30 Jun 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 03 Jan 2021
Last Retrived 28 Jul 2025
Sai Complex QR Code
Sai Complex
MahaRERA - P99000027789
Apartment Details & Configuration
TypeArea
1 BHK30.66 Sq.mts. ( 330 Sq.ft. )
1 BHK30.84 Sq.mts. ( 332 Sq.ft. )
1 BHK37.64 Sq.mts. ( 405 Sq.ft. )
1 BHK39.56 Sq.mts. ( 426 Sq.ft. )
2 BHK50.05 Sq.mts. ( 539 Sq.ft. )
2 BHK58.93 Sq.mts. ( 634 Sq.ft. )
Office space88.65 Sq.mts. ( 954 Sq.ft. )
Office space105.44 Sq.mts. ( 1135 Sq.ft. )
Shop76.52 Sq.mts. ( 824 Sq.ft. )
Shop10.18 Sq.mts. ( 110 Sq.ft. )
Shop12.04 Sq.mts. ( 130 Sq.ft. )
Shop13.96 Sq.mts. ( 150 Sq.ft. )
Shop14.05 Sq.mts. ( 151 Sq.ft. )
Shop14.57 Sq.mts. ( 157 Sq.ft. )
Shop16.02 Sq.mts. ( 172 Sq.ft. )
Shop16.3 Sq.mts. ( 175 Sq.ft. )
Shop16.6 Sq.mts. ( 179 Sq.ft. )
Shop21.28 Sq.mts. ( 229 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sai Complexlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
As Per Norms
Electrical Meter Room, Sub-Station, Receiving Station
Meter Room Will Installed After Completion
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Fire Noc
Landscaping & Tree Planting
As Per Tree Noc
Open Parking
8
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Norms
Solid Waste Management And Disposal
Waste Will Be Collected In Seperate Dustbins
Storm Water Drains
As Per Norms
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
As Per Norms
Water Supply
Vvcmc Will Give Connection After Oc
Buildings / Wings in Sai Complex
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sai Complex by Shree Ganesh Builders And Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

6792 Sq. ft.

Project Area

7784 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

62 apartments in total
Total
62
Booked
43
Available
19

Saleable Area Statistics (Sq. ft.)

27433 Total
Total
27433
Booked
17676
Available
9757
Total 62 apartments in project. 43 apartments booked. 69% apartments booked.
Total 27433 Sq.ft. saleable area. 17676 saleable area booked.
64% area booked.

Sai Complex

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sai ComplexDec 202415101081
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.66 Sq.mts. ( 330 Sq.ft. )9
8 Booked88% Booked
88% Booked
1 BHK30.84 Sq.mts. ( 332 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK37.64 Sq.mts. ( 405 Sq.ft. )7
2 Booked28% Booked
28% Booked
1 BHK39.56 Sq.mts. ( 426 Sq.ft. )5
3 Booked60% Booked
60% Booked
2 BHK50.05 Sq.mts. ( 539 Sq.ft. )12
12 Booked100% Booked
100% Booked
2 BHK58.93 Sq.mts. ( 634 Sq.ft. )10
5 Booked50% Booked
50% Booked
Office space88.65 Sq.mts. ( 954 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space105.44 Sq.mts. ( 1135 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop76.52 Sq.mts. ( 824 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop10.18 Sq.mts. ( 110 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop12.04 Sq.mts. ( 130 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.96 Sq.mts. ( 150 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop14.05 Sq.mts. ( 151 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop14.57 Sq.mts. ( 157 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.02 Sq.mts. ( 172 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop16.3 Sq.mts. ( 175 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop16.6 Sq.mts. ( 179 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop21.28 Sq.mts. ( 229 Sq.ft. )1
1 Booked100% Booked
100% Booked
62 total apartments / 43 apartments booked. 69% apartments booked.
Work Description in Building Sai ComplexCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Shree Ganesh Builders And Developers
for Project
Sai Complex
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation