Project overview

Sahara Regency is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000049198. Sahara Regency is located at 1721/A. This is a New being developed by S. G. Builders And Developers.

Sahara Regency has 1 BHK, 1RK & 2 BHK Apartments with carpet areas ranging from 271 to 598 Sq.ft. Carpet. The Project has total 50 of which 27 are currently available for sale.

Sahara Regency is being developed on a total land area of 9472 Sq.ft. out of which 5389 Sq.ft. i.e 57% is reserved for recreational purposes. Sahara Regency has 2 Wings / Towers Sahara Regency Wing A,Sahara Regency Wing B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Sahara Regency
  • Location:
  • 1721/A
  • Const. Stage:
    New
  • Possession:
    31 May 2024
Developer Details

  • Developer:
    S. G. Builders And Developers
  • Phone:
  • Address:
  • Vinodini
Project RERA Details
MAHA REARA No: P99000049198
Project Type Residential / Group Housing
RERA Project Status New
Architect One Source
Funding Bank BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession 31 May 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 21 Jun 2024
Last Retrived 28 Jul 2025
Sahara Regency QR Code
Sahara Regency
MahaRERA - P99000049198
Apartment Details & Configuration
TypeArea
1 BHK35.79 Sq.mts. ( 385 Sq.ft. )
1 BHK38.29 Sq.mts. ( 412 Sq.ft. )
1 BHK40.61 Sq.mts. ( 437 Sq.ft. )
1RK29.21 Sq.mts. ( 314 Sq.ft. )
2 BHK41.7 Sq.mts. ( 449 Sq.ft. )
2 BHK50.2 Sq.mts. ( 540 Sq.ft. )
Shop9.84 Sq.mts. ( 106 Sq.ft. )
Shop11.89 Sq.mts. ( 128 Sq.ft. )
1 BHK34.35 Sq.mts. ( 370 Sq.ft. )
1RK25.14 Sq.mts. ( 271 Sq.ft. )
2 BHK55.58 Sq.mts. ( 598 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sahara Regencylast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
1 Car Parking &Amp; 45 Scooter Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Na
Buildings / Wings in Sahara Regency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sahara Regency by S. G. Builders And Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

9472 Sq. ft.

Project Area

5389 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

50 apartments in total
Total
50
Booked
23
Available
27

Saleable Area Statistics (Sq. ft.)

19654 Total
Total
19654
Booked
9194
Available
10460
Total 50 apartments in project. 23 apartments booked. 46% apartments booked.
Total 19654 Sq.ft. saleable area. 9194 saleable area booked.
47% area booked.

Sahara Regency Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sahara Regency Wing ANov 20236101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.79 Sq.mts. ( 385 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK38.29 Sq.mts. ( 412 Sq.ft. )16
8 Booked50% Booked
50% Booked
1 BHK40.61 Sq.mts. ( 437 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK29.21 Sq.mts. ( 314 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK41.7 Sq.mts. ( 449 Sq.ft. )5
3 Booked60% Booked
60% Booked
2 BHK50.2 Sq.mts. ( 540 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop9.84 Sq.mts. ( 106 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop11.89 Sq.mts. ( 128 Sq.ft. )2
1 Booked50% Booked
50% Booked
29 total apartments / 15 apartments booked. 51% apartments booked.
Work Description in Building Sahara Regency Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress20% done
20% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress20% done
20% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress77% done
77% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress90% done
90% Booked
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Sahara Regency Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sahara Regency Wing BMay 20247101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.35 Sq.mts. ( 370 Sq.ft. )7
3 Booked42% Booked
42% Booked
1RK25.14 Sq.mts. ( 271 Sq.ft. )7
2 BHK55.58 Sq.mts. ( 598 Sq.ft. )7
4 Booked57% Booked
57% Booked
21 total apartments / 8 apartments booked. 38% apartments booked.
Work Description in Building Sahara Regency Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress20% done
20% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress20% done
20% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress42% done
42% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
S. G. Builders And Developers
for Project
Sahara Regency
last updated on 28 Jul 2025 as per information obtained from MARA RERA.