Project overview

Saffron Residency Phase -1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800007485. Saffron Residency Phase -1 is located at 115, 115/1 To 12. This is a Ongoing being developed by Ayodhya Construction Co.

Saffron Residency Phase -1 has 1 BHK & 1RK Apartments with carpet areas ranging from 236 to 350 Sq.ft. Carpet. The Project has total 287 of which 67 are currently available for sale.

Saffron Residency Phase -1 is being developed on a total land area of 73222 Sq.ft. out of which 10903 Sq.ft. i.e 15% is reserved for recreational purposes. Saffron Residency Phase -1 has 4 Wings / Towers Wing A,Wing B,Wing C,Wing D

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Saffron Residency Phase -1
  • Location:
  • 115, 115/1 To 12
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    Ayodhya Construction Co
  • Phone:
  • Address:
  • Navin Manju Chs Ltd
Project RERA Details
MAHA REARA No: P51800007485
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Manish M Shah
Funding Bank BANK OF BARODA
Proposed Possession 30 Dec 2022
Revised Possession 30 Dec 2022
Extended Possession 30 Dec 2024
Litigations No Litigations
Last Modified 02 Apr 2024
Last Retrived 26 Jul 2025
Saffron Residency Phase -1 QR Code
Saffron Residency Phase -1
MahaRERA - P51800007485
Apartment Details & Configuration
TypeArea
2 BHK52.3 Sq.mts. ( 563 Sq.ft. )
2.5 BHK63.17 Sq.mts. ( 680 Sq.ft. )
Shop19.28 Sq.mts. ( 208 Sq.ft. )
Shop25.32 Sq.mts. ( 273 Sq.ft. )
Shop25.83 Sq.mts. ( 278 Sq.ft. )
Shop27.99 Sq.mts. ( 301 Sq.ft. )
Shop31.97 Sq.mts. ( 344 Sq.ft. )
1 BHK40.88 Sq.mts. ( 440 Sq.ft. )
1 BHK42.83 Sq.mts. ( 461 Sq.ft. )
Shop23.53 Sq.mts. ( 253 Sq.ft. )
Shop23.86 Sq.mts. ( 257 Sq.ft. )
Shop26.42 Sq.mts. ( 284 Sq.ft. )
Shop26.68 Sq.mts. ( 287 Sq.ft. )
Shop26.77 Sq.mts. ( 288 Sq.ft. )
Shop34.12 Sq.mts. ( 367 Sq.ft. )
Shop26.88 Sq.mts. ( 289 Sq.ft. )
1 BHK32.54 Sq.mts. ( 350 Sq.ft. )
1RK21.95 Sq.mts. ( 236 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Saffron Residency Phase -1last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Will Be Provided Bef Full Oc
Basement Parking Stack Parking50% completed
50% Complete
83 Stack Parking
Community Buildings
As Per Sg Authority Bef Oc
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
As Per Power Auth Bef Oc
Energy management100% completed
95% Complete
As Per Power Auth Bef Oc
Fire Protection And Fire Safety Requirements85% completed
85% Complete
As Per Cfo Noc Bef Oc
Landscaping & Tree Planting100% completed
95% Complete
As Per Mcgm Norms
Mechanical Tower Parking50% completed
50% Complete
Tower Parking
Open Parking50% completed
50% Complete
36 Open Parking - 12 Each For A / B / C Wing
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
As Per Drainage Layout Bef Oc
Solid Waste Management And Disposal100% completed
95% Complete
As Per Swm Remark Before Issue Of Oc
Storm Water Drains100% completed
95% Complete
As Per Swd Remrk Bef Oc
Street Lighting100% completed
95% Complete
As Per Consultant Design Bef Oc
Swimming Pool and other open amenities50% completed
50% Complete
Common Amenities
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
As Per Sewerage Remark &Amp; Swd Remark Bef Oc
Water Conservation, Rain water Harvesting100% completed
95% Complete
As Per Rwh Consultant Bef Oc
Water Supply100% completed
95% Complete
As Per P Form Before Oc
Buildings / Wings in Saffron Residency Phase -1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Saffron Residency Phase -1 by Ayodhya Construction Colast updated on 26 Jul 2025 as per information obtained from MARA RERA.

73222 Sq. ft.

Project Area

10903 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

287 apartments in total
Total
287
Booked
220
Available
67

Saleable Area Statistics (Sq. ft.)

137406 Total
Total
137406
Booked
102293
Available
35113
Total 287 apartments in project. 220 apartments booked. 76% apartments booked.
Total 137406 Sq.ft. saleable area. 102293 saleable area booked.
74% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing ADec 20211812101280
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK52.3 Sq.mts. ( 563 Sq.ft. )36
22 Booked61% Booked
61% Booked
2.5 BHK63.17 Sq.mts. ( 680 Sq.ft. )36
32 Booked88% Booked
88% Booked
Shop19.28 Sq.mts. ( 208 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop25.32 Sq.mts. ( 273 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop25.83 Sq.mts. ( 278 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop27.99 Sq.mts. ( 301 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop31.97 Sq.mts. ( 344 Sq.ft. )1
1 Booked100% Booked
100% Booked
77 total apartments / 58 apartments booked. 75% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress90% done
90% Booked
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BDec 20211812101280
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.88 Sq.mts. ( 440 Sq.ft. )18
14 Booked77% Booked
77% Booked
1 BHK42.83 Sq.mts. ( 461 Sq.ft. )18
16 Booked88% Booked
88% Booked
2 BHK52.3 Sq.mts. ( 563 Sq.ft. )36
22 Booked61% Booked
61% Booked
Shop23.53 Sq.mts. ( 253 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop23.86 Sq.mts. ( 257 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop26.42 Sq.mts. ( 284 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop26.68 Sq.mts. ( 287 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop26.77 Sq.mts. ( 288 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop34.12 Sq.mts. ( 367 Sq.ft. )1
None Booked0% Booked
0% Booked
78 total apartments / 54 apartments booked. 69% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress90% done
90% Booked
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CDec 20211812101280
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.88 Sq.mts. ( 440 Sq.ft. )18
16 Booked88% Booked
88% Booked
1 BHK42.83 Sq.mts. ( 461 Sq.ft. )18
14 Booked77% Booked
77% Booked
2 BHK52.3 Sq.mts. ( 563 Sq.ft. )36
19 Booked52% Booked
52% Booked
Shop23.53 Sq.mts. ( 253 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop23.86 Sq.mts. ( 257 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop26.42 Sq.mts. ( 284 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop26.77 Sq.mts. ( 288 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop26.88 Sq.mts. ( 289 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop34.12 Sq.mts. ( 367 Sq.ft. )1
1 Booked100% Booked
100% Booked
78 total apartments / 54 apartments booked. 69% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress86% done
86% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress75% done
75% Booked
Sanitary Fittings within the flats / premises
work-in-progress75% done
75% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress95% done
95% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing DDec 2021181010033
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.54 Sq.mts. ( 350 Sq.ft. )18
18 Booked100% Booked
100% Booked
1RK21.95 Sq.mts. ( 236 Sq.ft. )36
36 Booked100% Booked
100% Booked
54 total apartments / 54 apartments booked. 100% apartments booked.
Work Description in Building Wing DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress75% done
75% Booked
Sanitary Fittings within the flats / premises
work-in-progress75% done
75% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Ayodhya Construction Co
for Project
Saffron Residency Phase -1
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation