Project overview

Saffron Residency Phase -1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800007485. Saffron Residency Phase -1 is located at 115, 115/1 To 12. This is a Ongoing being developed by Ayodhya Construction Co.

Saffron Residency Phase -1 has 1 BHK & 1RK Apartments with carpet areas ranging from 236 to 350 Sq.ft. Carpet. The Project has total 287 of which 67 are currently available for sale.

Saffron Residency Phase -1 is being developed on a total land area of 73222 Sq.ft. out of which 10903 Sq.ft. i.e 15% is reserved for recreational purposes. Saffron Residency Phase -1 has 4 Wings / Towers Wing A,Wing B,Wing C,Wing D

ProjectDeveloperLocationPossession
Stella Sapphire B WingVaibhavlaxmi Builders And Developers51 Part31-12-2018 00:00:00
Shree Siddhi Bldg No 69Hiranimanthan Builders And Developers12 Pt31-03-2020 00:00:00
Venus TowersVenus EnterprisesMumbai Suburban31-12-2020 00:00:00
Runwal Forest Tower 1-4Wheelabrator Alloy Castings LimitedPt.596-598, 602/1-9, 606/1-83, 605/1-17, 607A607d596/1-6, 601-606, 599A/1-81, 607/1-3130-04-2022 00:00:00
Altavista - Phase 2Spenta Enclave Private Limited343 Part30-06-2021 00:00:00
Vishnubhuvan Chs LtdShree S S Developers Private Limited222Pt30-12-2022 00:00:00
Shree DeeplaxamiPuro Constructions1332, 44631-12-2019 00:00:00
Shree Samarth Galaxy Sra Chs LtdShree S S Developers Private Limited222Pt Of Village Kanjur31-12-2018 00:00:00
Shree Shivsamarth ResidencyShree Shiv Samarth Developers89, 88/1 Pt, 88Pt, 87/1 To 431-12-2018 00:00:00
Sunshine OakwoodSunshine Housing Private LimitedCts No 403 C30-03-2024 00:00:00
Sai Ashish IiKukreja Construction CoCts No.411/A Of Village Bhanduo, Tal Mulund31-12-2017 00:00:00
Altavista - Phase 1Spenta Enclave Private Limited343 Part31-12-2019 00:00:00
Godrej CentralGodrej Landmark Redevelopers Private LimitedCts 49/Pt, 5630-03-2021 00:00:00
Ratnadeep Chs LtdS D Bhalerao Constructions Pvt Ltd Bldg No 60 JvSambar Galli31-05-2019 00:00:00
Zia Complex Wing EI. R. ConstructionMumbai Suburban, 40007030-09-2020 00:00:00
East Point.A A Property DevelopersCts No 6P And 7 P Kurla E Mumbai Suburban30-12-2027 00:00:00
Nehru Nagar Sharada Chs Ltd Bldg No. 62Parsn Construction And Developers Private LimitedVillage Kurla Iii30-12-2022 00:00:00
Nehru Nagar Panchratna Chs Ltd, Bldg. No.5Parsn Construction And Developers Private LimitedTaluka Kurla 400024., Village Kurla Iii, Survey No. 229 And 26730-06-2021 00:00:00
Bhandup Citizen Chs LtdCastle Floors Pms Pvt LtdMumbai Suburban, 40007830-06-2021 00:00:00
Kurla Kadam Scoiety Phase 1Pramod PisalMumbai Suburban, 40002430-06-2021 00:00:00
Marvel Gold - Phase ISwaroop Constructions Private Limited408 Part 408/1 To 3 412 Part 412/2 To 10 412/18 412/20 To 5430-12-2021 00:00:00
Sagar C.H.SHiranimanthan Builders And Developers12 Pt31-12-2019 00:00:00
Safal TrademarkJai Mata Di Home Construction Pvt Ltd303 1 To 45, Cts No 30330-12-2023 00:00:00
Ekta Co-Op Hsg SocietySurjit Bhojsingh Ailsinghani7 Pt, 6/140 To 144, 6 Pt30-12-2023 00:00:00
Veer Siddhanak Chs LtdOm Sai Griha Nirman Pvt Ltd114/1601-01-2023 00:00:00
Vaibhav Chowk Sra Chs LtdSunil Mohan JoshiCts No 60 1-70 Bhandup Village30-12-2022 00:00:00
Nehru Nagar Vishwadham Chs LtdApcon Construction CompanyBuilding No 47 City Survey No 12 Pt Mauje Kurla Nehru Nagar Kurla Dist Bandra Mumbai31-12-2019 00:00:00
Skyline Sparkle Wing C Skyline Greathills39331-12-2019 00:00:00
Kuber Varshatai TowerAnand Dattatraya Patil267/C.T.S No.2, 22931-12-2019 00:00:00
Redevelopment Of Gkw Sankey Employees ChslHeritage Lifestyles & Developers Pvt. Ltd.EC.T.S. No. 424 C, Plot No.231-05-2019 00:00:00
Dev DarshanCity Estate Developers LimitedCts No 636, 636 1 To 16 & Cts No 634, 6341 To 2630-12-2022 00:00:00
Samruddhi ChsHasmukh R Hirani1231-12-2019 00:00:00
Vijay Lenyadri Chs LtdS D Bhalerao Constructions Pvt LtdMumbai Suburban31-12-2017 00:00:00
SovenirSuncity CorporationMumbai Suburban, 40007831-08-2016 00:00:00
CelestialSu Sharda Edifice LlpCts No. 549A 549A/ 1 To 330-12-2024 00:00:00
Nehru Nagar Nishigandha Chs LtdAishwarya Builders & Developers65/ 12 Part/ 229 And 26731-12-2019 00:00:00
Puneet KalpavrikshaPuneet Prateeksha SpacesS No 229 S No 267 Cts 11 Pt30-06-2025 00:00:00
Raghav NovaVaidehi Construction & Developers2 Part And 64031-07-2023 00:00:00
Apoorva RiseApoorva Housing56 Part31-12-2024 00:00:00
Kurla Sahayog Chs Ltd., Bldg. No.68Parsn Construction And Developers Private Limited267 Cts No 12, Plot Bearing S N 22930-06-2018 00:00:00
Serene ShelterBuildtech GroupCts 6Pt 7Pt Savera Chs Village Kurla Iiinehru Nahar Sg Barve Marg Kurla East Mum2430-12-2024 00:00:00
Shree Parshwanath Sra Chs LtdChintamani Realtors40007830-12-2021 00:00:00
Marvel Gold - Phase Ii - ColloseumSwaroop Constructions Private LimitedMumbai Suburban30-12-2022 00:00:00
KailasaDevnani Developers252/2, 252/1, Cts No. 25230-06-2021 00:00:00
VastukalpNhk Developers Llp431-D, Cts No. 43130-12-2025 00:00:00
Castle PeakInnerspace190/1, Plot No. 142 Cts No. 19031-03-2018 00:00:00
Saffron Residency Phase -1Ayodhya Construction Co115, 115/1 To 1230-12-2022 00:00:00
Veena SerenityVeena Realcon Private Limited58-Pt01-12-2021 00:00:00
Srishti SolitaireSiddhivinayak EnterpriseCts 242A - 242C31-12-2018 00:00:00
Raghav EnclaveRaghav Raj Builders & Developers Llp12 Part31-12-2027 00:00:00
Sai Krupa Chs LtdS D Bhalerao Constructions Pvt LtdSambar Galli31-12-2016 00:00:00
Stella Sapphire A WingVaibhavlaxmi Builders And Developers51 Part31-12-2019 00:00:00
ZynergyMaa Ashapura DevelopersCts 343Pt30-12-2023 00:00:00
Ruparel OrionK D Lite Developers Pvt LtdCts No. 47030-12-2021 00:00:00
Swanand Bldg No 33Hiranimanthan Builders And Developers11 Pt31-12-2019 00:00:00
Swastik Plaza C Chs Ltd-AvanaPratibha Veekay Real Estate Llp366/1131-12-2018 00:00:00
Gulraj HeightsM/S Neeta Developer4C And Ac/1 To 4C/2231-03-2018 00:00:00
Arya HeightsRishabh EnterprisesCts 46, 46/1 To 930-12-2021 00:00:00
Tirupati HeightTirupati Developer193 Pt, 225 Pt31-08-2018 00:00:00
Aayush PoornimaAayush Developers366/1430-06-2019 00:00:00
Hubtown Seasons - I WingJoynest Premises Private LimitedCts No. 469-A30-12-2025 00:00:00
NakshatraMetro Developers Co.Cts No - 45730-03-2022 00:00:00
Swastik EleganceSwastik Realtors366/5131-12-2023 00:00:00
Nehru Nagar Shiv Vaibhav Chs Ltd Bldg No 38Parsn Construction And Developers Private LimitedSurvey No 229 And 267, Cts No 12 Part31-12-2025 00:00:00
Sapphire TowerMukesh Ramesh Bajaj And Manjit Singh Jodh Singh Abrol296, 296/1, 296/204-07-2024 00:00:00
Altavista - Phase 4Spenta Enclave Private Limited343 Part30-12-2024 00:00:00
Ruparel LiviaShree Siddhivinayak Classic Construction Private LimitedCts No 11, Nehru Nagar30-06-2024 00:00:00
Raghav One45Raghav Raj Builders & Developers Llp228-02-2023 00:00:00
Galaxy Apartments Cdf WingsHousing Development And Infrastructure Ltd13-Pt, 13/3-Pt, 13/2-Pt31-01-2021 00:00:00
Jay KrishnaShreegoandevi Enterprises Private Limited153 And 153/1 To 52 Village Kanjur30-12-2023 00:00:00
M M SpectraM. M. Developers - ShramjiviCts No 61 Part31-10-2018 00:00:00
Shree Swami Samarth KrupaShoreline Builders Pvt LtdC T S No 11 Pt Survey No 229 26715-08-2024 00:00:00
Raghav OneRaghav Raj Builders & Developers Llp230-06-2021 00:00:00
Puneet Prime Phase 2 Floor 3 To Floor 16Puneet Builders12Pt, 267 Cts 11Pt, S No 22930-06-2025 00:00:00
Puneet Prime Phase 3 Floor 17 To Floor 18Puneet BuildersS No 229, 12Pt, 267 Cts 11Pt30-06-2025 00:00:00
Puneet Prime Phase 1 Floor 0 To Floor 2Puneet Builders12 Pt, S.No.229, 267 Cts No 11Pt30-06-2025 00:00:00
Midas Bhoomi HarmonyMidas & Bhoomi Associates, Cts No 11 Pt. Of Village Kurla Iii, Msd30-10-2020 00:00:00
Eastern WindsShree Krishna Homes Pvt. Ltd.Plot No. 3/4 Cts No 13/6 13/7 13/9B30-09-2019 00:00:00
Orchid CourtPranjee Properties Pvt. Ltd.11631-12-2017 00:00:00
Skyview ChsHiranimanthan Builders And Developers22930-12-2019 00:00:00
Serene ShelterNishat Ansari40002431-12-2025 00:00:00
Janki HeritageHeritage Lifestyles & Developers Pvt. Ltd.487/1To 4, 487, 486/131-12-2024 00:00:00
Neptune FlorenciaSachin M Deshmukh And Nayan A Bheda (Aop)Mumbai Suburban31-12-2018 00:00:00
Happy Home C WingEntee Developers177/1-17, 17731-12-2019 00:00:00
Hubtown Seasons CzarnowoJoynest Premises Private LimitedCts No. 469 A31-07-2025 00:00:00
Project Details
  • Project:
    Saffron Residency Phase -1
  • Location:
  • 115, 115/1 To 12
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    Ayodhya Construction Co
  • Phone:
  • Address:
  • Navin Manju Chs Ltd
Project RERA Details
MAHA REARA No: P51800007485
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Manish M Shah
Funding Bank BANK OF BARODA
Proposed Possession 30 Dec 2022
Revised Possession 30 Dec 2022
Extended Possession 30 Dec 2024
Litigations No Litigations
Last Modified 02 Apr 2024
Last Retrived 26 Jul 2025
Saffron Residency Phase -1 QR Code
Saffron Residency Phase -1
MahaRERA - P51800007485
Apartment Details & Configuration
TypeArea
2 BHK52.3 Sq.mts. ( 563 Sq.ft. )
2.5 BHK63.17 Sq.mts. ( 680 Sq.ft. )
Shop19.28 Sq.mts. ( 208 Sq.ft. )
Shop25.32 Sq.mts. ( 273 Sq.ft. )
Shop25.83 Sq.mts. ( 278 Sq.ft. )
Shop27.99 Sq.mts. ( 301 Sq.ft. )
Shop31.97 Sq.mts. ( 344 Sq.ft. )
1 BHK40.88 Sq.mts. ( 440 Sq.ft. )
1 BHK42.83 Sq.mts. ( 461 Sq.ft. )
Shop23.53 Sq.mts. ( 253 Sq.ft. )
Shop23.86 Sq.mts. ( 257 Sq.ft. )
Shop26.42 Sq.mts. ( 284 Sq.ft. )
Shop26.68 Sq.mts. ( 287 Sq.ft. )
Shop26.77 Sq.mts. ( 288 Sq.ft. )
Shop34.12 Sq.mts. ( 367 Sq.ft. )
Shop26.88 Sq.mts. ( 289 Sq.ft. )
1 BHK32.54 Sq.mts. ( 350 Sq.ft. )
1RK21.95 Sq.mts. ( 236 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Saffron Residency Phase -1last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Will Be Provided Bef Full Oc
Basement Parking Stack Parking50% completed
50% Complete
83 Stack Parking
Community Buildings
As Per Sg Authority Bef Oc
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
As Per Power Auth Bef Oc
Energy management100% completed
95% Complete
As Per Power Auth Bef Oc
Fire Protection And Fire Safety Requirements85% completed
85% Complete
As Per Cfo Noc Bef Oc
Landscaping & Tree Planting100% completed
95% Complete
As Per Mcgm Norms
Mechanical Tower Parking50% completed
50% Complete
Tower Parking
Open Parking50% completed
50% Complete
36 Open Parking - 12 Each For A / B / C Wing
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
As Per Drainage Layout Bef Oc
Solid Waste Management And Disposal100% completed
95% Complete
As Per Swm Remark Before Issue Of Oc
Storm Water Drains100% completed
95% Complete
As Per Swd Remrk Bef Oc
Street Lighting100% completed
95% Complete
As Per Consultant Design Bef Oc
Swimming Pool and other open amenities50% completed
50% Complete
Common Amenities
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
As Per Sewerage Remark &Amp; Swd Remark Bef Oc
Water Conservation, Rain water Harvesting100% completed
95% Complete
As Per Rwh Consultant Bef Oc
Water Supply100% completed
95% Complete
As Per P Form Before Oc
Buildings / Wings in Saffron Residency Phase -1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Saffron Residency Phase -1 by Ayodhya Construction Colast updated on 26 Jul 2025 as per information obtained from MARA RERA.

73222 Sq. ft.

Project Area

10903 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

287 apartments in total
Total
287
Booked
220
Available
67

Saleable Area Statistics (Sq. ft.)

137406 Total
Total
137406
Booked
102293
Available
35113
Total 287 apartments in project. 220 apartments booked. 76% apartments booked.
Total 137406 Sq.ft. saleable area. 102293 saleable area booked.
74% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing ADec 20211812101280
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK52.3 Sq.mts. ( 563 Sq.ft. )36
22 Booked61% Booked
61% Booked
2.5 BHK63.17 Sq.mts. ( 680 Sq.ft. )36
32 Booked88% Booked
88% Booked
Shop19.28 Sq.mts. ( 208 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop25.32 Sq.mts. ( 273 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop25.83 Sq.mts. ( 278 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop27.99 Sq.mts. ( 301 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop31.97 Sq.mts. ( 344 Sq.ft. )1
1 Booked100% Booked
100% Booked
77 total apartments / 58 apartments booked. 75% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress90% done
90% Booked
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BDec 20211812101280
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.88 Sq.mts. ( 440 Sq.ft. )18
14 Booked77% Booked
77% Booked
1 BHK42.83 Sq.mts. ( 461 Sq.ft. )18
16 Booked88% Booked
88% Booked
2 BHK52.3 Sq.mts. ( 563 Sq.ft. )36
22 Booked61% Booked
61% Booked
Shop23.53 Sq.mts. ( 253 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop23.86 Sq.mts. ( 257 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop26.42 Sq.mts. ( 284 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop26.68 Sq.mts. ( 287 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop26.77 Sq.mts. ( 288 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop34.12 Sq.mts. ( 367 Sq.ft. )1
None Booked0% Booked
0% Booked
78 total apartments / 54 apartments booked. 69% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress90% done
90% Booked
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CDec 20211812101280
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.88 Sq.mts. ( 440 Sq.ft. )18
16 Booked88% Booked
88% Booked
1 BHK42.83 Sq.mts. ( 461 Sq.ft. )18
14 Booked77% Booked
77% Booked
2 BHK52.3 Sq.mts. ( 563 Sq.ft. )36
19 Booked52% Booked
52% Booked
Shop23.53 Sq.mts. ( 253 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop23.86 Sq.mts. ( 257 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop26.42 Sq.mts. ( 284 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop26.77 Sq.mts. ( 288 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop26.88 Sq.mts. ( 289 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop34.12 Sq.mts. ( 367 Sq.ft. )1
1 Booked100% Booked
100% Booked
78 total apartments / 54 apartments booked. 69% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress86% done
86% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress75% done
75% Booked
Sanitary Fittings within the flats / premises
work-in-progress75% done
75% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress95% done
95% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing DDec 2021181010033
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.54 Sq.mts. ( 350 Sq.ft. )18
18 Booked100% Booked
100% Booked
1RK21.95 Sq.mts. ( 236 Sq.ft. )36
36 Booked100% Booked
100% Booked
54 total apartments / 54 apartments booked. 100% apartments booked.
Work Description in Building Wing DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress75% done
75% Booked
Sanitary Fittings within the flats / premises
work-in-progress75% done
75% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Ayodhya Construction Co
for Project
Saffron Residency Phase -1
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation