Project overview

Saffron Hills is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700012065. Saffron Hills is located at Sno 148 Hno 15A. This is a Ongoing being developed by Alpha Combines.

Saffron Hills has 1 BHK & 2 BHK Apartments with carpet areas ranging from 325 to 523 Sq.ft. Carpet. The Project has total 110 of which 41 are currently available for sale.

Saffron Hills is being developed on a total land area of 44671 Sq.ft. out of which 20773 Sq.ft. i.e 47% is reserved for recreational purposes. Saffron Hills has 3 Wings / Towers I,J,K

ProjectDeveloperLocationPossession
Jeevan LifestylesJeevan EnterprisesS N 148 / 13/1531-03-2019 00:00:00
Marathon Nagari Nx Vigo DMarathon Realty Pvt Ltd79/3Pt. 83/10Pt.30-06-2019 00:00:00
Marathon Nagari Nx Vitoria DMarathon Realty Pvt Ltd79/3Pt. 83/10Pt.31-12-2019 00:00:00
Mohan Areca IiMohan Lifespaces LlpSurvey No.4/Hissa No 1P31-12-2019 00:00:00
Shree Viraj Residency Wing C Phase -IiShree Viraj EnterprisesSurvey No 63 H No 5A Plot No 1 To 7, Survey No 63 H No 630-12-2022 00:00:00
Samarth VatikaShree Samarth Associates122Asurvey No 32 Shirgaon Badlapur30-12-2018 00:00:00
NisargShree Sai Unity Builders And DevelopersSurvey No 60 Hissa No 1 Plot No 1 And 231-12-2017 00:00:00
Kool Breeze Phase IiAbhishek Shelters LtdS No 127 H No 32 S No 13 H No 1231-05-2018 00:00:00
Shreeji Iconic Phase IRaj Laxmi Developers137B, 148 Hn1 And 2B, 145 Hn 130-05-2022 00:00:00
Khatri NxAashiyana ConstructionsGut No 111 Hissa No 3, 41, 4231-12-2019 00:00:00
Padmaprabha Co Op Hsg SocietyShree Mahaveer EnterprisesSurvey No 46 Plot No 23 24 H No 6A9 6A10 P30-04-2018 00:00:00
Vedant VastuVedant VentureSurvey No. 63, Hissa No. 4A8, Plot No. 831-12-2018 00:00:00
Mohan ArecaMohan Lifespaces LlpSurvey No 4/Hissa No 1P31-12-2019 00:00:00
Aryan One Wing G And HKonark Lifespaces70/1,70/2,71/1,75/1 ,75/2,75/3,75/5,75/6,76/1,76/2,76/3,77,78/3,79/9,79/1031-07-2018 00:00:00
Panvelkar OptimaVarad Vinayak DevelopersSurvey No 16 Hissa No 330-09-2020 00:00:00
Kalp NisargBls Ventures81/3A 3B30-03-2022 00:00:00
Aryan One Wing I And JKonark Lifespaces701,702,711,751,752,753,755,761,762,763,77,783,799,791031-10-2018 00:00:00
M/S. Shubham Karoti Complex Phase - IM/S. Shubham Karoti Enterprises146/4 B Plot 1,231-03-2018 00:00:00
M/S. Shubham Karoti Complex Phase - IiiM/S. Shubham Karoti EnterprisesThane, 42150331-03-2020 00:00:00
Jijabai ParkDnyaneshwar Mauli Builder & Developers83/1031-12-2018 00:00:00
Shubh AanganShubh EnterprisesSurvey No 52 H No 3131-12-2019 00:00:00
M/S. Shubham Karoti Complex Phase - IiM/S. Shubham Karoti Enterprises1484 B Plot 731-12-2018 00:00:00
Pathak ResidencyShree Mahalaxmi ConstructionsS No 82 1 A 1B31-03-2019 00:00:00
Surval HeightsGayatri DevelopersSurvey No 46 H No 11/12 And S No 83 H No 7/831-12-2023 00:00:00
Shubh Vastu Wing B And CShubh HomesSurvey No.143, Hissa No.3, 4 And 731-12-2025 00:00:00
Sarveshwar Co-Op Hsg SocDalal BuildscapeTaluka Ambernath30-06-2024 00:00:00
Saishyam ArcadeShubh BuildspaceSurvey No 20, Hissa No 2,431-12-2025 00:00:00
Shreeji IconicRaj Laxmi DevelopersSr No 137B And Sr No 9 H No 1031-12-2028 00:00:00
Samarth Shivani Co-Operative Housing Society LimitedGururaj Enterprises Builders And DevelopersS.No. 31, H. No. 2/A, Plot No. 8 & 931-08-2025 00:00:00
Ved HeightsOm RealityS.No. 96, H. No. 231-12-2026 00:00:00
Ram RiveraS No 29/A/3 Plot No 13 And 1430-09-2025 00:00:00
Park One Phase IiShree Laxmi EnterprisesSurvey No. 125, H.No. 1/A31-12-2027 00:00:00
Shiv ParadiseShiv CorporationPlot No 14 & 15 S No 45 H No 1/A/17 And 1 /A/1831-12-2025 00:00:00
Fulora Co-Op Housing Society LtdPinnacle CreatorsSurvey No 13 Hissa No 6 A 1731-07-2025 00:00:00
Satyam Sheela Wing FShreeji DevelopersSurvey No 72/4 And Survey No 73/1/B, Shirgaon,Badlapur-42150331-07-2026 00:00:00
Project Details
  • Project:
    Saffron Hills
  • Location:
  • Sno 148 Hno 15A
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2019
Developer Details

  • Developer:
    Alpha Combines
  • Phone:
  • Address:
  • Saffron Hills
Project RERA Details
MAHA REARA No: P51700012065
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Raj Associates Architect & Engineers
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 30 Jun 2019
Revised Possession 30 Jun 2019
Extended Possession 29 Dec 2020
Litigations No Litigations
Last Modified 14 Jun 2020
Last Retrived 26 Jul 2025
Saffron Hills QR Code
Saffron Hills
MahaRERA - P51700012065
Apartment Details & Configuration
TypeArea
1 BHK29.27 Sq.mts. ( 315 Sq.ft. )
1 BHK31.22 Sq.mts. ( 336 Sq.ft. )
2 BHK43.05 Sq.mts. ( 463 Sq.ft. )
1 BHK30.15 Sq.mts. ( 325 Sq.ft. )
1 BHK30.38 Sq.mts. ( 327 Sq.ft. )
2 BHK45.55 Sq.mts. ( 490 Sq.ft. )
2 BHK48.6 Sq.mts. ( 523 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Saffron Hillslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space50% completed
50% Complete
Partly Completed
Community Buildings50% completed
50% Complete
Club House Structure Work Is In Progress
Electrical Meter Room, Sub-Station, Receiving Station
Yet Not Started
Energy management
Yet Not Started
Fire Protection And Fire Safety Requirements30% completed
30% Complete
Partly Completed
Landscaping & Tree Planting50% completed
50% Complete
Tree Planting Work Is In Progress
Open Parking
Yet Not Started
Sewerage (Chamber, Lines, Septic Tank , STP)
Septic Tank Work Yet Not Started
Solid Waste Management And Disposal
Na
Storm Water Drains50% completed
50% Complete
Partly Work Completed
Street Lighting
Internal Light Provided By Owner
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Yet Not Started
Water Supply
Mjp Will Provide
Buildings / Wings in Saffron Hills
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Saffron Hills by Alpha Combineslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

44671 Sq. ft.

Project Area

20773 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

110 apartments in total
Total
110
Booked
69
Available
41

Saleable Area Statistics (Sq. ft.)

39587 Total
Total
39587
Booked
23316
Available
16271
Total 110 apartments in project. 69 apartments booked. 62% apartments booked.
Total 39587 Sq.ft. saleable area. 23316 saleable area booked.
59% area booked.

I

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
IJun 20198100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.27 Sq.mts. ( 315 Sq.ft. )7
6 Booked85% Booked
85% Booked
1 BHK31.22 Sq.mts. ( 336 Sq.ft. )16
13 Booked81% Booked
81% Booked
2 BHK43.05 Sq.mts. ( 463 Sq.ft. )8
31 total apartments / 20 apartments booked. 64% apartments booked.
Work Description in Building ICompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress81% done
81% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

J

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
JJun 20198100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.27 Sq.mts. ( 315 Sq.ft. )15
14 Booked93% Booked
93% Booked
1 BHK31.22 Sq.mts. ( 336 Sq.ft. )16
11 Booked68% Booked
68% Booked
31 total apartments / 25 apartments booked. 80% apartments booked.
Work Description in Building JCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress81% done
81% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

K

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
KJan 19007100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.15 Sq.mts. ( 325 Sq.ft. )7
6 Booked85% Booked
85% Booked
1 BHK30.38 Sq.mts. ( 327 Sq.ft. )27
14 Booked51% Booked
51% Booked
2 BHK45.55 Sq.mts. ( 490 Sq.ft. )7
4 Booked57% Booked
57% Booked
2 BHK48.6 Sq.mts. ( 523 Sq.ft. )7
None Booked0% Booked
0% Booked
48 total apartments / 24 apartments booked. 50% apartments booked.
Work Description in Building KCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress33% done
33% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress30% done
30% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress30% done
30% Booked
Channel Partners
Channel Partners Registered by Developer
Alpha Combines
for Project
Saffron Hills
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation